Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.↗

Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

Muscettola, Nicola↗

Development of shuttle payloads

The development of payloads for the Shuttle is described in terms of two activities - one is oriented towards development of payload hardware, while the other is oriented towards the development of payload/Space Transportation System (STS) planning, scheduling, and integration techniques. This second activity is called STS Utilization Planning (SUP). In addition to describing the major aspects of SUP, a discussion of development activities on three payloads that typify direct Shuttle placement missions is included. These payloads are the First Spacelab Mission, the Atmospheric, Magnetospheric, and Plasmas in Space (AMPS) payload, and the Large Space Telescope (LST).

Murphy, J. T.↗

Decomposability and scalability in space-based observatory scheduling

In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling framework. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) scheduling problem, motivated by the limitations of the current solution and, more generally, the insufficiency of classical planning and scheduling approaches in this problem context. We first summarize the salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research. Then, we describe some key problem decomposition techniques supported by HSTS and underlying our integrated planning and scheduling approach, and we discuss the leverage they provide in solving space-based observatory scheduling problems.

Muscettola, Nicola↗

The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

Hornstein, Rhoda S.↗

Real-time contingency handling in MAESTRO

A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.

Britt, Daniel L.↗

BIO-Plex Information System Concept

This paper describes a suggested design for an integrated information system for the proposed BIO-Plex (Bioregenerative Planetary Life Support Systems Test Complex) at Johnson Space Center (JSC), including distributed control systems, central control, networks, database servers, personal computers and workstations, applications software, and external communications. The system will have an open commercial computing and networking, architecture. The network will provide automatic real-time transfer of information to database server computers which perform data collection and validation. This information system will support integrated, data sharing applications for everything, from system alarms to management summaries. Most existing complex process control systems have information gaps between the different real time subsystems, between these subsystems and central controller, between the central controller and system level planning and analysis application software, and between the system level applications and management overview reporting. An integrated information system is vitally necessary as the basis for the integration of planning, scheduling, modeling, monitoring, and control, which will allow improved monitoring and control based on timely, accurate and complete data. Data describing the system configuration and the real time processes can be collected, checked and reconciled, analyzed and stored in database servers that can be accessed by all applications. The required technology is available. The only opportunity to design a distributed, nonredundant, integrated system is before it is built. Retrofit is extremely difficult and costly.

Jones, Harry↗

Graph-Based Modeling and Decomposition of Hierarchical Optimization Problems

We present a graph-theoretic modeling approach for hierarchical optimization that leverages the OptiGraph abstraction implemented in the Julia package Plasmo.jl. We show that the abstraction is flexible and can effectively capture complex hierarchical connectivity that arises from decision-making over multiple spatial and temporal scales (e.g., integration of planning, scheduling, and operations in manufacturing and infrastructures). We also show that the graph abstraction facilitates the conceptualization and implementation of decomposition and approximation schemes. Specifically, we propose a graph-based Benders decomposition (gBD) framework that enables the exploitation of hierarchical (nested) structures and that uses graph aggregation/partitioning procedures to discover such structures. In addition, we provide a Julia implementation of gBD, which we call PlasmoBenders.jl. We illustrate the capabilities using examples arising in the context of energy and power systems.

97 MATHEMATICS AND COMPUTING↗

Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

scheduling↗

Learning to integrate reactivity and deliberation in uncertain planning and scheduling problems

This paper describes an approach to planning and scheduling in uncertain domains. In this approach, a system divides a task on a goal by goal basis into reactive and deliberative components. Initially, a task is handled entirely reactively. When failures occur, the system changes the reactive/deliverative goal division by moving goals into the deliberative component. Because our approach attempts to minimize the number of deliberative goals, we call our approach Minimal Deliberation (MD). Because MD allows goals to be treated reactively, it gains some of the advantages of reactive systems: computational efficiency, the ability to deal with noise and non-deterministic effects, and the ability to take advantage of unforseen opportunities. However, because MD can fall back upon deliberation, it can also provide some of the guarantees of classical planning, such as the ability to deal with complex goal interactions. This paper describes the Minimal Deliberation approach to integrating reactivity and deliberation and describe an ongoing application of the approach to an uncertain planning and scheduling domain.

Chien, Steve A.↗

Scheduling Spitzer: The SIRPASS Story

NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

flight systems↗

Optimum-AIV: A planning and scheduling system for spacecraft AIV

A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

Arentoft, M. M.↗

Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine↗

Perspectives on future research directions in green manufacturing for discrete products

With the increasing concern due to climate change caused by a higher atmospheric concentration of CO 2 and other greenhouse gases, reducing environmental impact is becoming more important for every part of society. Manufacturing is responsible for a significant amount of energy/material consumption and environmental burden and, therefore, has a great opportunity to reduce its impact through green manufacturing. Green manufacturing presents opportunities across the manufacturing enterprise to increase the efficient usage of energy and material resources. These opportunities include designing products to consume fewer materials and energy during manufacturing and use, incorporating more efficient manufacturing processes, streamlining and optimizing manufacturing schedules and plans, and circularizing products. The goal of this paper will be to provide a perspective from the authors on the opportunities that exist within green manufacturing for discrete products through a review of pertinent topics and future directions. The paper will focus on processes, manufacturing equipment, manufacturing systems, recovering value at a product’s end-of-life, and additional thoughts that include metrics and indicators, techno-economic assessment, and a discussion of efficiency and effectiveness. Key findings from this review include a need for social indicators and renewable energy considerations in scheduling and process planning, integrating Industry 4.0 into circular economy along with social and institutional dimensions, consistency in the ability to measure and conceptualize metrics and indicators, a detailed evaluation of the life cycle impacts and cost of Addit Manuf, and more human and environment-oriented considerations for smart manufacturing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

A Successful Infusion Process for Enabling Lunar Exploration Technologies

The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.

Over, Ann P.↗