Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Scheduling lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

Ringer, Mark J.↗

Onboard planning for geological investigations using a rover team

This paper describes an integrated system for coordinating multiple rover behavior with the overall goal of collecting planetary surface data. The Multi-Rover Integrated Science Understanding System (MISUS) combines techniques from planning and scheduling with machine learning to perform autonomous scientific exploration with cooperating rovers.

scheduling↗

Research and applications: Artificial intelligence

Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

Raphael, B.↗

UAV Research at NASA Langley: Towards Safe, Reliable, and Autonomous Operations

Unmanned Aerial Vehicles (UAV) are fundamental components in several aspects of research at NASA Langley, such as flight dynamics, mission-driven airframe design, airspace integration demonstrations, atmospheric science projects, and more. In particular, NASA Langley Research Center (Langley) is using UAVs to develop and demonstrate innovative capabilities that meet the autonomy and robotics challenges that are anticipated in science, space exploration, and aeronautics. These capabilities will enable new NASA missions such as asteroid rendezvous and retrieval (ARRM), Mars exploration, in-situ resource utilization (ISRU), pollution measurements in historically inaccessible areas, and the integration of UAVs into our everyday lives all missions of increasing complexity, distance, pace, and/or accessibility. Building on decades of NASA experience and success in the design, fabrication, and integration of robust and reliable automated systems for space and aeronautics, Langley Autonomy Incubator seeks to bridge the gap between automation and autonomy by enabling safe autonomous operations via onboard sensing and perception systems in both data-rich and data-deprived environments. The Autonomy Incubator is focused on the challenge of mobility and manipulation in dynamic and unstructured environments by integrating technologies such as computer vision, visual odometry, real-time mapping, path planning, object detection and avoidance, object classification, adaptive control, sensor fusion, machine learning, and natural human-machine teaming. These technologies are implemented in an architectural framework developed in-house for easy integration and interoperability of cutting-edge hardware and software.

Davila, Carlos G.↗

Virginia Demonstration Project Encouraging Middle School Students in Pursuing STEM Careers

Encouraging students at all grade levels to consider pursuing a career in Science, Technology, Engineering, and Mathematics (STEM) fields i s a national focus. In 2005, the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), a Department of Defense laboratory located in Da hlgren, Virginia, began work on the Virginia Demonstration Project (VDP) with the goal of increasing more student interest in STEM educatio n and pursuing STEM careers. This goal continues as the program enters its sixth year. This project has been successful through the partici pation of NSWCDD's scientists and engineers who are trained as mentor s to work in local middle school classrooms throughout the school year, As an extension of the in-class activities, several STEM summer aca demies have been conducted at NSWCDD, These academies are supported by the Navy through the VDP and the STEM Learning Module Project. These projects are part of more extensive outreach efforts offered by the National Defense Education Program (NDEP), sponsored by the Director, Defense Research and Engineering. The focus of this paper is on the types of activities conducted at the summer academy, an overview of the academy planning process, and recommendations to help support a nati onal plan of integrating modeling and simulation-based engineering and science into all grade levels. based upon the lessons learned

Bachman, Jane T.↗

Fourth Conference on Artificial Intelligence for Space Applications

Proceedings of a conference held in Huntsville, Alabama, on November 15-16, 1988. The Fourth Conference on Artificial Intelligence for Space Applications brings together diverse technical and scientific work in order to help those who employ AI methods in space applications to identify common goals and to address issues of general interest in the AI community. Topics include the following: space applications of expert systems in fault diagnostics, in telemetry monitoring and data collection, in design and systems integration; and in planning and scheduling; knowledge representation, capture, verification, and management; robotics and vision; adaptive learning; and automatic programming.

Odell, Stephen L.↗

Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

Roberts, Barry C.↗

Ensemble Forecasting/Assimilation/Emissions Estimation with WRF-Chem/DART: Accomplishments, Lessons Learned, and Future Plans

Over the past ten years, we have been conducting research on regional ensemble atmospheric composition forecasting/data assimilation/emissions estimation with WRF-Chem/DART. WRF- Chem/DART integrates the Weather Research and Forecasting model (WRF) with online chemistry (WRF-Chem) into the Data Assimilation Research Testbed (DART). DART is an ensemble data assimilation system based on the ensemble adjustment Kalman filter (EAKF) with adaptive inflation, localization (physical and state space), and an optional non-Gaussian formulation of the EAKF. DART includes assimilation of meteorological and limited chemical observations. WRF-Chem/DART extends DART to include assimilation of: MOPITT CO; IASI CO and O3; MODIS AOD; OMI O3, NO2, and SO2; TROPOMI CO, O3, NO2, and SO2, TES CO, CO2 (research mode), O3, NH3, and CH4 (research mode); CrIS CO, O3, NH3, CH4 (research mode), and PAN; SCIAMACHY NO2; GOME2a NO2; MLS O3 and HNO3; and proxy TEMPO O3, and NO2 satellite retrievals as raw retrievals or as ‘compact phase space retrievals’ (CPSRs) for profile retrievals. WRF-Chem/DART also assimilates in situ atmospheric composition measurements and uses the ‘state augmentation method’ for emissions estimation. In our presentation, we will provide an overview of WRF-Chem/DART: • applications and results; • lessons learned from: (i) independent versus joint assimilation; (ii) total/partial column versus profile retrieval assimilation; (iii) joint in situ and retrieval assimilation; (iv) assimilation at grid resolutions ranging from 100 km to 4 km; (v) dynamic emissions estimation; and • future work related to wildfire emissions estimation and intercomparison of CMAQ (online)/JEDI and CMAQ (online and offline)/DART.

WRF-Chem/DART↗

Automated Planning and Scheduling for Space Mission Operations

Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

scheduling↗

Lessons Learned on Operating and Preparing Operations for a Technology Mission from the Perspective of the Earth Observing-1 Mission

The New Millennium Program's first Earth-observing mission (EO-1) is a technology validation mission. It is managed by the NASA Goddard Space Flight Center in Greenbelt, Maryland and is scheduled for launch in the summer of 2000. The purpose of this mission is to flight-validate revolutionary technologies that will contribute to the reduction of cost and increase of capabilities for future land imaging missions. In the EO-1 mission, there are five instrument, five spacecraft, and three supporting technologies to flight-validate during a year of operations. EO-1 operations and the accompanying ground system were intended to be simple in order to maintain low operational costs. For purposes of formulating operations, it was initially modeled as a small science mission. However, it quickly evolved into a more complex mission due to the difficulties in effectively integrating all of the validation plans of the individual technologies. As a consequence, more operational support was required to confidently complete the on-orbit validation of the new technologies. This paper will outline the issues and lessons learned applicable to future technology validation missions. Examples of some of these include the following: (1) operational complexity encountered in integrating all of the validation plans into a coherent operational plan, (2) initial desire to run single shift operations subsequently growing to 6 "around-the-clock" operations, (3) managing changes in the technologies that ultimately affected operations, (4) necessity for better team communications within the project to offset the effects of change on the Ground System Developers, Operations Engineers, Integration and Test Engineers, S/C Subsystem Engineers, and Scientists, and (5) the need for a more experienced Flight Operations Team to achieve the necessary operational flexibility. The discussion will conclude by providing several cost comparisons for developing operations from previous missions to EO-1 and discuss some details that might be done differently for future technology validation missions.

Mandl, Dan↗

The Robonaut 2 Hand - Designed to do Work with Tools

The second generation Robonaut hand has many advantages over its predecessor. This mechatronic device is more dexterous and has improved force control and sensing giving it the capability to grasp and actuate a wider range of tools. It can achieve higher peak forces at higher speeds than the original. Developed as part of a partnership between General Motors and NASA, the hand is designed to more closely approximate a human hand. Having a more anthropomorphic design allows the hand to attain a larger set of useful grasps for working with human interfaces. Key to the hand s improved performance is the use of lower friction drive elements and a redistribution of components from the hand to the forearm, permitting more sensing in the fingers and palm where it is most important. The following describes the design, mechanical/electrical integration, and control features of the hand. Lessons learned during the development and initial operations along with planned refinements to make it more effective are presented.

Bridgwater, L. B.↗

Integrated planning and scheduling for Earth science data processing

Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

Boddy, Mark↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

Sauerwein, Timothy A.↗

Human Systems Integration in the Federal Government

Human Systems Integration principles and methods can be used to help integrate people, technology, and organizations in an effective and efficient manner. Over the past decade, a wide range of tools, techniques, and technologies have been developed by federal agencies to achieve significant cost and performance benefits. In this discussion, we will explore trends in military human systems integration and learn about the critical role being played by human performance and effectiveness research. We will also examine case studies on the planning and design of future human space flight vehicles, the national air space system and the first nuclear reactors to be built in the United States in over 30 years. And with an eye toward sustaining the discipline s principles and methods, we ll take a look at educating and training the next generation of human systems integration practitioners.

Jones, Patricia M.↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Flight Systems Integration & Test: Lessons Learned for Future Success

This paper offers a comprehensive view of flight system integration and test (I&T) lessons learned related to mishaps and close calls, focusing on what can be done to improve the I&T process to avoid recurrence. Specific areas within the realm of I&T that are covered in this paper include: I&T team communication and training; design of flight and ground systems for I&T; planning and scheduling; configuration management and process documentation; ground support equipment and tools; cleanrooms and contamination; mechanical integration, handling, and deployments; electrical integration and electrostatic discharge; functional testing and troubleshooting; environmental testing and facilities; and launch site operations. To illustrate "real-world" lessons learned for I&T, examples from throughout the history of the U.S. space program are presented. Also presented are some best practices for I&T that can help mitigate mishaps and close calls on the ground or during flight.

Integration & Test↗

Orion Pad Abort 1 Flight Test - Ground and Flight Operations

This paper discusses the ground and flight operations aspects to the Pad Abort 1 launch. The paper details the processes used to plan all operations. The paper then discussions the difficulties of integration and testing, while detailing some of the lessons learned throughout the entire launch campaign. Flight operational aspects of the launc~ are covered in order to provide the listener with the full suite of operational issues encountered in preparation for the first flight test of the Orion Launch Abort System.

Hackenberg, Davis L.↗

Flight Systems Integration and Test

Topics to be Covered in this presentation are: (1) Integration and Test (I&T) Planning (2) Integration and Test Flows (3) Overview of Typical Mission I&T (4) Supporting Elements (5) Lessons-Learned and Helpful Hints (6) I&T Mishaps and Failures (7) The Lighter Side of I&T and (8) Small-Group Activity. This presentation highlights a typical NASA "in-house" I&T program (1) For flight systems that are developed by NASA at a space flight center (like GSFC) (2) Requirements well-defined: qualification/acceptance, documentation, configuration management. (3) Factors: precedents, human flight, risk-aversion ("failure-phobia"), taxpayer dollars, jobs and (4) Some differences among NASA centers, but generally a resource-intensive process

Wright, Michael R.↗