Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Importance of Window Installation in Residential Building Envelopes Having Continuous External Insulation in Order to Realize Energy Efficiency

Residential buildings are one of the prime candidates in the United States for reducing energy consumption. Continuous exterior insulation (CEI) is being used increasingly often in residential buildings to improve energy efficiency. Windows constitute 15–40% of a building envelope and are the weakest component in energy performance. The installation of windows in walls with CEI has not been well evaluated. We identified four cases of installing windows in walls with CEI of 25–76 mm (1–3 in.) thickness and analyzed the energy loss between the window and wall interface (flanking loss), structural issues, air leakage, and moisture penetration. Thermal analysis showed that the insulation value (RSI) of the 305 mm (12 in.) perimeter wall surrounding a window decreased by 7.6–34.5% in the four cases when compared with the RSI of the wall without the window. A window installation method is proposed to address the issues likely to occur with installation methods currently being used in the field. An out-of-the-box installation system was also designed to achieve a better thermal performance, cost effectiveness, and structural performance in high-performance residential buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vapor Phase Installation of CpCo(CO) 2 in MOF‐808

Metal-organic frameworks (MOFs), including MOF-808 present an opportunity for vapor phase installation of reactive centers that may serve as uniform sites for precision catalysis. The mechanism of cobalt installation in MOF-808 through atomic layer deposition (ALD) upon CpCo(CO )2 exposure is investigated through in situ FTIR spectroscopy complemented by density functional theory modeling. The role of subsequent H 2 O exposure in the hydrolysis of carbonyl and cyclopentadienyl ligands to complete the installation is also investigated. In situ FTIR study reveals that upon exposure of CpCo(CO) 2 to MOF-808 at 115 °C, a long-lived, stable intermediate is formed that presents carbonyl stretching vibrations similar to the undissociated precursor that are attributed to multiple chemisorbed carbonyl complexes. In MOF-808, cobalt species are initially absorbed near the BTC linker rather than directly on the nodes, revealing the importance of non-covalent interactions in the installation process. DFT suggests that H 2 O exposure promotes carbonyl elimination but leaves a cyclopentadienyl-capped cobalt that is more stable than the complete hydrolysis product. The simulations are consistent with cobalt installation in MOF-808 using CpCo(CO) 2 and H 2 O at 115 °C and further consistent with the lack of ALD thin film deposition of cobalt oxide thin films on planar supports.

36 MATERIALS SCIENCE↗

Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm

To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.

43 PARTICLE ACCELERATORS↗

Floating Photovoltaic System Cost Benchmark: Q1 2021 Installations on Artificial Water Bodies

In this report, we conduct a bottom-up analysis of the installed costs for FPV systems deployed on artificial water bodies under average site conditions (wind load of about 40 m/s, snow load of 20 psf, water depth of 50 m, water level variation of 10 m, and swell height of 1 m). We estimate an installed system cost premium of $\$0.26$/WDC (25%) for 10-MWDC fixed-tilt FPV systems, compared with ground-mounted, fixed-tilt PV installed over bare ground. Higher structural costs related to the floats and anchoring system are the largest contributors to this premium. Currently, site investigation costs are also higher for FPV because of the additional effort needed to plan and design these more complex installations. Our preliminary sensitivity analysis shows that the installed cost of FPV systems is most sensitive to float costs, wind and snow loading, and module efficiency. FPV deployment is in an early stage, and additional experience, best practice development, and new configurations and technologies could help reduce the costs of FPV systems over time.

14 SOLAR ENERGY↗

Empirical Estimation of the Energy Impacts of Projects Installed through Residential Property Assessed Clean Energy Financing Programs in California

We examine the energy use impacts of energy efficiency and solar PV projects financed by residential property assessed clean energy (R-PACE) programs in California. We leverage household-level interval meter data to apply normalized metered energy consumption (NMEC) methods at significant scale—more than 25,000 electric meters and more than 15,000 gas meters. We develop a comparison group to account for non-project-related changes in usage. The projects include homes that replaced existing HVAC equipment with higher-efficiency units and homes that installed central heating or air conditioning equipment for the first time. We have limited information on pre-project household equipment stock so we develop a method to infer new installations. We find that projects that installed energy efficiency technologies reduce electricity consumption by approximately 3% and gas consumption by approximately 3.5% on average. When we remove homes that installed new cooling and heating equipment for the first time, savings rise to approximately 5% for electricity and approximately 6% for gas. Given the California climate and the results of an existing study of similar California projects, these results are in line with expectations. Solar PV projects produce electricity that offsets approximately 69% of household electricity consumption on average. We estimate that California R-PACE projects installed through the end of 2019 produce annual reductions in grid-tied electricity consumption of 506 GWh (equivalent to the electricity consumption of approximately 74,000 California households) and gas consumption reductions of 2 million therms (equivalent to the gas consumption of approximately 4700 California households) in a typical weather year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vehicle for installing anchors in an underwater substrate

A method of installing one or more anchors in an underwater substrate in a body of water including installing an anchor into the underwater substrate by rotating an anchor installation vehicle about a central axis Y to drive the anchor coupled to the anchor installation vehicle into the underwater substrate. The anchor installation vehicle includes a vehicle frame having a top end and bottom end, a plurality of arms extending outward from the vehicle frame, one or more rotational thrusters disposed at distal ends of the respective arms, and an anchor system that holds the anchor extending from the bottom end of the vehicle frame with the anchor aligned with a central axis Y.

42 ENGINEERING↗

Impact of installation faults in air conditioners and heat pumps in single-family homes on U.S. energy usage

To ensure that new residential air conditioners and heat pumps operate optimally, care must be taken during the initial system design and installation to avoid missteps that immediately degrade a system’s performance. Laboratory and simulation studies have quantified the impact that faults can have on capacity and efficiency. Field studies have demonstrated that installation-related faults are commonplace. However, the national impact of installation-related faults cannot be accurately estimated by only simulating a limited number of homes at several fault levels because of the variety of home characteristics and climates involved. In our analysis, we use an improved residential building stock simulation tool to predict the annual energy increase and additional utility costs resulting from two common installation faults: indoor airflow rate and refrigerant charge level. Our method considers the wide range of building characteristics and climate zones of the U.S. housing stock. We use existing field data to develop fault intensity probability distributions to inform our analysis. The study shows that these two faults result in approximately 20.7 TWh/y of additional energy use for central air conditioners and air-source heat pumps in U.S. single-family detached homes, which is a 9% increase over baseline (no-fault) usage, costing homeowners approximately $2.5 billion annually on utility bills. Air-source heat pumps are responsible for a disproportionate fraction of this energy use increase because of the larger number of operating hours compared to central air conditioners and the sensitivity of heating mode performance to the faults analyzed compared to cooling mode.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Installer Badges Toolkit and Visualization Resources

NREL staff (Jal Desai and Cory Chovanec) will introduce the U.S. Department of Energy Weatherization Assistance Program (DOE WAP) Installer Badges Toolkit. The presentation will cover topics such as how this toolkit can be customized and implemented in a program, the potential benefits of using the Badges, and lessons learned from other implementers. This session will also engage participants to share their experiences regarding their existing training and how they are bringing their workforce up to speed in their building envelope-related programs. The Installer Badges Toolkit consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify the work, applicable material requirements, and references to DOE's Standard Work Specifications (SWS) or other relevant standards. Workers earn Badges by completing each task and receiving approval from a qualified supervisor. The Badges provide a consistent approach to training by ensuring that installers are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. NREL staff will also showcase new visualization resources like the Single-family and manufactured home job aids and the Single-family 3D house tool.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

Opportunities for installed combined heat and power (CHP) to increase grid flexibility in the U.S.

Increasing use of renewable energy requires sufficient grid flexibility to address uncertainty and variability in electricity generation. Previous studies suggest that combined heat and power (CHP) systems may support grid flexibility but they do not consider operating hours. In this paper, we used CHP operating data and determined annual and monthly availability of the installed CHP capacity from various sectors (e.g., utility, independent power producer, commercial, and industrial) in all seven U.S. independent system operators (ISOs) and regional transmission organizations (RTOs). Also, we estimated hourly CHP availability installed in five facility types (i.e., hospitals, universities, hotels, offices, and manufacturing) in the state of New York. The results show that regardless of ISO/RTO, sector, or season, more than 40% of the installed CHP capacity (0.7–8.7 GW) was not fully utilized in 2019; the results are similar for 2018. This available CHP capacity accounted for up to 9% of the ISO/RTO's peak electric demand, which may yield cost savings up to $16 billion by avoiding installation costs of new natural gas combustion or combined-cycle turbines. To exploit the available CHP capacity to enhance grid flexibility, we recommend different policy implications including flexible contract lengths between CHP owners and grid operators, improved market designs, and simplified interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The roles of learning mechanisms in services: Evidence from US residential solar installations

Non-hardware costs are majority of the cost of producing solar photovoltaic (PV) electricity. Here we use matched data on patents and over 125,000 residential PV installations to estimate the effects of three learning mechanisms in reducing PV costs: learning by doing, searching, and interacting. While previous work in this area has focused predominantly on learning by doing, we find that learning by searching and interacting are also significant mechanisms to facilitate non-hardware cost reductions. Including these two mechanisms reduces the effect of learning by doing in explaining non-hardware cost reductions by 43%. Our results suggest that prior work may overemphasize the role of learning by doing and the policies that help generate learning by doing. Analysis of the supplier-network between installers and their suppliers shows that concentrated supplier networks are associated with lower non-hardware costs, although there are key differences between installer-panel and installer-inverter manufacturer networks. An important implication is that policies for reducing non-hardware costs need to take a more complete view of how different learning mechanisms engender cost reductions. They should particularly consider the important role of learning in supplier networks in cost reductions—an effect that until now has largely been missing in analyses of solar non-hardware costs.

14 SOLAR ENERGY↗

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, U.S.A. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m 3 each. The detector uses liquid argon both as target and as active medium. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground Laboratory (LNGS), in a three-year run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment have been completely re-designed and rebuilt, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the ICARUS Collaboration. Design, installation, testing, commissioning and operation are the result of a common effort of CERN, Fermilab and INFN groups.

Cryogenic detectors↗

Full Scale 3D Computational Model of the Industrial -Scale Coal Fired Boiler Performance for Temperature Sensor Installation Guidance

Abstract Nearly 30% of the electricity is generated by using coal as the primary fuel in the US. One of the major concerns in coal-fired power plants is the failure of boiler tubes that leads to unscheduled maintenance and has a huge economical and societal impact. High temperature flue gas along with ash pass over the boiler tubes, which over time leads to tube failure. Therefore, developing temperature sensors for harsh environments and install them for temperature sensing and boiler tube lifetime prediction is an urgent need. On the side of sensor development, the location of the sensor installation is important for stable sensing performance and easy calibration. In this study, computational fluid dynamics and heat transfer modeling are adopted to establish a full-scale 3-dimensional model of a coal-fired boiler to investigate the flue gas temperature distribution within the boiler and identify the proper locations for sensor installation. We proposed three criteria to select the temperature sensor installation location: (1) select the boiler tube panel away from the sidewalls, (2) select the boiler tube section closer to the top wall of the boiler; and (3) select the boiler tube on the back of the boiler panel (not directly facing the flue gas flow). In these regions, the flue gas temperature is stable, providing an ideal environment for stable temperature sensing and calibration.

Gupta, Tanuj↗

Installation and imaging of thousands of minirhizotrons to phenotype root systems of field-grown plants

Roots are vital to plant performance because they acquire resources from the soil and provide anchorage. However, it remains difficult to assess root system size and distribution because roots are inaccessible in the soil. Existing methods to phenotype entire root systems range from slow, often destructive, methods applied to relatively small numbers of plants in the field to rapid methods that can be applied to large numbers of plants in controlled environment conditions. Much has been learned recently by extensive sampling of the root crown portion of field-grown plants. But, information on large-scale genetic and environmental variation in the size and distribution of root systems in the field remains a key knowledge gap. Minirhizotrons are the only established, non-destructive technology that can address this need in a standard field trial. Prior experiments have used only modest numbers of minirhizotrons, which has limited testing to small numbers of genotypes or environmental conditions. This study addressed the need for methods to install and collect images from thousands of minirhizotrons and thereby help break the phenotyping bottleneck in the field. Over three growing seasons, methods were developed and refined to install and collect images from up to 3038 minirhizotrons per experiment. Modifications were made to four tractors and hydraulic soil corers mounted to them. High quality installation was achieved at an average rate of up to 84.4 minirhizotron tubes per tractor per day. A set of four commercially available minirhizotron camera systems were each transported by wheelbarrow to allow collection of images of mature maize root systems at an average rate of up to 65.3 tubes per day per camera. This resulted in over 300,000 images being collected in as little as 11 days for a single experiment. The scale of minirhizotron installation was increased by two orders of magnitude by simultaneously using four tractor-mounted, hydraulic soil corers with modifications to ensure high quality, rapid operation. Image collection can be achieved at the corresponding scale using commercially available minirhizotron camera systems. Along with recent advances in image analysis, these advances will allow use of minirhizotrons at unprecedented scale to address key knowledge gaps regarding genetic and environmental effects on root system size and distribution in the field.

54 ENVIRONMENTAL SCIENCES↗

Installation of Lysimeters Near Engineered Trench 3

Three new lysimeter stations were installed on the north rim of Engineered Trench 3 (Figure ES-1)at the E-Area Low Level Waste Facility (ELLWF). These stations were designated as ET3-VL-3, ET3-VL-4, and ET3-VL-5. The stations were installed in a line with the two existing stations (ET3-VL-1 and ET3-VL-2) and spaced approximately 100 ft apart. Two lysimeters were installed at each station at the depths shown in Table ES-1. Lysimeter placement was based on borehole lithology and was comparable to the existing lysimeter stations. The deepest lysimeter at each of the three new lysimeter stations was designated as the action-level lysimeter.Following installation, the lysimeters were purged and placed under vacuum for sampling. Sampling occurred in December 2020 with each lysimeter producing 1000 ml of water for tritium analysis. All lysimeters were below the administrative limit for ET3 (43.7 pCi/ml) with all but ET3-VL-5 (222) at background levels. ET3-VL-5 (222) had a tritium concentration of 27.5 pCi/ml.With the addition of the new lysimeters at ET3, the vadose zone monitoring system is now comprised of 309 active lysimeters at 102 lysimeter stations. There are 93 action-level lysimeters at 102 stations

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗