Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY↗

Defining Wind Energy Experience

Since 2015, the U.S. wind installed capacity has grown from 73 to over 120 gigawatts, creating jobs across many sectors and educational levels. The growth of the wind workforce will need to continue to meet the goal of 20% wind by 2030, as well as the Biden administration's goals to reduce greenhouse gas pollution by 2030, reach 100% carbon-free electricity by 2035, and achieve net-zero greenhouse gas emissions no later than 2050. Despite the needed and anticipated growth, there are challenges to meeting this demand. Research has consistently shown that it has been a challenge finding qualified applicants for open wind industry jobs. Between 2012 and 2018, the difficulty of finding qualified applicants increased from 62% to 68% according to industry respondents. In 2017, educational institutions and training programs reported that 67% of their students did not enter the wind energy industry. Research conducted in 2020 showed that 83% of interested workers had some or great difficulty finding job opportunities. In exploring reasons for this gap, the researchers found that challenges were primarily influenced by education, experience, and geography. This difficulty for wind industry employers, educational institutions, and the potential workforce is known as the "wind energy workforce gap." This report further investigates the experience aspect of this gap.

17 WIND ENERGY↗

Cost details from front-end engineering design of piperazine with the advanced stripper

This Front-End Engineering Design (FEED) was funded by the U.S. Department of Energy (DOE) to estimate the cost to capture and compress 90% of the CO 2 from an existing natural gas combined cycle (NGCC) in Denver City, Texas, USA. The FEED used the PZAS (Piperazine with the Advanced Stripper) 2G amine scrubbing technology developed and modeled by The University of Texas at Austin. This FEED is unique in providing more public cost details than other FEEDs funded by DOE. The primary objective of the FEED was to provide a comprehensive estimate for the total installed cost of the capture plant. The estimated capital cost of NGCC at the Mustang Station is $\$727$ million for a capacity of 460 MW and 1.6 million tonnes CO 2 /yr. This includes a contingency of $\$104.6$ million and a contractor’s profit of $\$60.1$ million. The total direct field cost is $\$384.1$ million. With an optimistic fuel value of $\$3$/MMBtu, the estimated cost of capture varies from $\$85$/t at 4% IRR/85% load to $\$170$/t at 10% IRR/52% load. Air cooling is technically feasible but expensive. The air cooling systems for the water wash and pump-around intercooling account for 23.4% of the direct cost. The gas-fired boilers represent only 4% of the direct costs, but steam extraction would reduce energy cost, free up cooling water, and reduce the direct costs of processing additional flue gas and CO 2 from the boilers. The absorbers represent 9.6% of the direct cost in this FEED with no direct contact cooler and only 7.6 m of packing. Furthermore, the solvent cross exchangers are less expensive than expected (2.5% of direct costs). Doubling the number of these exchangers could reduce the heat duty from 3.0 to 2.5 GJ/t CO 2 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A Simulation Study of 120V Heat Pump Water Heaters

A 120 V heat pump water heater (HPWH) is a direct plug-in option to replace gas water heater (WH) without needing expensive electric panel upgrade to 220 V. To enable the smooth transition, the HPWH should provide comparable water heating capacity as the gas WH. WH capacities are rated in the form of first hour rating (FHR). Typical home gas WHs have FHRs > 65 gallon with a 40-gallon water tank. It imposes a major challenge on 120V HPWHs. Most 120V circuits in US can provide 1,800 to 2,400W, not adequate to drive electric resistance heat to boost FHRs. Thus, all the heat needs to come from the heat pump with its top power below 1500 Watts, which is constraint by the installation footprint. This study uses a hardware based, HPWH design model, i.e. the DOE/ORNL Heat Pump Design Model to design a 120V unit with a brazed plate condenser, fin-and-tube evaporator and an adequately sized compressor. To maximize the FHR, multiple strategies were simulated, including use of a mixing valve, overheating the tank temperature to 140F, a new sensing method for quicker response, and an innovative water circulation path. We also simulated 24-hour unform energy factors (UEF) to show the tradeoff between the capacity and operation efficiency. Additionally, we evaluated the impact of insulation thickness on FHR and UEF, to seek further footprint reduction or stretch the tank volume.

Shen, Bo↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Data Driven Approach to Analyzing The Impact of Power Plant Cycling on Air Preheater Degradation and Remaining Useful Life

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage. The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. Furthermore, the analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

20 FOSSIL-FUELED POWER PLANTS↗

DATA DRIVEN APPROACH TO ANALYZING THE IMPACT OF POWER PLANT CYCLING ON AIR PREHEATER DEGRADATION AND REMAINING USEFUL LIFE

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage.The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. The analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

Sharma, Himanshu↗

Field Study of 120-volt Heat Pump Water Heaters in the Big Easy

To meet long-term goals for reducing carbon emissions and lessen the impacts of climate change, the U.S. plans to decarbonize its building stock, which includes the replacement of fossil fuel-burning end uses with energy efficient electric alternatives. As part of this strategy, the replacement of fossil fuel water heaters with heat pump water heaters (HPWH) has the potential to avoid substantial carbon emissions. An estimated 10-15 million single-family homes with fossil fuel water heaters do not have the electrical panel capacity to install a 240-volt, 30-amp HPWH. For these homes, a technology recently introduced to the market, the 120-volt plug-in HPWH, can provide energy efficient electrification of water heating without an expensive panel and wiring retrofit. This paper presents the results of an ongoing 120-volt HPWH field study conducted in 17 homes in New Orleans, LA. Key installation scenarios are profiled for retrofitting from gas-fired water heaters to 120-volt HPWHs, accounting for space, air volume, air temperature, condensate drainage, and electrical. Each HPWH had its surrounding air temperature, relative humidity, inlet and outlet water temperature, flow, and energy consumption monitored. Using these data, hot water delivery and energy efficiency performance were analyzed based on home characteristics. Hot water run outs were investigated to understand how hot water usage, inlet water temperature, and surrounding air temperature impact the HPWH’s ability to meet load. From these results, best practices for 120-volt HPWH siting, sizing, and installation were developed. In addition, results are explored further to add insight for electrification policies and product development.

heat pump water heater, 120-volt, Residential buil↗

Impact Analysis of Transitioning to Heat Pump Rooftop Units for the U.S. Commercial Building Stock

Twenty percent (25%) of the energy consumed by the U.S. commercial building sector is from on-site combustion of fossil fuels for space heating. Part of decarbonizing U.S. energy systems to meet climate initiatives will require electrification of space heating equipment, often by transitioning to heat pumps. Rooftop units (RTU) are the most prominent commercial building HVAC system type and should therefore be prioritized for electrification solutions. However, there is limited understanding of the impact on emissions when considering regional electricity generation methods, as well as the impact of ambient temperature on capacity and efficiency, defrost operation, realistic sizing methodologies, and supplementary heating on overall heat pump performance. This study explores the effects of transitioning all installed, existing RTUs to high-performance heat pump RTUs for the U.S. commercial building stock. The analysis is performed using ComStock (TM), the U.S. Department of Energy's calibrated model of the U.S. commercial building stock. Results show 10% and 9% reductions in stock aggregate energy consumption and greenhouse gas emissions, respectively. This analysis will help inform the transition to heat pump RTUs for the U.S. commercial building stock.

commercial building↗

Techno-economic analysis and environmental benefits of solar industrial process heating based on parabolic trough collectors

In this work, detailed techno-economic and environmental analyses are conducted for employing a 5 MWt parabolic trough-based solar industrial process heat (SIPH) plant in Salt Lake City, Utah. According to the results, an optimum solar multiple of 1.5 was determined, allowing the plant to generate annual thermal energy of 15389.24 MWth with a capacity factor of 35.1% and levelized cost of heat (LCOH) of $\$ 26.3$/MWth. Considering a 30% investment tax credit and a 30% reduction in the total installed cost could reduce the LCOH to $\$ 19.30$/MWth and $\$ 18.52$/MWth, respectively. Employing parabolic trough collectors could avoid emissions of 3,582,422.47 kg, 147.99 kg, 3,341.66 kg, and 14.32 kg for CO 2 , PM, NOx, and SO 2 , respectively per year compared to a natural gas-based plant. Further, it also caused an annual external cost savings of between $\$ 99,900$ and $\$ 357,004$. Including the external costs in the LCOH analysis shows that the SIPH plant is economically competitive with a natural gas-based plant, further demonstrating its value. A further comparison demonstrated the economic superiority of a parabolic trough-driven IPH plant over a photovoltaic-driven electric boiler plant. In summary, with reducing installed costs and providing incentives, parabolic trough-driven IPH plants will be an economically and environmentally viable option.

14 SOLAR ENERGY↗

Modeled Results of Four Residential Energy Efficiency Measure Packages for Deriving Advanced Building Construction Research Targets

The Advanced Building Construction (ABC) Initiative from the U.S. Department of Energy Building Technologies Office is working to accelerate industrialized construction innovations for decarbonizing buildings. To inform performance and cost targets for research under the ABC Initiative, this analysis used the ResStock™ tool to evaluate the energy savings, utility bill impacts, and carbon emissions impacts of four simulated upgrade packages with specific target performance levels on a large sample of residential dwelling units (approximately 550,000) representative of the U.S. housing stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Could on-site fuel storage economically reduce power plant-gas grid dependence in pipeline constrained areas like New England?

In the Northeastern United States, natural gas supply constraints have led to periods when gas shortages have caused up to a quarter of all unscheduled power plant outages. Dual fuel oil/gas generators or local gas storage might mitigate gas supply shortages. We use historical power plant operational and availability data to develop a supply curve of the costs required for generators to mitigate fuel shortage failures in New England. Based on 2012–2018 data, we find that the historical fuel shortages at approximately 2 GW worth of gas-fired capacity could be mitigated using on-site fuel storage. For comparison, New England’s average reserve margin was 1.7–2.8 GW over our sample period. Oil dual fuel plants would recoup their investment if compensated with a reliability adder of $\$ 3-7$/MWh during their normal operations, while $\$ 7-16$/MWh would incentivize using onsite, compressed natural gas storage. We estimate that the capital expenses associated with the fuel storage options would be less expensive than installing battery backup for resource adequacy at current battery prices.

03 NATURAL GAS↗

Development of advanced vacuum technologies for extending plasma pulse duration on EAST

Advanced vacuum technologies, including pumping, fueling and wall conditioning, have been successfully developed or upgraded to efficiently control the fuel and impurity particles to extend the plasma pulse duration in the experimental advanced superconducting tokamak (EAST). To improve the particle exhaust rate cryopumps with a 60% increase in pumping speed and ∼2 times increase in saturation capacity have been developed, and molecular pumps with a ∼30% increase in pumping speed have been upgraded. In order to monitor the molecular pump status while avoiding bearing faults and overload accidents, a fault detection system has been built which can offer an early warning to avoid more losses within the fusion device. A series of fueling technologies have been developed including gas injection system, supersonic molecular beam injector, pellet injector (PI), massive gas injector and shattered pellet injector, installed at the midplane and divertor positions at different ports to improve fueling uniformity and efficiency. Meanwhile, routine wall conditioning such as electric and hot N 2 baking, ion cyclotron wall conditioning and glow discharge cleaning have been successfully developed to remove the impurity particles from the inner component and materials. The low Z material wall coating and real-time powder injection during plasma discharge are also designed and applied to further improve particle control capability. Finally, by using these advanced vacuum related technologies, good vacuum (<2 × 10 −6 Pa) and wall conditions are realized, and the fuel and impurity particles can be effectively and stably controlled, which promotes the achievement of the record plasma of ∼1056 s pulse duration with the line-averaged electron density of 1.8 × 10 19 m −3 on EAST. They provide a very important reference for vacuum system design and operation for future fusion devices.

EAST↗

Insights from FEED studies for retrofitting existing fossil power plants with carbon capture technology

Recent United States Department of Energy (DOE) sponsored front-end engineering design (FEED) studies for retrofitting existing fossil-fueled power plants with state-of-the-art carbon capture technology contain previously overlooked real-world design considerations for near-term deployment of carbon capture. Insights from examining seven recently published FEED study reports are summarized in this paper. This includes a discussion of the design, performance, and cost implications associated with (1) location-specific considerations such as water availability, land availability, and accessibility; (2) host-plant-specific factors such as flue gas specifications, allowable degree of integration between the capture system and host plant, and operational mode; and (3) miscellaneous factors such as market conditions, permitting requirements, and business case incentives. In conclusion, this manuscript highlights (1) water availability as a key design and cost driver, with host plant steam extraction increasing capture system cooling water availability, (2) modularization and constructability impacts on the number of capture trains, (3) the impacts of host plant operational mode and capacity factor on the business case for installing capture, and (4) the merit of continued research, development, and demonstration efforts addressing steam extraction, host plant tie-in at the stack, solvent reclamation and air emissions control.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration of the carbon capture with building make-up air unit

Building-integrated carbon capture technology has the potential to reduce the cost of CO 2 capture while improving indoor air quality (IAQ). To promote the adoption of CO 2 capture in a building environment, this study investigated the possibility of integrating carbon capture technology with an existing rooftop make-up air unit (MAU) system to trap CO 2 . Here, in this study, a modular compact CO 2 capture system containing amine-functionalized polymer fibers was examined. The system, which was installed at the exhaust of the MAU, captures CO 2 before it leaves the building to enter the atmosphere as a greenhouse gas. The demonstrated average amount of CO 2 captured was 1.1–1.4 mmol/g of adsorbent material. Techno-economic analysis (TEA) was further performed on the CO 2 capture system, considering material costs, energy costs, as well as transportation and regeneration costs. These results were then used to estimate the levelized cost per ton CO 2 captured (LCOC). To achieve LCOC below $\$$100/t-CO 2 , adsorbents should have working capacities of 4.9 t and 3 t-CO 2 /year for 5 years and 10 years of operation, respectively. In summary, this study highlights a viable path toward the decarbonization of the commercial buildings sector and provides quantitative performance and economic insight on the suitability of building-integrated carbon capture technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Agent-Based Modeling for the Circular Economy: Lessons Learned From Three Case Studies

The circular economy (CE) aims at decoupling human activities from resource use, creating wealth in the process. Recently, many scholars have questioned the link between increased circularity and sustainability, resulting in many methodological approaches being developed for that purpose. This presentation summarizes the insights gained from the application of agent-based modeling (ABM) to study the techno-economic and social conditions promoting circularity and sustainability of three technologies: photovoltaic (PV) modules, hard disk drives (HDDs), and wind blades. Four main categories of agents are defined in the ABM: asset owners, service providers (e.g., refurbishers), recyclers, and manufacturers. Two main CE strategies are represented: lifetime extension (through repair or reuse) and recycling. The developed models start by projecting installed capacities and end-of-life (EOL) quantities. Then the theory of planned behavior - a social psychology model explaining behavior adoption based on attitude, peer influence, and costs - is used to model the asset owners' EOL decision (i.e., landfill, recycle or extend the lifetime of the asset). Then, the quantities of assets flowing to the recycler and service provider agents and quantities of materials flowing to manufacturers are computed. Recyclers' economies of scale are dynamically modeled, and the value generated by the CE strategies for the recyclers, service providers, and manufacturers is computed within the model. When data are available, avoided greenhouse gas emissions resulting from the CE strategies adoption are calculated exogenously from the ABM simulations. Results show that with improved used PV modules warranties, the reuse CE strategy adoption increases from 1% to 23% between 2020 and 2050. Similarly, improved standards could enhance HDDs end-users trust in data-wiping - a prerequisite to reuse - leading to a 3-fold increase in the reuse rate and avoid about 5 million tons of CO2 eq by 2050. Regarding wind blades, 5-15 years lifetime extension could reduce EOL blade quantities by 13%. High costs and logistic issues prevent blades from being recycled in greater quantities. One insight from the case studies is the necessity to have mature secondary markets for reuse to be a viable option. Interestingly, PV reuse is limited by the willingness of PV owners to purchase used modules (on the demand side), while HDDs reuse is constrained by the lack of trust toward data-wiping (limiting the supply of used HDDs). The six limits of the CE concepts presented by Korhonen et al. (2018) are finally used to interpret the results. The HDD case study is an exemplary lock-in, where the first accepted practice (shredding) retains most of the market. The PV results illustrate the technical limitation to reuse, as the growing demand cannot be supplied entirely with used PV modules. The wind case study shows the relevance of clearly defining physical flows - what type of waste should wind blades be considered, how should they be transported and landfilled? - a crucial consideration that also applies to PV modules. Finally, the three case studies highlight the relevance of studying a technology's technical, economic, and market material efficiency potentials altogether and the potential benefit of coupling ABM to life cycle assessment.

agent-based modeling↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗