Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Installation of Lysimeters Near Engineered Trench 3, Slit Trench 8, and Slit Trench 9

Nine new lysimeter stations were installed at the E-Area Low Level Waste Facility (ELLWF). Six lysimeter stations were installed near Engineered Trench 3 (ET3), one installed near Slit Trench 8 (ST8), and two installed near Slit Trench 9 (ST9) as shown in Figure ES-1. Two lysimeters were installed at each station at the depths shown in Table ES-1. Lysimeter placements were based on borehole lithology and were comparable to existing nearby lysimeter stations. The deepest lysimeter at each of the new lysimeter stations was designated as the action-level lysimeter. Following installation, the lysimeters were purged and placed under vacuum for sampling. Sampling occurred in April 2023. Analytical results from the sampling will be provided in the Spring 2023 Lysimeter Tritium Data technical memo and the 2023 Annual Summary Report. With the addition of the new lysimeters at ET3, ST8, and ST9, the vadose zone monitoring system is now comprised of 327 active lysimeters at 111 lysimeter stations. There are 102 action-level lysimeters at 111 stations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Updated Life Cycle Assessment of Utility-Scale Solar Photovoltaic Systems Installed in the United States

Given the high deployment targets for solar photovoltaics (PV) needed to meet U.S. decarbonization goals, and the limited carbon budget remaining to limit global temperature rise, accurate accounting of the energy-use and greenhouse-gas emissions over the life-cycle of PV systems is needed. In the United States, most PV systems are large utility-scale systems which use single-axis trackers and central inverters, which are not commonly examined in existing life-cycle assessment (LCA) literature. In this study, we present a cradle-to-grave LCA of a typical silicon U.S. utility PV (UPV) installation which is consistent with the utility system features documented in the annual NREL PV system cost benchmark reports. We analyze and present results for four main metrics: cumulative energy demand (CED), greenhouse gas (GHG) emissions, energy payback time (EPBT), and carbon payback time (CPBT). We consider six primary manufacturing options: three based on an imported PV module supply chain (comparing low-carbon imports, high-carbon imports, and average imports), and three based on a potential domestic PV module supply chain (comparing low-carbon U.S. regions, high-carbon U.S. regions, and average U.S. regions). These manufacturing options were then paired with installation locations to create six main cases: low-carbon options were installed in Phoenix (Arizona), high-carbon options were installed in Seattle (Washington), and average options were installed in Fredonia (Kansas). These locations were selected to represent a range of irradiance and grid mixes in the United States, in order to illustrate the likely range of EPBTs and CPBTs possible across the United States. For all six cases, a sensitivity analysis for end-of-life (EOL) handling was explored to capture current and future management options: landfilling, partial recycling, and high-quality recycling. For the purposes of this report, the benchmark system was defined to use an average imported supply chain with partial recycling, installed in Fredonia (Kansas). CED results show ratios at or below 0.1 MJ oil-eq /MJgenerated which demonstrates efficient use of primary energy resources (below a 1:1 ratio), and represents a slight improvement over previous results in literature. GHG emissions per kWh range from 10-36 g CO 2 e, which are consistent with or lower than previous results published by NREL and IEA-PVPS. We use a graphical approach for calculating EPBT and CPBT in this report, which improves upon methods typically used in literature by accounting for non-linearity and avoiding data quality issues associated with long-term projections. EPBT was determined to vary from 0.5 to 1.2 years, with a benchmark EPBT of 0.6 years; CPBT was shown to vary from 0.8 to 20 years, with benchmark CPBT of 2.1 years, which is lower than other estimates from recent literature (typically >2 years).

14 SOLAR ENERGY↗

Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY↗

Practical aspects of instrumentation system installation, volume 13

A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.

Borek, R. W.↗

Meeting the challenges of installing a mobile robotic system

The challenges of integrating a mobile robotic system into an application environment are many. Most problems inherent to installing the mobile robotic system fall into one of three categories: (1) the physical environment - location(s) where, and conditions under which, the mobile robotic system will work; (2) the technological environment - external equipment with which the mobile robotic system will interact; and (3) the human environment - personnel who will operate and interact with the mobile robotic system. The successful integration of a mobile robotic system into these three types of application environment requires more than a good pair of pliers. The tools for this job include: careful planning, accurate measurement data (as-built drawings), complete technical data of systems to be interfaced, sufficient time and attention of key personnel for training on how to operate and program the robot, on-site access during installation, and a thorough understanding and appreciation - by all concerned - of the mobile robotic system's role in the security mission at the site, as well as the machine's capabilities and limitations. Patience, luck, and a sense of humor are also useful tools to keep handy during a mobile robotic system installation. This paper will discuss some specific examples of problems in each of three categories, and explore approaches to solving these problems. The discussion will draw from the author's experience with on-site installations of mobile robotic systems in various applications. Most of the information discussed in this paper has come directly from knowledge learned during installations of Cybermotion's SR2 security robots. A large part of the discussion will apply to any vehicle with a drive system, collision avoidance, and navigation sensors, which is, of course, what makes a vehicle autonomous. And it is with these sensors and a drive system that the installer must become familiar in order to foresee potential trouble areas in the physical, technical, and human environment.

Decorte, Celeste↗

Application-Program-Installer Builder

A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

Wolgast, Paul↗

Evaluation of Cable Harness Post-Installation Testing

The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

King, M. S.↗

Open Rotor Aeroacoustic Installation Effects for Conventional and Unconventional Airframes

As extensive experimental campaign was performed to study the aeroacoustic installation effects of an open rotor with respect to both a conventional tube and wing type airframe and an unconventional hybrid wing body airframe. The open rotor rig had two counter rotating rows of blades each with eight blades of a design originally flight tested in the 1980s. The aeroacoustic installation effects measured in an aeroacoustic wind tunnel included those from flow effects due to inflow distortion or wake interaction and acoustic propagation effects such as shielding and reflection. The objective of the test campaign was to quantify the installation effects for a wide range of parameters and configurations derived from the two airframe types. For the conventional airframe, the open rotor was positioned in increments in front of and then over the main wing and then in positions representative of tail mounted aircraft with a conventional tail, a T-tail and a U-tail. The interaction of the wake of the open rotor as well as acoustic scattering results in an increase of about 10 dB when the rotor is positioned in front of the main wing. When positioned over the main wing a substantial amount of noise reduction is obtained and this is also observed for tail-mounted installations with a large U-tail. For the hybrid wing body airframe, the open rotor was positioned over the airframe along the centerline as well as off-center representing a twin engine location. A primary result was the documentation of the noise reduction from shielding as a function of the location of the open rotor upstream of the trailing edge of the hybrid wing body. The effects from vertical surfaces and elevon deflection were also measured. Acoustic lining was specially designed and inserted flush with the elevon and airframe surface, the result was an additional reduction in open rotor noise propagating to the far field microphones. Even with the older blade design used, the experiment provided quantification of the aeroacoustic installation effects for a wide range of open rotor and airframe configurations and can be used with data processing methods to evaluate the aeroacoustic installation effects for open rotors with modern blade designs.

Czech, Michael J.↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Importance of Window Installation in Residential Building Envelopes Having Continuous External Insulation in Order to Realize Energy Efficiency

Residential buildings are one of the prime candidates in the United States for reducing energy consumption. Continuous exterior insulation (CEI) is being used increasingly often in residential buildings to improve energy efficiency. Windows constitute 15–40% of a building envelope and are the weakest component in energy performance. The installation of windows in walls with CEI has not been well evaluated. We identified four cases of installing windows in walls with CEI of 25–76 mm (1–3 in.) thickness and analyzed the energy loss between the window and wall interface (flanking loss), structural issues, air leakage, and moisture penetration. Thermal analysis showed that the insulation value (RSI) of the 305 mm (12 in.) perimeter wall surrounding a window decreased by 7.6–34.5% in the four cases when compared with the RSI of the wall without the window. A window installation method is proposed to address the issues likely to occur with installation methods currently being used in the field. An out-of-the-box installation system was also designed to achieve a better thermal performance, cost effectiveness, and structural performance in high-performance residential buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vapor Phase Installation of CpCo(CO) 2 in MOF‐808

Metal-organic frameworks (MOFs), including MOF-808 present an opportunity for vapor phase installation of reactive centers that may serve as uniform sites for precision catalysis. The mechanism of cobalt installation in MOF-808 through atomic layer deposition (ALD) upon CpCo(CO )2 exposure is investigated through in situ FTIR spectroscopy complemented by density functional theory modeling. The role of subsequent H 2 O exposure in the hydrolysis of carbonyl and cyclopentadienyl ligands to complete the installation is also investigated. In situ FTIR study reveals that upon exposure of CpCo(CO) 2 to MOF-808 at 115 °C, a long-lived, stable intermediate is formed that presents carbonyl stretching vibrations similar to the undissociated precursor that are attributed to multiple chemisorbed carbonyl complexes. In MOF-808, cobalt species are initially absorbed near the BTC linker rather than directly on the nodes, revealing the importance of non-covalent interactions in the installation process. DFT suggests that H 2 O exposure promotes carbonyl elimination but leaves a cyclopentadienyl-capped cobalt that is more stable than the complete hydrolysis product. The simulations are consistent with cobalt installation in MOF-808 using CpCo(CO) 2 and H 2 O at 115 °C and further consistent with the lack of ALD thin film deposition of cobalt oxide thin films on planar supports.

36 MATERIALS SCIENCE↗

Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm

To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.

43 PARTICLE ACCELERATORS↗

NASTRAN Installation: Implementation Steps and Possible Problems Encountered

NASTRAN, from its inception, was designed to operate on several diverse computer system. It is currently installed and operating on the CDC 6600, the IBM 360, and the UNIVAC 1108. This paper discusses the steps found by CSC to be necessary in installing NASTRAN on a computer system and the possible obstacles that might be encountered in undertaking NASTRAN installation. Reference is made to actual problems that arose during installation on the above machines. With a knowledge of what has happened to date in setting up NASTRAN, the future user will be better able to cope with and understand the implications of installing NASTRAN on his computer.

Dielmann, H. E.↗

Automated installation of large platform utilities

The capabilities of the assembler in installing nonstructural platform systems were assessed. These systems include electrical power distribution, heat transport, command and data signal transmission, and payload data transmission. The effects of including installation of utilities on the assembly process and on the design, operation, and performance of the assembler were evaluated. In addition, any special requirements on the assembler and/or the platform due to the installation of utilities were identified. The procedure followed was to define a set of candidate utility characteristics and installation requirements, define and design installation concepts, and perform an assessment of impacts on the assembler and its operation.

Vernon, R. M.↗

An experimental investigation of an advanced turboprop installation on a swept wing at subsonic and transonic speeds

An investigation was conducted in the Langley 16-Foot Transonic Tunnel to determine the effects of a turboprop-nacelle installation on the pressure distributions over a swept, supercritical wing. The tests were conducted at Mach numbers from 0.20 to 0.80, at angles of attack from 0 to 5 degrees, nacelle nozzle pressure ratios from 1.0 to 1.6, and at propeller tip speeds from 700 to 800 ft/sec. The results of this study indicate that the turboprop nacelle interference, with and without power, on a swept wing is greater on the inboard wing panel than on the outboard wing panel. The over-the-wing nacelle installation with the propeller upwash on the inboard panel had flow separation problems at a Mach number of 0.80. No severe flow separation problems appear to exist for either propeller rotation direction for the under-the-wing nacelle installation. The local flow disturbances caused by the under-the-wing nacelle installation were in general less severe than for the over-the-wing nacelle installation.

Carlson, John R.↗

Vortex generator installation studies on steady state and dynamic inlet distortion

The theoretical and experimental work carried out under the NASA/MOD Joint Aeronautical Program has shown that CFD vortex generator installations designs successfully managed inlet duct flow distortion and that significant benefits in flow unsteadiness at the engine face were also present. The main conclusions to date from the collaborative effort between NASA/Lewis and DRA/Bedford are as follows: (1) vortex generator installations can be designed to be effective over a wide range of inlet operating conditions using Computational Fluid Dynamics and formal optimization procedures, (2) reductions in steady state engine face distortion of up to 80% have been measured in the M2129 inlet S-duct using CFD designed vortex generator installations, (3) reductions in flow unsteadiness of up to 80% have been measured in the W129 inlet S-duct using CFD designed vortex generator installations, and (4) the Reduced Navier-Stokes code RNS3D is a useful tool to design vortex generator installations to manage engine face distortions over a wide range of inlet operating conditions.

Anderson, Bernhard H.↗

Purchase and Installation of NanoSIMS 50

Although this is a final report on NASA grant number NAG5-8729 we wish to state at the outset that it was mistakenly written as a two-year grant instead of a three-year grant as should have been done. The grant was made for the purpose of purchasing and installing a novel ion microprobe initially called the NanoSIMS 50 and now called the NanoSIMS. The total cost to NASA for purchasing the instrument and refurbishing a laboratory to house it was $1.1 M, split into three installments of $400 (FY 1999), $350K (FY2000), and $350K (FY-2001). We received the first installment in full and $335K in FY2000 for the second installment. The final $350K necessary to complete the purchase and installation was expected by us in the spring of 2001. However, we were recently informed that no more money can be transferred on this grant since it was originally written as a two-year grant. Therefore, we are closing out the current grant and simultaneously writing a new proposal to obtain the final $350K needed to complete the purchase.

Walker, Robert M.↗