Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructure planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Charging-management And Infrastructure-planning (cmip) Model

CMIP model explores various charging infrastructure network designs to serve a free-floating car-sharing fleet and determine the charging downtime experienced by the fleet for each design. Development of the CMIP model had two major steps: (1) describing modeling assumptions and (2) developing an integer program (IP) that jointly optimizes decisions about locations to install DC fast chargers and EV-to-charger assignments. The CMIP model integrates an EV charging model, EV energy consumption model, and heterogeneous, real-world vehicle use data with an integer programming optimization model to identify optimal location of new charging stations and calculate vehicle downtime for charging. The CMIP model can be applied to understand: (a) the reduction of EV fleet downtime if an additional fast-charging station is added to the current infrastructure and (b) to what extent total vehicle downtime would be sensitive to additional charging infrastructure.

Roni, MohammadS↗

2019 Integrated facilities and infrastructure plan

This document, the Sandia National Laboratories lntegrated Facilities and lnfrastructure Plan, summarizes long-, mid-, and short-term site planning to support Sandia's mission. High-level direction that influences site development includes the Stockpile Stewardship and Management Plan (SSMP) and Nuclear Posture Review (NPR), while the relationship to National Nuclear Security Administration (NNSA) infrastructure is described in the NNSA Master Asset Plan (MAP). Using the SSMP as an indication of the future workload informs the planning process for facilities and infrastructure. Figure 1 shows the outlook of the NNSAs nuclear weapons modernization programs through the year 2042, which indicates a stable, slightly growing workload.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Airport Infrastructure Planning Using Multi-Stage Stochastic Programming

The Athena project, funded by the Department of Energy, has worked to identify the critical infrastructure at Dallas Fort Worth (DFW) Airport which influences mobility between the airport and the surrounding city of Dallas. Using scalable methods that can leverage HPC resources we have developed a multi-stage stochastic infrastructure expansion model for determining parking and curb modifications to the DFW Airport over a 20-year horizon. Additionally, we have explored the impacts of congestion pricing in conjunction with infrastructure modifications. Our multi-stage stochastic model is implemented using the mpi-sppy software and solved in parallel using progressive hedging on the National Renewable Energy Laboratory's HPC system Eagle. In this talk we present results from solving this model at scale.

airport planning↗

Optimizing Long Term Hydrogen Fueling Infrastructure Plans on Freight Corridors for Heavy Duty Fuel Cell Electric Vehicles

The development of a future hydrogen energy economy will require the development of several hydrogen market and industry segments including a hydrogen based commercial freight transportation ecosystem. For a sustainable freight transportation ecosystem, the supporting fueling infrastructure and the associated vehicle powertrains making use of hydrogen fuel will need to be co-established. This paper develops a long-term plan for refueling infrastructure deployment using the OR-AGENT (Optimal Regional Architecture Generation for Electrified National Transportation) tool developed at the Oak Ridge National Laboratory, which has been used to optimize the hydrogen refueling infrastructure requirements on the I-75 corridor for heavy duty (HD) fuel cell electric commercial vehicles (FCEV). This constraint-based optimization model considers existing fueling locations, regional specific vehicle fuel economy and weight, vehicle origin and destination (OD), vehicle volume by class and infrastructure costs to characterize in-mission refueling requirements for a given freight corridor. The authors applied this framework to determine the ideal long term public access locations for hydrogen refueling (constrained by existing fueling stations and dispensing technology), the minimal viable cost to deploy sufficient hydrogen fuel dispensers, and associated equipment, to accommodate a growing population of hydrogen fuel cell trucks. So the framework discussed in this paper can be expanded and applied to additional electrified powertrains as well as a larger interstate system, expanded regional corridor, or other transportation networks.

08 HYDROGEN↗

Electric vehicle fast charging infrastructure planning in urban networks considering daily travel and charging behavior

Electric vehicles are a sustainable substitution to conventional vehicles. This work introduces an integrated framework for urban fast charging infrastructure to address the range anxiety issue. A mesoscopic simulation tool is developed to generate trip trajectories, and simulate charging behavior based on various trip attributes. The resulting charging demand is the key input to a mixed-integer nonlinear program that seeks charging station configuration. The model minimizes the total system cost including charging station and charger installation costs, and charging, queuing, and detouring delays. The problem is solved using a decomposition technique incorporating a commercial solver for small networks, and a heuristic algorithm for large-scale networks, in addition to the Golden Section method. The solution quality and significant superiority in the computational efficiency of the decomposition approach are confirmed in comparison with the implicit enumeration approach. Furthermore, the required infrastructure to support urban trips is explored for future market shares and technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal charging management and infrastructure planning for free-floating shared electric vehicles

Recently, major car-sharing service providers have begun to include electric vehicles (EVs) in free-floating car-sharing fleets. For these EVs, downtime due to charging, including time spent traveling to and waiting in queues at charging stations in a sparse charging infrastructure network, is a major barrier to sustainable operation. An intuitive solution to overcome this barrier is to increase the number of fast-charging stations in the fleet service area. This paper studies the relationship between fleet vehicle downtime and the number of charging stations by modeling the fleet operations of a major car-sharing service provider. An integer programming model is developed that jointly optimizes charging station allocation, in terms of the number and location of charging stations, and the assignment of EVs to charging stations. Case study results showed that fleet vehicle charging time comprises 72-75% of the total downtime spent on charging trips. This indicates that charging time, as opposed to travel time or waiting time, is the dominant component of total fleet downtime for charging. The study also shows that by adding 5 to 20 new charging stations reduces total fleet downtime and travel time during charging trips by 2-4% and 26-49%, respectively. Although adding new charging stations to the fleet service area reduces total charging trip travel time significantly, it does not reduce total downtime significantly. Results also show that if the EV battery state of the charge (SOC) threshold—below which a charging trip is initiated—is less than 18%, not all EVs in the car-sharing fleet can be charged using the existing direct current fast chargers (DCFCs) in the fleet’s service area. Furthermore, this implies that adequate charging infrastructure coverage is required to ensure that EVs of a given range can operate in the car-sharing fleet.

25 ENERGY STORAGE↗

Geologic Maps for Civil Engineering and Infrastructure Planning

The Artemis Program mandate for sustainable, long-term presence on the Moon requires learning to "Live Off the Land". Geologic maps enable a paradigm shift to model the development and scaling of infrastructure for robotic and human exploration inside a bounded system on the lunar surface. Relying on geologic maps produced from orbital data and robotic precursor missions, in-situ resource utilization (ISRU) will be required to produce infrastructure, building materials and consumables. The ISRU value chain must be mapped to identify linkages of resources, producers, processes and equipment capabilities for transforming excavated regolith into usable feedstocks. Coordination will be required to balance supply and demand across the whole system of lunar infrastructure and operations, at each stage of development.

Geologic Mapping↗

Optimizing Hydrogen Fueling Infrastructure Plans on Freight Corridors for Heavy-Duty Fuel Cell Electric Vehicles

The development of a future hydrogen energy economy will require the development of several hydrogen market and industry segments including a hydrogen-based commercial freight transportation ecosystem. For a sustainable freight transportation ecosystem, the supporting fueling infrastructure and the associated vehicle powertrains making use of hydrogen fuel will need to be co-established. This article introduces the OR-AGENT (Optimal Regional Architecture Generation for Electrified National Transportation) tool developed at the Oak Ridge National Laboratory, which has been used to optimize the hydrogen refueling infrastructure requirements on the I-75 corridor for heavy-duty (HD) fuel cell electric commercial vehicles (FCEV). This constraint-based optimization model considers existing fueling locations, regional-specific vehicle fuel economy and weight, vehicle origin and destination (O-D), and vehicle volume by class and infrastructure costs to characterize in-mission refueling requirements for a given freight corridor. The authors applied this framework to determine the ideal public access locations for hydrogen refueling (constrained by existing fueling stations), the minimal viable cost to deploy sufficient hydrogen fuel dispensers, and associated equipment, to accommodate a growing population of hydrogen fuel cell trucks. The framework discussed in this article can be expanded and applied to a larger interstate system, expanded regional corridor, or other transportation network. This article is the third in a series of papers that defined the model development to optimize a national hydrogen refueling infrastructure ecosystem for HD commercial vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Refueling infrastructure planning in intercity networks considering route choice and travel time delay for mixed fleet of electric and conventional vehicles

The range anxiety has been a major factor that affects the market acceptance of electric vehicles. Even with the recent development of battery technologies, a lack of charging stations and range anxiety are still significant concerns, specifically for intercity trips. This calls for more investments in building charging stations and advancing battery technologies to increase the market share of electric vehicles and improve sustainability. This study suggests a configuration for plug-in electric vehicle charging infrastructure to support long-distance intercity trips of electric vehicles at the network level. A model is proposed to minimize the total system cost including infrastructure investment (building charging stations/spots) and travel time delays (charging time, waiting time in the queue, and detour time to access charging stations). This study fills existing gaps in the literature by capturing realistic patterns of travel demand and considering flow-dependent charging delays at charging stations. Furthermore, the proposed model, which is formulated as a mixed-integer program with nonlinear constraints, solves the optimization problem at the network level. At the network level, impacts of charging station locations on the traffic assignment problem with a mixed fleet of electric and conventional vehicles need to be considered. To this end, a traffic assignment module is integrated with a simulated annealing algorithm. The numerical experiments show a satisfactory application of the model for a full-scale case study (intercity network in Michigan). The solution quality and efficiency of the proposed solution algorithm are evaluated against those of an enumeration approach for a small case study. The results suggest that even for the current market share and charging stations’ setting, a significant investment is needed to support intercity trips without range anxiety issues and with acceptable delays. Additionally, through sensitivity analyses, the required infrastructure and battery investments to support intercity trips with acceptable delays are established for hypothetical increased market shares and battery size in the future.

42 ENGINEERING↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Analyzing the Implications of Climate Data on Plant Hardiness Zones for Green Infrastructure Planning: Case Study of Knoxville, Tennessee and Surrounding Region

Downscaled climate data for Knoxville, Tennessee and the surrounding region were used to investigate future changing Plant Hardiness Zones due to climate change. The methodology used is the same as the US Department of Agriculture (USDA), well-known for their creation of the standard Plant Hardiness Zone map used by gardeners and planners. USDA data were calculated from observed daily data for 1976–2005. The modeled climate data for the past is daily data from 1980-2005 and the future data is projected for 2025–2050. The average of all the modeled annual extreme minimums for each time period of interest was calculated. Each 1 km raster cell was placed into zone categories based on temperature, using the same criteria and categories of the USDA. The individual models vary between suggesting little change to the Plant Hardiness Zones to suggesting Knoxville moves into the next two Hardiness Zones. But overall, the models suggest moving into the next warmer Zone. USDA currently has the Knoxville area categorized as Zone 7a. None of the Zones calculated from the climate data models placed Knoxville in Zone 7a for the similar time period. The models placed Knoxville in a cooler Hardiness Zone and projected the area to increase to Zone 7. The modeled temperature data appears to be slightly cooler than the actual temperature data and this may explain the zone discrepancy. However, overall Knoxville is projected to increase to the next warmer Zone. As the modeled data has Knoxville, overall, moving from Zone 6 to Zone 7, it can be inferred that Knoxville, Tennessee may increase from their current Zone 7 to Zone 8.

54 ENVIRONMENTAL SCIENCES↗

Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste management units at Area G. These MDA G disposal units include 32 pits, 193 shafts, and 4 trenches and contain LLW, MLLW and TRU waste. The remaining 105 solid waste management units (SWMUs) include RCRA-regulated landfill and storage units and DOE-regulated LLW disposal units. The TA-54 closure project must ensure that continuing waste operations at Area G and their transition to an interim or enduring facility are coordinated with closure activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power & Water Facility and Infrastructure Planning: CRADA Final Report

Los Alamos National Laboratory (LANL) has developed software and expertise for planning power grids and for examining the human resource issues for a nuclear power program. These programs, and other LANL software innovations, can offer an efficient manner in which to assist the power and water generation industries in both developed and undeveloped countries.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Next Generation Infrastructure Plan FY18-FY22

Define a 2-5 year plan that documents facilities, operations, networking, storage and user support efforts to concentrate and coordinate resources within the ASC FOUS Program.

97 MATHEMATICS AND COMPUTING↗