Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower plants”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Hydropower Flexibility Framework (Final Technical Report)

The Hydropower Flexibility Framework (HFF) tool focuses on providing the hydropower community with an effective means of assessing optimized hydropower plant outcomes. This tool combines both site specific characteristics, which act to constrain plant operation, and the hydrologic and grid characteristics which drive hydropower plant operation. The hydropower community faces a confluence of factors which drive the importance of developing such a capability, including an aging hydropower fleet subject to a range of modernization opportunities, a large number of hydropower plant relicensing activities which may affect operational requirements, an electrical grid with increasing levels of variable resources which must be balanced to maintain grid stability, and climate change influencing riverine hydrologic patterns outside of design characteristics. With support from the hydropower community, the project team developed the HFF tool and demonstrated the tool through a series of Use Cases. This guidance was developed as a part of the larger HFF tool User’s Manual (see Appendix B), a resource designed to inform other users and to empower community uptake of the tool. The HFF tool, hosted at https://hfftool.com/, was developed with the support of the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). EPRI is currently exploring alternatives to support the continued maintenance and functionally of the online tool.

13 HYDRO ENERGY↗

Hydropower Evaluation Framework for Wildfire Resilient Microgrids

This paper presents a framework for characterizing hydropower plants based on plant and site attributes, assessing their feasibility to function within microgrids during periods of wildfire-induced outages. A set of nine metrics is developed to assign scores to hydropower plants, considering their suitability for forming wildfire-resilient microgrids, their capability to operate within such microgrids, and their simulated performance during wildfire events. A comprehensive database is constructed, comparing hydropower plants according to their suitability and capability metrics. To evaluate the performance score of a specific hydropower plant, namely the Hills Creek plant situated in a wildfire-prone region of Oregon, a case study is conducted, simulating a wildfire scenario. The results of steady-state and dynamic simulations demonstrate that the Hills Creek hydropower plant can effectively provide crucial microgrid services and power nearby communities during a prolonged wildfire-related outages.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Existing Hydropower Assets (EHA) Capacity Plant Database, 2005-2024

Existing Hydropower Asset (EHA) Annual Capacity is a geospatial point-level dataset containing annual capacity over the years (2005-2024) and key characteristics of operational U.S. hydropower plants with 1 megawatt or greater of nameplate capacity. EIA form 860 and EHA are the primary sources of the derived data.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Hydropower Resilience Database for Assessing Microgrid Formation Capability and Enhancing Power Grid Resilience

In the face of increasing frequency of extreme events, enhancing resilience and reliability of energy infrastructure demands innovative solutions. Hydropower, with its inherent generation flexibility and grid-forming capability, offers significant potential for enhancing power grid resilience through the establishment of microgrids. To enable informed decision-making and strategic planning, we present the Hydropower Resilience Database (HRD) that integrates data from various sources such as Oakridge National Laboratory (ORNL) HydroSource, National Inventory of Dams, and US Western Grid database. By integrating relevant information on hydropower plant characteristics, including dams, reservoirs, and connected electrical grid, this resource enables hydropower plant owners, utilities, and community stakeholders to identify and evaluate the feasibility of using hydropower resources in microgrids to support nearby communities and critical infrastructure in various challenging scenarios. Using HRD, a set of metrics are evaluated to quantify the capability of hydropower plants to support essential microgrid functions. An interactive tool is developed using ArcGIS, enabling the visualization and analysis using HRD. Our research contributes to strategic planning efforts for fortifying energy infrastructure, ensuring reliable power supply during disruptions, and advancing the development of robust and resilient energy systems in regions susceptible to grid vulnerabilities.

13 HYDRO ENERGY↗

Hydropower Resilience Database for Assessing Microgrid Formation Capability and Enhancing Power Grid Resilience

In the face of increasing frequency of extreme events, enhancing resilience and reliability of energy infrastructure demands innovative solutions. Hydropower, with its inherent generation flexibility and grid-forming capability, offers significant potential for enhancing power grid resilience through the establishment of microgrids. To enable informed decision-making and strategic planning, we present the Hydropower Resilience Database (HRD) that integrates data from various sources such as Oakridge National Laboratory (ORNL) HydroSource, National Inventory of Dams, and US Western Grid database. By integrating relevant information on hydropower plant characteristics, including dams, reservoirs, and connected electrical grid, this resource enables hydropower plant owners, utilities, and community stakeholders to identify and evaluate the feasibility of using hydropower resources in microgrids to support nearby communities and critical infrastructure in various challenging scenarios. Using HRD, a set of metrics are evaluated to quantify the capability of hydropower plants to support essential microgrid functions. An interactive tool is developed using ArcGIS, enabling the visualization and analysis using HRD. Our research contributes to strategic planning efforts for fortifying energy infrastructure, ensuring reliable power supply during disruptions, and advancing the development of robust and resilient energy systems in regions susceptible to grid vulnerabilities.

13 HYDRO ENERGY↗

Digital Twin for Hydropower System Object Modeling: Alder Dam (FY2023)

Hydropower is the world's largest source of renewable electricity, and hydropower plants are distributed all over the world. Typical major components of a hydropower plant are the governor, excitation, generator, thrust bearing, hydraulic turbine, transformer, the main lead, metering and control, tailwater depression, and dissolved oxygen. For each component, various measures are taken. The measurements are acquired by various heterogeneous systems, including standalone sensors, programmable logic controllers (PLC), Supervisory control and data acquisition (SCADA), Internet of Things (IoT), and data acquisition and integration platforms such as OSI/PI. The measured data are often archived within the plant by a data management platform, and many institutions have cloud-based archive systems, such as Hydropower Research Institution (HRI), U.S. Army Corps of Engineers (USACE), and Columbia River Data Access in Real Time (DART). Object Modeling is a general framework for designing information systems. It focuses on objects, the actions they perform, and the messages they send to one another to cause those actions to be taken. The major differences among object modeling, network modeling, data modeling, and process modeling are that in the first we focus on the actions in response to information, objects which form the system, the actions they perform, and how they pass information to one another, while in the second we concentrate on where, when and how much information is moved, while in the third we focus on what information is moved and where it is moved, while in the last we focus on how it is moved and when it is moved. Object modeling was developed basically as a method to develop object-oriented systems and to support object-oriented programming. It describes the static structure of the system. The object Modeling Technique is easy to draw and use. That is why we choose object modeling to connect physical hydropower plants to Digital Twin. It recognizes the objects and the relationship between them. It identifies the attributes and functions of each class. Dynamic Modeling: It explains how objects respond to events. Functional Modeling indicates the processes executed in an object and how data changes when it moves to objects. It has been used in many applications like telecommunication, transportation, etc.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Existing Hydropower Assets (EHA) Annual Net Generation Plant Database, 2003-2024

Existing Hydropower Asset (EHA) Annual Net Generation is a geospatial point-level dataset containing annual net generation over time (2003-2024) and key characteristics of operational U.S. hydropower plants with 1 megawatt or greater of nameplate capacity. EIA 923 and EHA are the primary sources of the derived data. Pumped storage and hybrid plants are excluded.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Leveraging Hydropower Multi-Sensor Data for Inference and Age-Informed Modeling

Increased demand of operational flexibility such as faster ramp up/down in generation, and more frequent start/stops are putting hydropower plants and their associated components in unprecedented stress. Consequently, these plants are at the high risk of extended and more frequent outage to accommodate unscheduled, and unexpected maintenance. Therefore, hydropower plants are in critical need of data driven and age-informed analysis for their regular and unscheduled operation. Yet not all hydropower plants are exhaustively equipped with sensors and/or measurement streams for their respective components – demanding solutions on how to detect, identify, and locate the cause of any event from the unobservable. Idaho National Laboratory (INL) analyzed the anonymized measurements and event records from the Hydropower Research Institute (HRI) to address this issue, as part of the Water Power Technologies Office (WPTO) funded one year multi-lab project. First, we investigated how time series of multiple sensor measurements can be leveraged to identify an event “root cause” as well as to develop an inference (i.e., estimate the unobservable) problem. INL also investigated how individual hydropower components’ reaction or response times vary across the pre-event, during event, and post-event conditions – enabling the hydropower dynamic models to be age-informed. Finally, the impact of clustering multi-sensor time series on short-term vibration prediction is analyzed. INL will present key findings from these analyses and recommend next steps for stakeholder adoption.

13 HYDRO ENERGY↗

Creating a Digital Twin for a Hydropower System through 3D Object Modeling: Alder Dam FY23

Hydropower stands as the world's leading source of renewable electricity, with hydropower plants spanning the globe. A typical hydropower plant comprises essential components including the governor, excitation system, generator, thrust bearing, hydraulic turbine, transformer, main lead, metering and control devices, tailwater depression system, and dissolved oxygen monitoring. Each of these components undergoes various measures and monitoring procedures. These measurements are collected through a diverse array of systems, encompassing standalone sensors, programmable logic controllers (PLCs), Supervisory Control and Data Acquisition (SCADA) systems, Internet of Things (IoT) devices, and data acquisition and integration platforms like OSI/PI.

13 HYDRO ENERGY↗

Hydropower Infrastructure - LAkes, Reservoirs, and RIvers (HILARRI), v4

HILARRI is a database of links between major datasets of operational hydropower dams and powerplants, and inland water bodies. These connections are critical for conducting large-scale analysis of hydropower infrastructure and their associated natural and engineered water systems. Features include: – Dams from the National Inventory of Dams (2025) and the Global Reservoir and Dam Database (GRanD v1.3) – Hydropower plants from the Existing Hydropower Assets dataset (EHA 2025) – Power plants that are listed in the 2025 U.S. Hydropower Development Pipeline Data or were listed in previous versions of the dataset These hydropower infrastructure features are linked to several major datasets that provide hydrologic and hydraulic information relevant for analysis of hydropower systems that includes the integral water resources. That information comes from: – Products from the National Hydrography Dataset (NHD) – NHDPlusV2 Medium Resolution river network flowlines, – NHD waterbodies (limited to lakes and reservoirs), – NHD Watershed Boundary Dataset (HUC12-level for the Conterminous United States (CONUS)) – NHD High Resolution waterbodies – HydroLAKES water bodies (lakes and reservoirs) – LAGOS-US lakes and reservoirs – EPA National Lakes Assessment (2007, 2012, 2017, and 2022) – The Reservoir Sedimentation Database (RESSED) – EPA SuRGE sampling locations Unique identifiers are used to facilitate joining to the original full datasets. For example, characteristics of NHD flowlines such as estimated average flow rate can be joined from the NHDPlusV2 dataset to a dam or power plant listed in HILARRI based on the ID field, “COMID”, that is common to both datasets. HILARRI only includes basic information about identifiers, location, and data quality or usage notes. It does not contain the attributes or time series data associated with these sites. The HILARRI dataset incorporates information from several datasets to facilitate more effective and accurate analysis of hydropower infrastructure and their associated waterbodies. For example, dams were checked against the most recent American Rivers Dam Removal Database to identify and flag facilities that may no longer exist. Additionally, dams that are listed multiple times in the NID are identified and flagged to avoid double-counting when analyzing and summarizing information. Other quality flags include certainty of operational hydropower (i.e., if one or more datasets indicates hydropower at a particular location), whether an associated water body is accurate or composed of multiple polygons, or whether there is a known issue with reported characteristics in one of the underlying datasets. These additional data flags are designed to increase confidence in data usage for individual to large-scale analyses.

Hansen, Carly [ORNL] (ORCID:0000000193280838)↗

Existing Hydropower Assets (EHA) Annual Gross Generation Plant Database, 2003-2024

Existing Hydropower Asset (EHA) Annual Gross Generation is a geospatial point-level dataset containing annual gross generation over time (2003-2024) and key characteristics of operational U.S. pumped storage and hybrid plants with 1 megawatt or greater of nameplate capacity. EIA 923 and EHA are the primary sources of the derived data. Hydropower units are excluded.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Hydroelectric Power and Hydrogen Production Integration

Hydropower-based hydrogen production could introduce opportunities for new revenue streams for hydropower plants, including from energy storage and regeneration as well as from sale of the hydrogen product to external markets. Hydrogen-based energy storage and regeneration could also help support Idaho Power’s decarbonization goals by decreasing dependence on fossil-based peaking power plants. Additionally, integration of hydrogen production with hydropower generation could help address the issue of low dissolved oxygen river water conditions that commonly accompany hydropower plant operations by utilizing the oxygen byproduct from an electrolytic hydrogen production process as a resource for mitigation of low dissolved oxygen water conditions. Comprehensive techno-economic analysis of the hybrid hydroelectric and hydrogen energy storage system has revealed critical insights into the pathways and considerations for optimizing the economic value and environmental benefits of such systems. Among the three identified pathways of natural gas blending, regeneration, and direct sale of hydrogen, the direct sale of hydrogen emerges as the most profitable, particularly given the current pricing dynamics of hydrogen and electricity. However, as we anticipate a future grid characterized by higher renewable energy penetration, the landscape may evolve, featuring lower average electricity prices, heightened fluctuations, and more significant seasonal variations. Consequently, the attractiveness of electricity regeneration through hydrogen and the benefits of long-duration hydrogen storage are expected to increase substantially in such a dynamic energy scenario. The careful selection of component sizes within the hybrid system proves to be paramount for ensuring cost-effectiveness. Notably, the size of the hydrogen market has emerged as a critical determinant for the optimal size of the electrolyzer. Hydrogen storage should be sized to meet energy shifting requirements. The appropriate size of the fuel cell/microturbine generator hinges on the shape of electricity prices and the available revenue streams derived from participating in grid services. Striking the right balance among these components is essential for maximizing the overall efficiency and profitability of the hydrogen facility. Furthermore, the by-product of electrolysis, namely oxygen, introduces an additional dimension to the system's functionality. The oxygen generated can be effectively utilized for dissolved oxygen (DO) mitigation, particularly with larger electrolyzer sizes capable of satisfying the complete oxygen demand for this purpose. While the economic benefits derived from saved oxygen purchase costs may be relatively modest compared to other revenue streams, the environmental advantages of repurposing oxygen for DO mitigation could help Idaho Power meet their environmental obligations. In addition to the identified factors shaping the viability of hybrid hydrogen production and hydroelectric generation, it is noteworthy that the integration of hydrogen energy storage offers a unique advantage during unusually wet years. In such periods of increased water inflow, the hydrogen storage capacity serves as a valuable supplement to the reservoir. By utilizing hydrogen energy storage as a complementary reservoir, the system gains flexibility in reservoir management when dealing with fluctuations in water availability.

08 HYDROGEN↗

Demonstration of Power System Black Start with Hydropower Generator and Battery Energy Storage: Preprint

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a blackstart- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFMcontrolled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Aquapv

This project brings together a multidisciplinary team to develop tools and analysis that will help U.S. industry accelerate deployment of floating PV on reservoirs and estuaries through producing: • A tool to assess potential environmental interactions of FPV on reservoirs and estuaries and thresholds for corresponding impacts. • A tailored FPV-specific techno-economic tool to guide users on financial performance and corresponding design considerations. • A synthesized tool, AquaPV, that combines the environmental and economic tools. • A set of case studies on an open-loop reservoir with a traditional hydropower plant (i.e., connected to a natural waterbody), closed-loop reservoir with a proposed pumped storage hydropower plant (i.e., manmade and disconnected from a natural waterbody), and a marine estuary (i.e., where a river meets the ocean), with an FPV system designed and modeled for each site. • A review of regulatory, environmental, and stakeholder opportunities and challenges to identify clear regulatory and environmental pathways to siting FPV on U.S. reservoirs. • A novel, high-fidelity geospatial resource assessment to estimate FPV technical potential on reservoirs in the United States.

Phillips, TylerB. [Idaho National Laboratory (INL)↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗