Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reusable Rocket Engine Operability Modeling and Analysis

This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

Christenson, R. L.↗

Futureproofing through 2035 for the AI and HPC Power Density Trend

HPC and AI are businesses necessitating growth for providing performance improvement with increased power and cooling. As HPC and AI computers and their supporting facilities approach utility scale with a frequency of technology innovation outpacing utility and construction timelines, understanding and designing for this trend has become critical. This paper will provide historical trend data for facilities and compute racks, relate power trend data to cooling technology capabilities, and reason through constraints impacting anticipated future power densities to aid the reader in futureproofing a facility’s power and cooling systems through the mid-2030’s.

97 MATHEMATICS AND COMPUTING↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

Restricted by Whom? A Historical Review of Strategies and Organization for Restricted Earth Return of Samples from NASA Planetary Missions

This presentation is a review of the timeline for Apollo's approach to Planetary Protection, then known as Planetary Quarantine. Return of samples from Apollo 11, 12 and 14 represented NASA's first attempts into conducting what is now known as Restricted Earth Return, where return of samples is undertaken by the Agency with the utmost care for the impact that the samples may have on Earth's environment due to the potential presence of microbial or other life forms that originate from the parent body (in this case, Earth's Moon).

Apollo↗

EVA Planning: Using Neutral Buoyancy Laboratory (NBL) Training to Predict in-Flight Energy Expenditure

Metabolic rate (“met rate”) is the amount of energy expended over a period of time and is influenced by many factors including body composition, level of physical activity, resting metabolic rate, sex, age, and food intake. Met rate is measured during Extravehicular Activity (EVA) training at the Neutral Buoyancy Laboratory (NBL) and during in-flight EVAs through indirect calorimetry, calculating energy expenditure from respiratory measurements of O 2 consumption and/or CO 2 production. During Extravehicular Activity (EVA) planning, metabolic cost is important to consider and is used to inform EVA duration based on spacesuit consumables associated with life support systems. Currently, NBL and previous ISS EVA met rate data for specified crewmembers are utilized to predict in-flight EVA metabolic costs based on a proposed EVA timeline. Timeline data collected during training is used to relate met rates to specific EVA activities, which are in turn assigned to more generalized EVA task categories, categorizing by both task type and restraint type. EVA task categories include EVA Setup/Cleanup, Worksite Setup/Cleanup, Cable Routing, Bolts, Fluid Connectors, Electrical Connectors, R&R Work, Miscellaneous Work, Incapacitated Crew Rescue (being rescued or performing), Assisted Crew Rescue (being assisted or performing), and Translation. Restraint types consist of Free-Float, Body Restraint Tether (BRT), Articulating Portable Foot Restraint (APFR), and Space Station Remote Manipulator System (SSRMS). From a crewmember’s historical data, individualized 10th, 50th and 90th percentile met rate estimates are generated for each task category and used to estimate the proposed EVA timeline metabolic cost. In-flight metabolic data (“As-Executed”) from recent ISS US EVAs 85-88 (totaling eight EVA crewmember met rates) was compared with their predicted metabolic cost (“As-Planned”) to evaluate the accuracy of the current met rate estimation method. Across the four EVAs, As-Executed Cumulative EVA Total Metabolic Cost (M = 5893.78 BTU, SD = 816.60) was not significantly different compared to As-Planned Cumulative EVA Total Metabolic Cost (M = 6106.60 BTU, SD = 826.62; t(7) = 0.751 , p = .477). Though not a significant difference, generally, As-Planned total estimates were slightly higher than As-Executed total metabolic cost. Relative Error for Cumulative EVA Total Metabolic Cost ranged from -33% to 14.7%, depending on the crewmember and EVA. When comparing As-Planned to A-Executed EVA task categories for Bolts, Electrical Connectors, EVA Cleanup, EVA Setup, Miscellaneous Work, Translation, Worksite Cleanup, and Worksite Setup during these EVAs, no significant differences were observed, however, there was a significant difference in As-Planned (M = 783.71 BTU, SD = 408.88) compared to As-Executed (M = 608.87 BTU, SD = 425.29) metabolic cost for the task category of Repair-and-Replace (R&R) Work (t(17) = 3.21 , p = .005). Looking closer within the R&R Work task category, As-Executed R&R Work with Free-Float restraint type (M = 706.17 BTU, SD = 352.18) was significantly less than As-Planned R&R Work with Free-Float restraint type (M= 887.96 BTU, SD = 381.42; t(12) = 2.59, p < .024). As-Executed R&R Work with SSRMS Restraint type (M = 355.89 BTU, SD = 534.65) was not significantly different from As-Planned values (M = 512.69 BTU, SD = 383.34; t(4) = 1.88, p = 0.132). These findings suggest that the energy expended performing R&R Work (Free-Float) is lower in flight than predicted. Accurate predictions of the metabolic cost of EVA are essential for planning and executing successful ISS EVAs. Overall, the current met rate prediction method is similar to actual in-flight values, slightly erring on the side of overestimation. Future work includes analysis of more historical in-flight EVA data to increase the power of the analysis, evaluating the NBL-ISS met rate conversion factor between NBL and ISS tasks, as well as exploring methods of substitution when crewmembers are missing prior task category data.

Lauren Cox↗

Design of a 2-Hour Prebreathe Protocol for Space Walks (EVAs) from the International Space Station (ISS)

The majority of extravehicular activities (EVAs) performed from the shuttle use a 10.2 psi staged decompression. The International Space Station (ISS) will operate at 14.7 psi, requiring crews to "campout" in the airlock at 10.2 psi. The constraints associated with campout (crew isolation, oxygen usage, and waste management), provided the rationale to develop a 2-hour prebreathe protocol from 14.7 psi. Previous studies on the affect of microgravity and exercise during prebreathe suggested the feasibility of this approach. Various combinations of adynamia (nonwalking subjects), prebreathe exercise doses, and space suit donning options (10.2 vs. 14.7 psi) were analyzed against timeline and consumable constraints. Prospective decompression sickness (DCS) and venous gas emboli (VGE) accept/reject criteria were defined from statistical analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept / reject limits were adjusted for greater safety (including Grade IV VGE criteria) based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center laboratory trial, including the capability of rejecting the primary protocol and testing at least one alternate exercise dose, within the 2-hour prebreathe. The 2-hour protocol incorporates 0, breathing for 5 0 min at 14.7 psi, including 10 min dual cycle ergometry at 75%VO(2max). It requires an additional 30 minO2breathing during depress from 14.7 to 10.2 psi, followed by a 30-60 min suit donning break at 10.2 psi/26.5% O2. It concludes with a 40 min in-suit O2 prebreathe. The protocol would be accepted for operations, if the incidence of DCS was less than 15% and Grade IV VGE less than 20%, both at 95% confidence. The above protocol and accept/reject limits were implemented in a multi-center study.

Gernhardt, M. L.↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

NASA: Past, Present, and Future

A brief timeline of spaceflight milestones from the launch of Sputnik in 1957 to the International Space Station is presented in this viewgraph presentation, together with historical photographs.

Rodriquez, Pete↗

Battery Key Performance Projections based on Historical Trends and Chemistries

Recent improvements in state-of-the-art (SOA) batteries driven by the automotive sector have led to many electrified aircraft concepts choosing batteries as the preferred energy-storage method. Current SOA batteries are at the point of enabling certain hybrid and all-electric aircraft, particularly small, short range, lower speed aircraft. Higher performance batteries improve aircraft range and can enable larger, higher speed aircraft. In this work, we develop specific energy projections for future electrified aircraft. The projections are developed based on examining historical commercial SOA trends as well as practical limitations of future chemistries. Accurate projections of future specific energy values are important for estimating the timeline for commercial introduction of electrified aircraft. This work estimates nominal cell level specific energies for rechargeable batteries of 489 Wh/kg by 2030, 638 Wh/kg by 2040, and 764 Wh/kg by 2050. More conservative as well as more aggressive estimates are also provided.

Blake Tiede↗

Sub-sized specimen testing and its relationship with Gen IV Materials Qualification

Renewed interest in advanced reactor technologies which can produce inherently safe, reliable, low carbon, low cost energy requires the development of new materials which can operate in the extreme environments proposed by Gen IV reactor designs. The primary focus of the Nuclear Materials Discovery and Qualification Initiative (NMDQi) is to accelerate the process by which new materials can make their way into commercial use, enabling new technologies and innovations within the nuclear sector. Due to limitations in the production of neutron irradiated material for testing and qualification, the use of specimens far smaller than those traditionally called for in regulatory codes becomes a necessity. While the use of these sub-sized specimens is necessary to achieve materials qualification on a realistic timeline and budget, literature showing the efficacy of these samples as an appropriate surrogate for ASME/ASTM defined samples is limited. This poster will detail historical efforts to compare the mechanical behavior of small geometry samples with bulk material behavior and the potential of sub-sized specimen testing at INL for future materials qualification efforts.

36 MATERIALS SCIENCE↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

On the Use of Satellite Nightlights for Power Outages Prediction

Hurricanes are a dominant disaster in the Caribbean, always causing serious power outages throughout the islands. Hurricane Maria was a prime example, causing unimaginable destruction of the power infrastructure of Puerto Rico (PR). Consequently, one month after the hurricane landfall, approximately 80% of the population was still without power. After an event of such massive destruction, the electric power restoration process progresses very slowly. This timeline can be improved using power outage (PO) forecast models that help identify the vulnerable places before the hurricane landfall. Generally, these models are trained with historical power outages records, associated data on weather conditions, and additional information about the natural and built environments. However, PO records are often difficult to acquire, and, in many instances, the power utility companies may not record them. This study utilizes a satellite-based Visible Infrared Imaging Radiometer Suite (VIIRS) night light data product as a surrogate for the power delivery to predict hurricane-induced PO in areas having limited to nonexistent historical data records. The processed satellite data is then used along with geographic variables, and simulated weather data to formulate machine learning-based algorithms to predict PO for future hurricane events. These models are applied and validated in the context of the PR catastrophic storm, Hurricane Maria.

54 ENVIRONMENTAL SCIENCES↗

Design and Testing of a 2-Hour Oxygen Prebreathe Protocol for Space Walks from the International Space Station

To develop and test a 2-hour prebreathe protocol for performing extravehicular activities (EVAs) from the International Space Station (ISS). Combinations of adynamia (non-walking), prebreathe exercise, and space suit donning options (10.2 vs. 14.7 psi) were evaluated, against timeline and consumable contraints to develop an operational 2- hour prebreathe protocol. Prospective accept/reject criteria were defined for decompression sickness (DCS) and venous gas emboli (VGE) from analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew-members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept/reject limits were adjusted for greater safety based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center human trial. Protocols were tested with 4 different prebreathe exercises (Phases I-IV), prior to exposure to 4.3 psi for 4 hrs. Subject selection, Doppler monitoring for VGE, test termination criteria, and DCS definitions were standardized. Phase I: upper and lower body exercises using dual-cycle ergometry (75% VO2 max for 10 min). Phase II: ergometry plus 24 min of light exercise (simulating space-suit preparations). Phase III: same 24 min of light exercise but no ergometry, and Phase IV: 56 min of light exercise without ergometry. A prebreathe procedure was accepted if, at 95% confidence, the incidence of DCS was less than 15% (with no Type II DCS), and Grade IV VGE was less than 20%.

Gernhardt, Michael L.↗

Historic and Current Launcher Success Rates

This presentation reviews historic and current space launcher success rates from all nations with a mature launcher industry. Data from the 1950's through present day is reviewed for possible trends such as when in the launch timeline a failure occurred, which stages had the highest failure rate, overall launcher reliability, a decade by decade look at launcher reliability, when in a launchers history did failures occur, and the reliability of United States human-rated launchers. This information is useful in determining where launcher reliability can be improved and where additional measures for crew survival (i.e., Crew Escape systems) will have the greatest emphasis

Rust, Randy↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

LDRD-DR: Accelerating Nuclear Fuel Qualification through Integrated Multiscale and Multiphysics Models [Slides]

Nuclear fuel qualification implies ensuring that a new fuel can safely operate in a reactor under both normal and accident conditions. Historically, extensive irradiation campaigns probe fuel performance relationships and interconnections in an integral sense, which is very time-consuming and costly. The presentation focus is on introducing advanced modeling and simulation into the qualification process in order to reduce the qualification timeline by targeting fewer integral tests

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Shadow of the Future: Developing Trust and Software within the Exascale Computing Project

Collaboration and team science are emerging areas of interest in software production. Historically, multi-institutional research collaborations are difficult to initiate and maintain, negatively impacting communication, negotiation, and dialogue between industry, government, and academic researchers. The Exascale Computing Project (ECP), a massive, multi-team, high-stakes initiative, facilitated broader research collaboration under a shared funding structure and extended timeline to support scientific discovery. Here, we conducted interviews with ECP teams, representing a variety of domain specialties, research institutions, and programming backgrounds. Using thematic analysis, we assessed how ECP’s structure created an environment of increased trust among projects and how software shared between teams facilitated sustained collaboration. We found that the expectation of future collaboration, i.e., the shadow of the future, greatly enhanced trust among teams and the quality of scientific software produced. Based on our findings within ECP projects, we connect to the existing literature on trust in software engineering and share recommendations for sustainable multi-institutional collaboration and shared best software practices.

Exascale computing project↗