At least 37 records · Page 2

Architecture for Quantum-in-the Loop Real-Time Simulations for Designing Resilient Smart Grids

With the power grid growing more complex every day with the inclusion of new sensors and regulatory approvals that enable end-users and small local developers to participate in the grid, it is becoming challenging for conventional smart grid simulation, emulation, and testing technologies to keep up. In this work, we propose that quantum-encoded real-time simulations can be helpful under the new paradigm and operational circumstances to solve optimization problems for power grids. By leveraging the principles of quantum mechanics, the proposed quantum-in-loop (QIL) framework will enable better and faster optimization solutions based on real-world, real-time data streams, facilitating the real-time planning and operations of electrical grids that rely on millions of distributed sensors and controllers. Furthermore, QIL will allow researchers and engineers to assist utilities in designing, developing, and de-risking algorithms to optimize power grid operation and resilience by considering inputs from millions of grid-connected devices. QIL framework is being developed to have a self-limiting triage mechanism, which will help engineers and practitioners identify fundamental physical limits on quantum processors, revealing what quantum algorithms can and cannot do in utility-specific use cases and must continue to count on classical high-performance computing infrastructure.

digital real-time simulation↗

Impacts of Experimentally Obtained Harmonic Spectrums of Residential Appliances on Distribution Feeder

Owing to the increased use of power electronic based appliances and energy-efficient home equipment such as modern lighting loads, the percentage of nonlinear loads has increased in the distribution system, which can impact system performance, loss, and stability. Thus a comprehensive knowledge of their power quality and harmonic analysis is essential to improve the load models, voltage stability assessment, determination of possible interactions at harmonic frequencies, protection planning, and the effect of system impedance. This paper focuses on harmonic load flow analysis for multiple residential load types to determine the expected impacts on an modeled distribution secondary. For this study, the household appliances include lighting, power electronic, resistive, and motor loads with a nominal supply voltage of 120 V single-phase or 240 V split phase at a nominal frequency of 60 Hz. The harmonic spectrums, as obtained from the experimental evaluation of real loads, are used to inform the harmonic load flow for a detailed secondary network, including the distribution service transformer extracted from a real distribution feeder's model. Additionally, the impact of voltage harmonics on a three-phase test load is presented with experimental results. The harmonic data of the transformer terminal voltage, as obtained from the former load flow study, are scaled to generate the source voltage for the three-phase configuration of the grid simulator to make the test setup very similar to a typical secondary design in the U.S.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

NREL Controllable Grid Interface for Testing MW-Scale Wind Turbine Generators (Poster)

In order to understand the behavior of wind turbines experiencing grid disturbances, it is necessary to perform a series of tests and accurate transient simulation studies. The latest edition of the IEC 61400-21 standard describes methods for such tests that include low voltage ride-through (LVRT), active power set-point control, ramp rate limitations, and reactive power capability tests. The IEC methods are being widely adopted on both national and international levels by wind turbine manufacturers, certification authorities, and utilities. On-site testing of wind turbines might be expensive and time consuming since it requires both test equipment transportation and personnel presence in sometimes remote locations for significant periods of time because such tests need to be conducted at certain wind speed and grid conditions. Changes in turbine control software or design modifications may require redoing of all tests. Significant cost and test-time reduction can be achieved if these tests are conducted in controlled laboratory environments that replicate grid disturbances and simulation of wind turbine interactions with power systems. Such testing capability does not exist in the United States today. An initiative by NREL to design and construct a 7-MVA grid simulator to operate with the existing 2.5 MW and new upcoming 5-MW dynamometer facilities will fulfill this role and bring many potential benefits to the U.S. wind industry with the ultimate goal of reducing wind energy integration costs.

17 WIND ENERGY↗

Interconnection Standard Grid-Support Function Evaluations Using an Automated Hardware-in-the-Loop Testbed

Grid operators are increasingly turning to advanced grid-support functions in distributed energy resources (DER) to assist with distribution circuit voltage regulation, bulk system frequency control, and power system protection. The U.S. DER certification standard, Underwriters Laboratories (UL) 1741, was revised in September 2016 to add test procedures for multiple grid-support functions. Sandia National Laboratories, SunSpec Alliance, and growing community of collaborators have undertaken a multiyear effort to create an open-source system validation platform (SVP) that automates DER interconnection and interoperability test procedures by communicating with grid simulators, photovoltaic (PV) simulators, data acquisition systems, and interoperable equipment under test. However, the power hardware required for generating the test conditions may be untenable for many organizations. In this paper, we discuss development of the SVP testing capabilities for UL 1741 tests utilizing a controller hardware-in-the-loop testbed that precludes the need for power hardware using a 34.5 kW Austrian Institute of Technology smart grid controller. Finally, analysis of normal ramp rate, soft start ramp rate, specified power factor, volt-VAr, and frequency-watt advanced grid functions, and the effectiveness of the UL 1741 test protocols are included.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Testing Framework for Grid-Forming Resources: Preprint

This paper presents a testing framework for grid-forming (GFM) resources. It first analytically derives in frequency domain the active and reactive power response of an ideal voltage source with a reactor. These transfer functions are then used to quantify the voltage source behavior expected from a GFM inverter within subtransient time scales (5-10 cycles) following a grid disturbance. The paper also shows that the testing of a GFM inverter might require a reactor of an appropriate size between the inverter and the grid simulator used for the inverter testing. Finally, the paper presents a systematic approach for developing specifications for GFM resources using active and reactive power response frequency scans. The testing framework and results presented in this paper are demonstrated using EMT simulations of a 1-MW GFM inverter.

frequency scans↗

Modeling the U.S. Western Electric Interconnection to Understand the Consequences of Hydrometeorological Extremes and Options for Risk Mitigation

Electricity grid operators around the world face a dual challenge; withstanding increasingly severe weather and the longer term impacts of climate change, while simultaneously decarbonizing. Extreme weather events such as heat waves and droughts are rising in both severity and frequency, which is threatening the reliability of electricity grids through increased demand, generation capacity losses, and equipment failures. Consequently, incorporating hydrometeorological stressors into computational power systems analysis is becoming an even more critical tool in long term planning and short term operations. However, there is a general lack of open-source customizable grid simulation software capable of exhaustively stress testing the grid under hydrometeorological uncertainty, and/or examining potential risk mitigation pathways. A related, persistent challenge for power system modelers is striking an appropriate balance between model fidelity (e.g. spatial scale and time resolution) and computational tractability (wall clock run-time). In this study, we are proposing a solution to this problem with open-source software that allows users to seamlessly customize the scale and track the accuracy of grid operations models. Our approach allows users to search over numerous model parameters (network topology, mathematical formulation, economic hurdle rates, and transmission line scaling) to identify model instantiations that accommodate experimental design. Further, we use this approach to demonstrate the importance of including extreme weather events in model validation and model selection. Focusing on the occurrence of heatwaves and droughts in the U.S. Western Interconnection, we examine role of extreme events in balancing tradeoffs between model fidelity and run-time at the model design stage.

Economics↗

A Testing Framework for Grid-Forming Resources

This paper presents a testing framework for grid-forming (GFM) resources. First, it analytically derives in the frequency domain the active and reactive power response of an ideal voltage source with a reactor. These transfer functions are then used to quantify the voltage source behavior expected from a GFM inverter within subtransient timescales (5-15 cycles) following a grid disturbance. The paper also shows that the testing of a GFM inverter might require a reactor of an appropriate size between the inverter and the grid simulator used for the inverter testing. Finally, the paper presents a systematic approach for developing specifications for GFM resources using active and reactive power response frequency scans. The testing framework and results presented in this paper are demonstrated using EMT-PSCAD simulations of a 1-MW GFM inverter.

frequency scans↗

Generic characterization of electrical test benches for AC- and HVDC-connected wind power plants

The electrical test and assessment of wind turbines go hand in hand with standards and network connection requirements. In this paper, the generic structure of advanced electrical test benches, including grid emulator or controllable grid interface, wind torque emulator, and device under test, is proposed to harmonize state-of-the-art test sites. On the other hand, modern wind turbines are under development towards new features, concerning grid-forming, black-start, and frequency support capabilities as well as harmonic stability and control interaction considerations, to secure the robustness and stability of renewable-energy-based power systems. Therefore, it is necessary to develop new and revised test standards and methodologies to address the new features of wind turbines. This paper proposes a generic test structure within two main groups, including open-loop and closed-loop tests. The open-loop tests include the IEC 61400-21-1 standard tests as well as the additional proposed test options for the new capabilities of wind turbines, which replicate grid connection compliance tests using open-loop references for the grid emulator. In addition, the closed-loop tests evaluate the device under test as part of a virtual wind power plant and perform real-time simulations considering the grid dynamics. The closed-loop tests concern grid connection topologies consisting of AC and HVDC, as well as different electrical characteristics, including impedance, short-circuit ratio, inertia, and background harmonics. The proposed tests can be implemented using available advanced test benches by adjusting their control systems. The characteristics of a real power system can be emulated by a grid emulator coupled with real-time digital simulator systems through a high-bandwidth power-hardware-in-the-loop interface.

17 WIND ENERGY↗

The Development of a Smart Distribution Grid Testbed for Integrated Information Management Systems

This paper presents a smart distribution grid testbed to test or compare designs of integrated information management systems (I2MSs). An I2MS extracts and synthesizes information from a wide range of data sources to detect abnormal system behaviors, identify possible causes, assess the system status, and provide grid operators with response suggestions. The objective of the testbed is to provide a modeling environment with sufficient data sources for the I2MS design. The testbed includes five information layers and a physical layer; it generates multi-layer chronological data based on actual measurement playbacks or simulated data sets produced by the physical layer. The testbed models random hardware failures, human errors, extreme weather events, and deliberate tampering attempts to allow users to evaluate the performance of different I2MS designs. Initial results of I2MS performance tests showed that the testbed created a close-to-real-world environment that allowed key performance metrics of the I2MS to be evaluated.

99 GENERAL AND MISCELLANEOUS↗

Geomagnetically Induced Current Field Test on Large Grid-Connected Power Transformers: Analysis, Model Development, and Simulations

Geomagnetic-induced current (GIC) flow in power grids can cause undesirable effects such as transformer overheating, harmonics, higher reactive power demand, etc. Many simulation models have been developed to study these effects, but real-world verification on modern transformer designs is rare. Here, this paper presents the first long-duration GIC field test in the U.S. performed on high-voltage, grid-connected transformers featuring winding clamps and tie rods instead of conventional tie bars. Field measurements were taken to evaluate GIC effects. These measurements also aided in developing and validating thermal and electromagnetic transient (EMT) models of the transformers. During the test, significant current and voltage distortions were observed along with considerable transformer reactive power losses. Analysis of the field measurements showed that the transformers’ hottest spot was at the inner windings, and their k-factors were close to factory test and software default values. Thermal simulations indicated that the transformers would not violate their thermal limits even for a GIC waveform that peaks at about 200 A/phase. EMT simulations revealed that increased transformer loading may reduce GIC-induced reactive power demand and harmonics in certain scenarios. The study also highlighted potential inaccuracies in using the k-factor method to calculate transformer reactive power losses.

EMTDC↗

An Evaluation of the Network Simulators in Large-Scale Distributed Simulations

This is a survey paper about the state-of-the-art in large-scale network simulation. Networks for the smart grids are characterized by millions of sensor nodes exchanging information about the status of the grid. This information exchange must be realized reliably and efficiently due to the mission critical nature of the power grid. Hence, the applications and the network protocols developed for the smart grid need go through rigorous testing and analysis before deployment. Developers usually do not have access to such a large-scale network that can be used as a controlled test-bed; therefore, network simulation becomes an essential tool for testing. Network simulation is a well studied problem in the literature and there are various widely used network simulators. These simulators can be adopted for testing applications and protocols of the smart grid. Due to the scale of these networks, parallel/distributed simulations need to be conducted. Even though most network simulators support distributed simulations, generating a large-scale network model to simulate can still be a cumbersome task. In this survey, we describe a selection of commonly used network simulators and evaluate them with respect to the following features that can aid users in distributed simulations of large-scale networks: transparency of setting up distributed simulation, automated topology generation, information hiding, lightweight routing protocols, network error simulation, evaluation of the network model during simulation and trace analysis tools. As a complementary result, we identify two issues with network simulators that can be addressed with runtime steering methods.

99 GENERAL AND MISCELLANEOUS↗

Impacts of Experimentally Obtained Harmonic Spectrums of Residential Appliances on Distribution Feeder: Preprint

This paper focuses on the harmonic load flow study for a set of residential loads and the impacts of the harmonic contents on the distribution feeder. Owing to the increased use of the power electronic based appliances and energy efficient home equipment like the lighting loads, the percentage of non-linear loads has increased in the distribution system which can impact the system performance, loss, and stability. Thus a comprehensive knowledge of their power quality and harmonic analysis is essential to improve the load models, voltage stability assessment, determining possible interactions at harmonic frequencies, protection planning, and the effect of the system impedance. For this study, the household appliances include the lighting, power electronics, resistive, and motor loads with a nominal supply voltage of 120 V single-phase or 240 V split-phase at a nominal frequency of 60 Hz. The harmonic spectrum as obtained from the experimental data is used to solve the harmonic load flow for a detailed secondary network including the distribution transformer extracted from a real distribution feeder's model. Additionally, the impact of the voltage harmonic on a three phase test load is presented through experimental results. The harmonic data of the transformer terminal voltage as obtained from the former load flow study is scaled to generate the source voltage for the three phase configuration of the grid simulator to make the test setup very similar to a real scenario.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Creation of System Validation Platform

The objective of this CRADA between Sandia National Laboratories (SNL) and SunSpec Alliance (SunSpec) was to create a software test platform called the System Validation Platform (SVP) that performs end-to-end certification testing of photovoltaic (PV) inverters, energy storage systems, and other distributed energy resources (DERs). The SVP automates interactions of test equipment (PV and grid simulators), data acquisition systems, and interoperable DERs to certify the devices for advanced grid-support functions and interoperability. To assist electricity grid, operators maintain voltage and frequency, new interconnection requirements in the U.S. and Europe require DERs to have grid-support functions with adjustable settings. Automating the certification process for DER devices impacts the bottom line of NRTLs because they do not need to rely on test engineers running days (or weeks) of experiments to validate the performance of the equipment. These savings can then be passed down to the DER vendors so the certification process becomes less expensive and lowers the barrier to market for PV inverters, charge controllers, and other grid-interconnected equipment. This technology can also be used as a research platform for SNL, other national labs, and universities that would like to run hardware tests with power electronics equipment.

14 SOLAR ENERGY↗

PV Inverter Testing for Momentary Cessation and Rate-of-Change-of-Frequency Events: Preprint

To understand the power system stability and develop better electromagnetic transient (EMT) models of field deployed photovoltaic (PV) inverters, it is important to characterize inverters' response to abnormal voltage and frequency scenarios. Because EMT models are not typically available for small distribution-connected PV inverters, and because inerterconnection standards historically did not specify desired ride-through behaviors, we tested two such inverters in the lab to characterize their responses to severe undervoltage events and high rate-of-change-of-frequency (ROCOF) conditions. The inverters tested were pre-IEEE 1547-2018 residential PV inverters widely used in the Hawaiian Electric territory and many other areas. The testing results for undervoltage scenarios showed that the inverter from one vendor exhibited momentary cessation while the inverter from the other vendor did not exhibit momentary cessation behavior or tripping for most of the events below the 120 ms undervoltage trip threshold duration set by IEEE 1547-2003. The testing results for ROCOF scenarios showed that the inverter from one vendor temporarily lost synchronization during ROCOF conditions while the inverter from the other vendor did not lose synchronization or cease generation for any ROCOF conditions. Both the inverters were also tested for EMT-simulated grid events with severe changes in frequency and voltage. The observed responses of the inverters were different from the simulated response of PV inverters represented the best available assumptions from pre-existing information. The results from these experiments can be used to update the inverter models used in bulk power system studies.

IEEE 1547 2018↗

PV Inverter Testing for Momentary Cessation and Rate-of-Change-of-Frequency Events

To understand the power system stability and develop better electromagnetic transient (EMT) models of field deployed photovoltaic (PV) inverters, it is important to characterize inverters' response to abnormal voltage and frequency scenarios. Because EMT models are not typically available for small distribution-connected PV inverters, and because inerterconnection standards historically did not specify desired ride-through behaviors, we tested two such inverters in the lab to characterize their responses to severe undervoltage events and high rate-of-change-of-frequency (ROCOF) conditions. The inverters tested were pre-IEEE 1547-2018 residential PV inverters widely used in the Hawaiian Electric territory and many other areas. The testing results for undervoltage scenarios showed that the inverter from one vendor exhibited momentary cessation while the inverter from the other vendor did not exhibit momentary cessation behavior or tripping for most of the events below the 120 ms undervoltage trip threshold duration set by IEEE 1547-2003. The testing results for ROCOF scenarios showed that the inverter from one vendor temporarily lost synchronization during ROCOF conditions while the inverter from the other vendor did not lose synchronization or cease generation for any ROCOF conditions. Both the inverters were also tested for EMT-simulated grid events with severe changes in frequency and voltage. The observed responses of the inverters were different from the simulated response of PV inverters represented the best available assumptions from pre-existing information. The results from these experiments can be used to update the inverter models used in bulk power system studies.

aggregates↗

2021 Small Turbine Certification Awardee: Intergrid LLC

Currently, there are no U.S., fully certified inverters for wind turbines in the 10-15-kilowatt (kW) range. The federal government's Competitiveness Improvement Project (CIP) and Small Business Innovation Research programs present the most viable paths for manufacturers in the distributed wind energy industry to conduct research, develop their products, and, ultimately, commercialize them. Through CIP, Intergrid LLC is reducing the cost, size, and weight of its legacy inverter for distributed wind turbines while increasing efficiency, reliability, and serviceability. To accomplish this, Intergrid will address three areas related to power electronics for distributed wind turbines: (1) Software verification and functional safety certification; (2) Simulation for grid-interconnecting testing; (3) Component alternatives that reduce cost and improve reliability and serviceability. The first two areas relate to long-term management of inverter software, which, for grid-connected inverters, must comply with three standards - one issued by Underwriters Laboratories (UL) and two issued by the Institute of Electrical and Electronics Engineers.

CIP↗