Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “gateway deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Jettison and Disposal from Near Rectilinear Halo Orbits, Part 1: Theory

The proposed Gateway spacecraft in a Near Rectilinear Halo Orbit (NRHO) will be a human outpost in cislunar space. The baseline mission may experience the deployment of visiting vehicles, cubesats, and on-orbit debris. Departure from the NRHO and cislunar space is nontrivial due to the complex gravitational environment that persists in and around Gateway. Long-term disposal orbits in heliocentric space offer safe destinations for deployed objects. To mitigate risks associated with conjunctions between Gateway and deployed objects, strategies to identify risk-avoidant paths to heliocentric space are necessary for Gateway mission operations.

Stephen T. Scheuerle↗

Design of an Open Smart Energy Gateway for Smart Meter Data Management

With the widespread deployment of electronic interval meters, commonly known as smart meters, came the promise of real-time data on electric energy consumption. Recognizing an opportunity to provide consumers access to their near real-time energy consumption data directly from their installed smart meter, we designed a mechanism for capturing those data for consumer use via an open smart energy gateway (OpenSEG). By design, OpenSEG provides a clearly defined boundary for equipment and data ownership. OpenSEG is an open-source data management platform to enable better data management of smart meter data. Effectively, it is an information architecture designed to work with the ZigBee Smart Energy Profile 1.x (SEP 1.x). It was specifically designed to reduce cyber-security risks and provide secure information directly from smart meters to consumers in near real time, using display devices already owned by the consumers. OpenSEG stores 48 hours of recent consumption data in a circular cache using a format consistent with commonly available archived (not real-time) consumption data such as Green Button, which is based on the Energy Services Provider Interface (ESPI) data standard. It consists of a common XML format for energy usage information and a data exchange protocol to facilitate automated data transfer upon utility customer authorization. Included in the design is an application program interface by which users can acquire data from OpenSEG for further post processing. A sample data display application is included in the initial software product. The data display application demonstrates that OpenSEG can help electricity use data to be retrieved from a smart meter and ported to a wide variety of user-owned devices such as cell phones or a user-selected database. This system can be used for homes, multi-family buildings, or small commercial buildings in California.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Summary of Gateway Power and Propulsion Element (PPE) Studies

NASA's Power and Propulsion Element (PPE) is based on a joint industry/NASA demonstration of an advanced solar electric propulsion powered spacecraft to meet commercial and NASA objectives. The PPE can establish the initial presence in cislunar space for the Gateway through initial operations and the subsequent deployment of additional partner-provided elements for the cislunar platform. Five commercial vendors were selected to conduct PPE studies which addressed key drivers for PPE development and support for the Gateway concept formulation. The study vendors focused on their performance trades and assessing their strategic capabilities, leveraging their existing and planned capabilities for PPE development. The industry studies examined differences between prior Solar Electric Propulsion (SEP) mission concepts, expected industry capabilities, and potential needs supporting NASA's Gateway concept. These studies provided data on commercial capabilities relevant to NASA's exploration needs and reduced risk for a new, powerful, and efficient SEP-based PPE spacecraft.

Irimies, David↗

Disposal, Deployment, and Debris in Near Rectilinear Halo Orbits

A proposed Gateway facility in a lunar Near Rectilinear Halo Orbit (NRHO) will serve as an outpost in deep space, with spacecraft periodically arriving and departing. Departing objects will include logistics modules, requiring safe disposal, cubesats, deployed to various destinations, and debris objects, whose precise paths may be unknown. Escape dynamics from NRHOs are complex; primarily influenced by the Earth and Moon within the orbit, spacecraft are significantly impacted by solar gravity upon departure. The current investigation explores the dynamics of departure from the NRHO, including the risk of debris recontact, safe heliocentric disposal, and deployment to select destinations.

Davis, Diane C.↗

Roadmap for the Application of Ion Beam Technologies to Challenges for the Advancement and Implementation of Nuclear Energy Technologies

The use of ion beams in interrogating materials performance for nuclear energy applications is advancing at a rapid rate. Ion irradiations have been proven to produce radiation effects data that are of direct relevance for understanding neutron-induced displacement damage. This development reflects significant and continued investment in infrastructure by the U.S. Department of Energy (DOE) as well as support of science and engineering research at universities and national laboratories. Application of ion beam irradiation methods to enhance the deployment of materials in reactors is in the spirit of the Gateway for Accelerated Innovation in Nuclear (GAIN) initiative sponsored by DOE to accelerate the deployment of innovation in the U.S. nuclear industry. Ion beam irradiation shows considerable promise for assisting in down selecting candidate materials for use in both current and advanced nuclear energy systems. Ion beams allow rapid achievement of materials damage levels not accessible by neutron irradiation in test reactors due to cost and time constraints. Ion beam studies provide data on the effects of irradiation under very specific conditions of temperature, radiation dose, and radiation dose rate that are difficult or impossible to achieve via reactor irradiation experiments. This data can be used to develop and validate detailed predictive radiation effects models for use in reactor materials research and development. Despite the current high state of the art and the maturity of quality assurance, there are still challenges to the deployment of ion beam data in support of reactor materials qualification. For the most part, these challenges arise from the lack of a detailed mechanistic understanding of potential difference between ion induced and neutron induced materials damage, which is exacerbated by difficulties in obtaining bulk physical and mechanical properties data from the micron-scale heavy ion irradiation depths. In particular, improved understanding of dose rate effects, as a function of temperature, are needed. This document offers a roadmap for the development and enhancement of current U.S. ion beam irradiation technologies within university and national laboratory settings, and especially for the deployment of new highly controlled in situ interrogation of materials during irradiation to provide dynamic and mechanistic data for model development. The status and capabilities of relevant U.S. ion beam facilities are summarized and recommended “best practices” for performing ion irradiations are described. The potential role of ion beam irradiations to assist the development and deployment of reactor materials is outlined. Key principles include developing methods for rapid and cost-effective materials selection and development, characterizing fundamental material response under irradiation, and developing a robust mechanistic understanding of microstructure evolution under irradiation (including development and validation of reliable predictive models for microstructure evolution).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Developing Autonomous Technologies for Biological Missions to Deep Space

In upcoming biological missions beyond low Earth orbit (LEO), the use of autonomous instrumentation will allow scientists to perform a variety of experiments, including the characterization of the response to different space environments (Moon, Mars, interplanetary space) using biological models like microbes, plants, organoids, and tissue chips. BioSentinel is an ongoing deep space mission, currently at over 50 million kilometers from Earth and the first instrument developed to perform biological experiments beyond LEO. Even though the primary objective of this CubeSat mission was to investigate the effects of the deep space radiation environment on budding yeast, the spacecraft bus (i.e., all the subsystems that support the biological payload like power, thermal, data telemetry, navigation, etc.) can accommodate a variety of biological (and physical) experiments and model organisms. LEIA, an upcoming CLPS mission to the lunar surface, uses a microfluidic and optical instrument based on BioSentinel to study the effects of the lunar environment on different cellular processes and on bioproduction of antioxidants. A new series of science mission concepts are being proposed to be accommodated into platforms like BioSentinel. These missions will investigate the response of a variety of organisms to the deep space environment, including but not limited to single-cell eukaryotes, cyanobacteria, plants (including crops), organoids, and tissue chips. In addition to optical absorbance measurements like the ones performed in BioSentinel (and LEIA), we are investigating the use of fluorescence detection, microscopy, sequencing devices, etc. Thus, instruments like the ones proposed here can be adapted to a variety of platforms like free-flyers, deployable payloads, landers, rovers, and the lunar Gateway. These technologies can be used as steppingstones for establishing a sustained human presence on the Moon and in deep space while providing knowledge for the development of potential countermeasures.

Sergio R Santa Maria↗

Predictor-corrector models for lightweight massive machine-type communications in Industry 4.0

Future Industry 4.0 scenarios are characterized by seamless integration between computational and physical processes. To achieve this objective, dense platforms made of small sensing nodes and other resource constraint devices are ubiquitously deployed. All these devices have a limited number of computational resources, just enough to perform the simple operation they are in charge of. The remaining operations are delegated to powerful gateways that manage sensing nodes, but resources are never unlimited, and as more and more devices are deployed on Industry 4.0 platforms, gateways present more problems to handle massive machine-type communications. Although the problems are diverse, those related to security are especially critical. To enable sensing nodes to establish secure communications, several semiconductor companies are currently promoting a new generation of devices based on Physical Unclonable Functions, whose usage grows every year in many real industrial scenarios. Those hardware devices do not consume any computational resource but force the gateway to keep large key-value catalogues for each individual node. In this context, memory usage is not scalable and processing delays increase exponentially with each new node on the platform. In this paper, we address this challenge through predictor-corrector models, representing the key-value catalogues. Models are mathematically complex, but we argue that they consume less computational resources than current approaches. The lightweight models are based on complex functions managed as Laurent series, cubic spline interpolations, and Boolean functions also developed as series. Unknown parameters in these models are predicted, and eventually corrected to calculate the output value for each given key. The initial parameters are based on the Kane Yee formula. An experimental analysis and a performance evaluation are provided in the experimental section, showing that the proposed approach causes a significant reduction in the resource consumption.

97 MATHEMATICS AND COMPUTING↗

Power and Propulsion for Gateway: A NASA SBIR/STTR Success Story

NASA’s Gateway in lunar orbit will play a critical role in the Artemis program, which aims to land the first woman and the next man on the Moon by 2024. The development of the Power and Propulsion Element for Gateway is being led by Maxar Technologies, a mid-size organization, with contributions from two NASA SBIR/STTR awardees—Deployable Space Systems and Busek Company, Inc, both of which initially developed their Gateway contributions with support from the NASA SBIR/STTR program.

SBIR/STTR↗

GAIN Technology Workshops Summary Report

National and global demand for nuclear energy is increasing and United States (U.S.) global leadership is eroding. There is a sense of urgency with respect to the deployment of the innovative nuclear energy technologies. The Gateway for Accelerated Innovation in Nuclear (GAIN) initiative is based on the simultaneous achievement of three strategic goals. The first is maintaining global technology leadership within the U.S. Department of Energy (DOE). The second is enabling global industrial leadership for nuclear vendors and suppliers. The third is focused on utility optimization of nuclear energy within the clean energy portfolio. An effective public-private partnership is required to achieve these goals. DOEs recognizes the recent sense of urgency new developers and investors have in getting their concepts to market. They know that time to market for nuclear technology takes too long and the facilities needed to conduct the necessary research, development and demonstration (RD&D) activities are very expensive to develop and maintain. Early technologies, in the lower technology readiness levels (TRL) need materials testing, analysis, modeling, code development, etc., most of which currently exists in the DOE national laboratory system. However, mature technologies typically need large component testing and demonstration facilities, which are expensive and long-lead efforts. By understanding the needs of advanced nuclear technology developers, GAIN will connect DOE national laboratory capabilities (e.g., facilities, expertise, materials, and data) with industry RD&D needs. In addition, GAIN is working with the Nuclear Regulatory Commission (NRC) to streamline processes and increase understanding of the licensing requirements for advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Smart Crop Farming Systems for Artemis Exploration Missions

Space crop production systems that mitigate risks of crew poor performance or illness due to inadequate food and nutrition are needed during manned Artemis exploration missions beyond LEO. Prototype farms must be designed for deployment on ISS and tested in manned platforms: Gateway, lunar habitats, and Mars trans-hab spacecraft in preparation for human missions to Mars. Food production must be optimal and safe for human consumption. Thus, plant growth facilities (i.e. Veggie and APH) can be enhanced with imaging systems (including hyperspectral, multispectral, lidar, and fluorescence imaging systems) for nondestructive monitoring of plant health, stress and assessing food safety. Databases of crop responses to stress obtained during ground studies can be used to develop novel artificial intelligence (AI) algorithms for optimizing crop production (i.e. environmental settings during growth) and for detecting crop indices that ensure food safety. Future farming systems should be sustainable and smart. Novel adaptive AI algorithms requiring limited data sets for calibration are needed for reducing crew intervention during plant cultivation except for maintenance and harvesting events. Eventually, AI driven control systems that include autonomous planting, growing, and harvesting as well as periodic sanitization need evaluation for supplementing crew diets with fresh produce during future Mars exploration missions.

O Monje↗

NDNSEG (Named Data Network Scalable Environment Generator) [SWR-21-91]

NDNSEG (Named Data Network Scalable Environment Generator) automates the deployment of NDN environments in NREL's Cyber-Energy Emulation Platform (CEEP). Specifying the number of clients, servers, gateways, and pv_inverters and running NDNSEG will automate the generation of required files to deploy the number of specified virtual machines, the underlying networking infrastructure, and configuration for GitLab CI/CD.

Peterson, Jordan↗

Gateway Program Progress and Overview

This paper provides an overview and status of the Gateway, which will be a small, human-tended space station in orbit around the Moon. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop the Gateway. Gateway is the cornerstone of sustainable deep space human exploration and is an essential element of the infrastructure necessary for the execution of the Artemis missions to the Moon. This paper will outline the current planned configuration and deployment of the station, describing the concept of operations and how Gateway supports both lunar surface missions and also serves as the springboard for exploration deeper in space. Calendar year 2022 will see the accomplishments of major milestones such as over twenty systems preliminary design reviews (PDRs), a Program-wide PDR-informed synchronization review, and NASA Key Decision Point marking the evolution of the program as a whole from the formulation phase and into implementation. This paper will provide a progress update for each major component of the Gateway: The Power and Propulsion Element; the Habitation and Logistics Outpost (HALO); Deep Space Logistics; the International Habitation module; the European System Providing Refueling, Infrastructure, and Telecommunications (ESPRIT), which includes a Refueler Module and the HALO Lunar Communications System; External Robotics System; and an Airlock with both science and crew capabilities. For each component, the paper will describe the current maturity of the modules, acquisition strategy, contracts, and if applicable, international partnership status. This paper will also outline the integration function the Gateway Program Office performs at the NASA Johnson Space Center, including the multilateral governance structure and cross-program interfaces across Artemis.

Gateway↗

NASA: 60 Years and Counting...

Sputnik launched on 4 Oct 1057. On July 29, 1958, Eisenhower signed the National Aeronautics and Space Act, the creation of NASA. The Soviets launched the first human into orbit, Yuri Gagarin, on April 12, 1961. On 5 May 1961, Alan Shepard's Freedom 7 Mercury capsule lifted off at 9:34 a.m. from Launch Complex 5 at Cape Canaveral Air Force Station, and flew a suborbital trajectory lasting 15 minutes and 22 seconds, America's first man in space. On 25 May 1961, Kennedy delivered a speech to a joint session of Congress. In that speech, he stated "I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the moon and returning him safely to the earth." The rest, as they say, is history. Project Mercury, the first U.S. program to put humans in space, made 25 flights, six of which carried astronauts between 1961 and 1963. The Gemini program primarily tested equipment and mission procedures and trained astronauts and ground crews for future Apollo missions to the Moon. Exactly eight years, one month and 26 days after President Kennedy challenged Americans to reach for the Moon, Project Apollo landed the first humans on the lunar surface and returned them safely to Earth. In 1973, Skylab expeditions paved the way for the International Space Station. Over 30 years, NASA's space shuttle fleet, ”Columbia, Challenger, Discovery, Atlantis and Endeavour,” flew 135 missions and carried 355 different people to space. The space shuttle carried people into orbit repeatedly; launched, recovered and repaired satellites; conducted cutting-edge research; and built the largest structure in space, the International Space Station. Tragically, NASA lost two crews of seven in the 1986 Challenger accident and the 2003 Columbia accident. The International Space Station is a model for global cooperation and scientific advancements that is enabling growth of private industry in low-Earth orbit and development of new technologies to advance human space exploration. Built between 1998 and 2011, the space station has housed humans continuously since Nov. 2, 2000. NASA has contracted with commercial companies SpaceX, Orbital ATK, and Sierra Nevada Corporation to deliver science investigations, cargo, and supplies to the crews living in space, and soon Boeing and SpaceX will transport astronauts to and from the station. Today, NASA is working on many fronts to advance man's presence in space. NASA's Exploration Campaign will establish U.S. preeminence in cislunar space through the operations and the deployment of a U.S.-led Lunar Orbital Platform-Gateway (LOPG). Together with the Orion and SLS Programs, the LOPG is central to advancing and sustaining human space exploration goals, and is the unifying single stepping off point for human cislunar operations, lunar surface access and missions to Mars. As one might expect, EMC for all this activity is challenging, to say the least. In the next half-hour or so, I will talk about some of those challenges and how the different programs are meeting them.

Scully, Bob↗

Lunar Commercial Development Infographic

This infographic captures Commercial Landers and Rovers presented in the dates that the companies said in public sources that they plan to deploy their vehicles to the Moon and includes NASA activities (Gateway, Orion, PPP Announcement of Collaborative Opportunity), CLPS, and private investors (Bigelow, Blue Origin, SpaceX). This image is expected to change over time to reflect changes in company's plans as they develop their spacecraft. All images used are public domain except for SpaceX and Bigelow images.

Lynn D Harper↗

Development of a Deployable Opitcal Aperature

The Deployable Optical Receive Aperture (DORA),a new technology being developed jointly between JetPropulsion Laboratory (JPL) and Arizona State University(ASU), is based on deploying arrays of fast optical detectors tocreate large receive apertures and seeks to achieve gigabitconnectivity at distances of thousands of kilometers. Smallspacecraft forming the LunaNet communications network andequipped with optical communications systems, such as theproposed DORA aperture, should be able to communicate atGigabit per second rates over long distances. This data rateenhancement can allow gigabit per second connectivitybetween lunar assets (astronauts, rovers, instruments) and thelunar gateway. Under sponsorship of NASA's Small SpacecraftTechnology Program (SSTP), JPL is deploying the DORApayload and ASU is developing a 3U CubeSat for a follow-onlow-Earth-orbit (LEO) mission to demonstrate DORA'scapabilities. The basic DORA payload consists of 5 receiverpanels, a transmitting telescope and processing units. Eachreceiver panel contains dozens of power-combined detectors tomimic a large optical aperture. The total receive aperture ofDORA is provided by the sum of the effective detecting area ofthe 5 panels. The transmit telescope includes a 200mW, 850nmlaser and a voice-coil fast steering mirror (FSM). The resultingDORA terminal should be able to provide duplex connectivityat rates up to 1 gigabit per second at the distances of interest.We have designed the entire DORA payload and plan topresent the test results of our DORA engineering model. Theseresults include angle-of-arrival, data rate and bit error ratemeasurements.

Yi, Lin↗

Advanced Reactor Supply Chain Assessment (GAIN Report)

Several net-zero scenario evaluations predict a rapid ramp up of nuclear energy in the coming decades. If this materializes, it will most likely strain the supply chains associated with the potential advanced reactor concepts awaiting deployment. To help assess the current and potential capacities of the various advanced reactor supply chains, the Gateway for Accelerated Innovation in Nuclear (GAIN) conducted a survey of companies able to produce components for advanced reactors in the near future (namely for sodium, gas-cooled, and molten salt reactors). Using an aggressive nuclear deployment scenario, the objective was to assess the ability of the various supply chains to meet the considerable demand projections for certain key components (vessels, heat exchangers, pumps, graphite, and sensors) and identify potential challenges. While individual companies were unable to meet the most optimistic nuclear deployment rate projections, it was found that on aggregate, a United States-based supply chain projected that expansion could be ramped up to meet a larger future demand of these components. However, meeting projected demand for several more complex items (namely gas or salt heat exchangers) was found to be more challenging. Deploying new reactors at scale necessitates the production of more and more supply chain components, requiring a ramp up in production. Supply chain companies were surveyed, and respondents appeared less able to meet short term demand (next year) versus longer-term demand projections (5 and 10 years). This reflects the need to obtain orders with adequate lead times (can range from 3 to 30 months). Future demand will need to be met by expanding existing capacity. These expansions will require suppliers to raise capital or secure other types of support (federal loans or grants) to invest in facilities, equipment, and workforce. Individual suppliers indicated financial investments could be in the range of $\$ $100 million to $\$ $1 billion for their own facilities (depending on the type of facility). The biggest risk, according to respondents, related to general uncertainties surrounding the future nuclear industry and whether the potential demand projections will materialize into real demand that is actionable from a business perspective. Businesses do not seem willing to take investments risks without clear orders. If businesses are not able to invest to expand the supply, it will either delay the deployment of advanced nuclear technology, or the supply chain will be met by suppliers outside of the United States. This report only focuses on the domestic supply chain’s ability to meet the various projections stipulated here for the specific assessed components (vessels, heat exchangers, pumps, graphite, and sensors). The report does not cover all reactor designs or all components that may ultimately be needed for any one reactor design. It also does not address whether any specific aspect of the supply chain will be cost competitive in the global market, nor how potential state-backed entities could affect the expansion of a United States-based supply chain. The largest challenges in ramping up capacity among respondents appear to be workforce related. This includes workforce availability, experience, training, and turnover. In addition to facility investment, suppliers will also need to invest heavily in long-term workforce training to meet production goals. This issue is not nuclear-specific, and the expansion of any supply chain will likely face similar challenges. While suppliers evaluated expected normal business demand from other markets outside of nuclear, it is possible that other market segments could expand more than predicted and compete for the same suppliers. One potential market that may compete for the same supplier resources is the United States military, as many of these suppliers support both the commercial nuclear sector as well as the Navy with reactors and components. In summary, suppliers in the United States believe that there is a way to increase production in order to begin meeting the demand which will exist for advanced reactors—as long as appropriate investments can be made in the supply chain in an appropriate timeframe. Based on the capacity projections and lead times, investment will be needed to meet the 5-year and 10-year production targets. Therefore, if significant nuclear deployment is to occur in the 2030s, investment and ramp up of the advanced nuclear supply chain will need to begin in the near future for the United States to successfully deploy these advanced reactors with domestic supply chains.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Federated Access from DOE Labs to Distributed Storage in the EIC Era of Computing

The Electron Ion Collider (EIC) collaboration and future experiment is a unique scientific ecosystem within Nuclear Physics as the experiment starts right off as a crosscollaboration between Brookhaven National Lab (BNL) & Jefferson Lab (JLab). As a result, this muti-lab computing model tries at best to provide services accessible from anywhere by anyone who is part of the collaboration. While the computing model for the EIC is not finalized, it is anticipated that the computational and storage resources will be made accessible to a wide range of collaborators across the world. The use of federated ID seems to be a critical element to the strategy of providing such services, allowing seamless access to each lab site computing resources. However, providing Federated access to a Federated storage is not a trivial matter and has its share of technical challenges. In this contribution, we focus on the steps we took towards the deployment of a distributed object storage system that integrates with Amazon S3 and Federated ID. We will first cover for and explain the first stage storage solutions provided to the EIC during the detector design phase. Our initial test deployment consisted of Lustre storage using MinIO, hence providing an S3 interface. High Availability load balancers were added later to provide the initial scalability it lacked. Performance of that system will be shown. While this embryonic solution worked well, it had many limitations. Looking ahead, the Ceph object storage is considered a top-of-the-line solution in the storage community - since the Ceph Object Gateway is compatible with the Amazon S3 API out of the box, our next phase will use a native S3 storage. Our Ceph deployment will consist of erasure coded storage nodes to maximize storage potential along with multiple Ceph Object Gateways for redundant access. We will compare performance of our next stage implementations. Finally, we will present how to leverage OpenID Connect with the Ceph Object Gateway’s to enable Federated ID access. We hope this contribution will serve the community needs as we move forward with cross-lab collaborations and the need for Federated ID access to distributed compute facilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Assessment of the High Flux Isotope Reactor Cybersecurity Initiative

Recent cyber-attacks on industrial control systems, and inadvertent exposure of nuclear plant systems to cyber-exploits underscore the need for plant operators to adopt and deploy cyber-security defense solutions made for industrial control systems. Of increasing concern is the fact that international cyber hackers are beginning to target critical infrastructure, and because these more modern controls systems depend on advanced use of digital systems, they are more vulnerable than ever before to cyber-attacks. Traditional cyber defense strategies and products that have been available for decades are tailored for use on IT or corporate networks but can cause interruptions and catastrophic damage when deployed on industrial control system networks. The Department of Energy (DOE) Office of Nuclear Energy established the Gateway for Accelerated Innovation in Nuclear (GAIN) program to provide private companies pursuing innovative nuclear energy technologies with access to the technical support necessary to move toward commercialization. One of these GAIN small business vouchers was awarded to Dragos, Inc. to enable collaboration with Oak Ridge National Laboratory (ORNL) to evaluate the Dragos Platform on a production nuclear reactor test bed, hence laying the path for future commercial adoption. The vision was to provide a guide for industrial operators on implementing an industrial monitoring solution and to show how these solutions can be deployed without causing safety and reliability issues. This report documents the results of the collaboration between ORNL and Dragos, Inc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗