Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “forecast scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.

surface metering↗

Expert system terms and building tools

The characteristics of an Expert System Building Tool (ESBT) capable of inference and hypothetical reasoning are discussed. The inference capabilities of ESBTs allow such functions as classification, design-synthesis, forecasting, decision-aiding, scheduling and planning, real-time monitoring, situation assessment, the discovery of novel relations, and debugging. ESBTs are noted to have made possible order-of-magnitude improvements in expert system construction. Higher-end ESBTs are moving from LISP machines to less expensive workstations, and lower-end ones are appearing on PCs.

Gevarter, William B.↗

NASA Annual HSR Workshop: Boeing HSCT program summary

Boeing's view of the High Speed Civil Transport (HSCT) is given in viewgraph format. Boeing believes that the forecast for long range scheduled international traffic is sufficiently large in the post year 2005 time period to support a fleet of HSCT's. Technologies are projected to be available to create an HSCT that will have the required performance and operating economics, and which can be sold at a price that will provide a reasonable return to Boeing and the airlines. With relatively modest surcharges over competing subsonic fares, it is expected that an HSCT providing roughly a 50 percent time savings would capture a significant market share.

Henderson, Michael L.↗

Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

Depenbrock, Brett T.↗

Benefit Opportunities for Integrated Surface and Airspace Departure Scheduling: A Study of Operations at Charlotte-Douglas International Airport

NASA is collaborating with the FAA and aviation industry to develop and demonstrate new capabilities that integrate arrival, departure, and surface air-traffic operations. The concept relies on trajectory-based departure scheduling and collaborative decision making to reduce delays and uncertainties in taxi and climb operations. The paper describes the concept and benefit mechanisms aimed at improving flight efficiency and predictability while maintaining or improving operational throughput. The potential impact of the technology is studied and discussed through a quantitative analysis of relevant shortfalls at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport. Results from trajectory analysis indicate substantial opportunity to reduce taxi delays for both departures and arrivals by metering departures at the gate in a manner that maximizes throughput while adhering to takeoff restrictions due mostly to airspace constraints. Substantial taxi-out delay reduction is shown for flights subject to departure restrictions stemming from traffic flow management initiatives. Opportunities to improve the predictability of taxi, takeoff, and climb operations are examined and their potential impact on airline scheduling decisions and air-traffic forecasting is discussed. In addition, the potential to improve throughput with departure scheduling that maximizes use of available runway and airspace capacity is analyzed.

air traffic management↗

Software for Allocating Resources in the Deep Space Network

TIGRAS 2.0 is a computer program designed to satisfy a need for improved means for analyzing the tracking demands of interplanetary space-flight missions upon the set of ground antenna resources of the Deep Space Network (DSN) and for allocating those resources. Written in Microsoft Visual C++, TIGRAS 2.0 provides a single rich graphical analysis environment for use by diverse DSN personnel, by connecting to various data sources (relational databases or files) based on the stages of the analyses being performed. Notable among the algorithms implemented by TIGRAS 2.0 are a DSN antenna-load-forecasting algorithm and a conflict-aware DSN schedule-generating algorithm. Computers running TIGRAS 2.0 can also be connected using SOAP/XML to a Web services server that provides analysis services via the World Wide Web. TIGRAS 2.0 supports multiple windows and multiple panes in each window for users to view and use information, all in the same environment, to eliminate repeated switching among various application programs and Web pages. TIGRAS 2.0 enables the use of multiple windows for various requirements, trajectory-based time intervals during which spacecraft are viewable, ground resources, forecasts, and schedules. Each window includes a time navigation pane, a selection pane, a graphical display pane, a list pane, and a statistics pane.

Wang, Yeou-Fang↗

Applications of remote sensing to water resources

Analyses were made of selected long-term (1985 and beyond) objectives, with the intent of determining if significant data-related problems would be encountered and to develop alternative solutions to any potential problems. One long-term objective selected for analysis was Water Availability Forecasting. A brief overview was scheduled in FY-77 of the objective -- primarily a fact-finding study to allow Data Management personnel to gain adequate background information to perform subsequent data system analyses. This report, includes discussions on some of the larger problems currently encountered in water measurement, the potential users of water availability forecasts, projected demands of users, current sensing accuracies, required parameter monitoring, status of forecasting modeling, and some measurement accuracies likely to be achievable by 1980 and 1990.

Source record↗

Forecasting Lightning at Kennedy Space Center/Cape Canaveral Air Force Station, Florida

The Applied Meteorology Unit (AMU) developed a set of statistical forecast equations that provide a probability of lightning occurrence on Kennedy Space Center (KSC) I Cape Canaveral Air Force Station (CCAFS) for the day during the warm season (May September). The 45th Weather Squadron (45 WS) forecasters at CCAFS in Florida include a probability of lightning occurrence in their daily 24-hour and weekly planning forecasts, which are briefed at 1100 UTC (0700 EDT). This information is used for general scheduling of operations at CCAFS and KSC. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts for the KSC/CCAFS area during Shuttle flight operations. Much of the current lightning probability forecast at both groups is based on a subjective analysis of model and observational data. The objective tool currently available is the Neumann-Pfeffer Thunderstorm Index (NPTI, Neumann 1971), developed specifically for the KSCICCAFS area over 30 years ago. However, recent studies have shown that 1-day persistence provides a better forecast than the NPTI, indicating that the NPTI needed to be upgraded or replaced. Because they require a tool that provides a reliable estimate of the daily thunderstorm probability forecast, the 45 WS forecasters requested that the AMU develop a new lightning probability forecast tool using recent data and more sophisticated techniques now possible through more computing power than that available over 30 years ago. The equation development incorporated results from two research projects that investigated causes of lightning occurrence near KSCICCAFS and over the Florida peninsula. One proved that logistic regression outperformed the linear regression method used in NPTI, even when the same predictors were used. The other study found relationships between large scale flow regimes and spatial lightning distributions over Florida. Lightning, probabilities based on these flow regimes were used as candidate predictors in the equation development. Fifteen years (1 989-2003) of warm season data were used to develop the forecast equations. The data sources included a local network of cloud-to-ground lightning sensors called the Cloud-to-Ground Lightning Surveillance System (CGLSS), 1200 UTC Florida synoptic soundings, and the 1000 UTC CCAFS sounding. Data from CGLSS were used to determine lightning occurrence for each day. The 1200 UTC soundings were used to calculate the synoptic-scale flow regimes and the 1000 UTC soundings were used to calculate local stability parameters, which were used as candidate predictors of lightning occurrence. Five logistic regression forecast equations were created through careful selection and elimination of the candidate predictors. The resulting equations contain five to six predictors each. Results from four performance tests indicated that the equations showed an increase in skill over several standard forecasting methods, good reliability, an ability to distinguish between non-lightning and lightning days, and good accuracy measures and skill scores. Given the overall good performance the 45 WS requested that the equations be transitioned to operations and added to the current set of tools used to determine the daily lightning probability of occurrence.

Lambert, Winfred↗

Enhancing Autonomous Satellite Communication Systems with Weather-Aware Scheduling and Reconfiguration

NASA currently provides communication support to over 100 satellite missions, and the agency is driving developments in Ka-band communications and network management automation to support additional future missions. At Ka-band frequencies, rain can degrade a communication link by more than 10 dB, which may be mitigated by agile scheduling and data rate control. We present a weather forecasting module for Ka-band communications that is intended to be used in an autonomous network management service that employs machine-to-machine scheduling systems for dynamic user access opportunities. Our forecasting module (NIMBUS) runs on AWS Cloud, consumes the freely and publicly available NOAA MRMS precipitation rate dataset (1km x 1km x 2-min), produces 30-minute Nowcasts using the pySTEPS algorithm, and publishes high level ground station specific link quality predictions. We evaluate two potential NIMBUS outputs, a binary classifier that predicts rain attenuation greater than 3 dB and a rain attenuation estimator, and we backtest these outputs using one year of power measurement data collected from observations of the geostationary ANIK F2 satellite’s Ka-band beacon. We report, with a 30-minute lead time, a binary classifier accuracy of 84% and an estimator RMSE of 1.67 dB. Additionally, we discuss how the NIMBUS module could be incorporated into a user-initiated service framework to enable weather-aware scheduling and reconfiguration. Operating a static link budget with minimal link margin can increase network operation costs by creating additional scheduling tasks due to failed packets, which may require human intervention and/or lead to inefficient asset utilization. The proposed system aims to increase throughput by reducing link margin, while mitigating increases in network operations costs by leveraging autonomous machine-to-machine scheduling, shortened prediction lead times, and advances in precipitation Nowcasting.

satellite communications↗

Cost/benefit tradeoffs for reducing the energy consumption of the commercial air transportation system. Volume 2: Market and economic analyses

The impact of the most promising fuel conserving options on fuel consumption, passenger demand, operating costs, and airline profits when implemented into the U.S. domestic and international airline fleets is assessed. The potential fuel savings achievable in the U.S. scheduled air transportation system over the forecast period, 1973-1990, are estimated.

Vanabkoude, J. C.↗

Collaborative Resource Allocation

Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.

Wang, Yeou-Fang↗

Re-scheduling as a tool for the power management on board a spacecraft

The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

Albasheer, Omar↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Optimizing Mars Airplane Trajectory with the Application Navigation System

Planning complex missions requires a number of programs to be executed in concert. The Application Navigation System (ANS), developed in the NAS Division, can execute many interdependent programs in a distributed environment. We show that the ANS simplifies user effort and reduces time in optimization of the trajectory of a martian airplane. We use a software package, Cart3D, to evaluate trajectories and a shortest path algorithm to determine the optimal trajectory. ANS employs the GridScape to represent the dynamic state of the available computer resources. Then, ANS uses a scheduler to dynamically assign ready task to machine resources and the GridScape for tracking available resources and forecasting completion time of running tasks. We demonstrate system capability to schedule and run the trajectory optimization application with efficiency exceeding 60% on 64 processors.

Frumkin, Michael↗

Study of the impact of cruise speed on scheduling and productivity of commercial transport aircraft

A comparison is made between airplane productivity and utilization levels derived from commercial airline type schedules which were developed for two subsonic and four supersonic cruise speed aircraft. The cruise speed component is the only difference between the schedules which are based on 1995 passenger demand forecasts. Productivity-to-speed relationships were determined for the three discrete route systems: North Atlantic, Trans-Pacific, and North-South America. Selected combinations of these route systems were also studied. Other areas affecting the productivity-to-speed relationship such as aircraft design range and scheduled turn time were examined.

Bond, E. Q.↗

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network↗

Further studies of methods for reducing community noise around airports

A simplified method of analysis was used in which all flights at a 'simulated' airport were assumed to operate from one runway in a single direction. For this simulated airport, contours of noise exposure forecast were obtained and evaluated. A flight schedule of the simulated airport which is representative of the 23 major U. S. airports was used. The effect of banning night-time operations by four-engine, narrow-body aircraft in combination with other noise reduction options was studied. The reductions in noise which would occur of two- and three-engine, narrow-body aircraft equipped with a refanned engine was examined. A detailed comparison of the effects of engine cutback on takeoff versus the effects of retrofitting quiet nacelles for narrow-body aircraft was also examined. A method of presenting the effects of various noise reduction options was treated.

Petersen, R. H.↗