Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

23 records · Page 2

Technical, economic, and load-following capabilities assessment of grid-connected geothermal and geothermal-solar hybrid systems

The technical and economic performance as well as the load-following capabilities of grid-connected geothermal hybrid systems were assessed in this work. The analyzed geothermal hybrid configuration is composed of a binary geothermal plant integrated with a concentrating solar-thermal system and underground thermal energy storage (UTES) through a primary heat exchanger. Physics-based models for the hybrid system for plant generation capacities of 1, 25, and 50 MW were developed from validated models for each subsystem. Also, an economic model was developed that accounts for different hybrid system capabilities, solar field sizes, and thermal storage duration. The advantage of the geothermal hybrid system was assessed by comparing the performance with the baseline benchmark geothermal plant with a similar configuration and generation capacity. It was found that hybridizing geothermal plants with concentrating solar and thermal energy storage not only improves the thermal efficiency by up to 8 percentage points when additional heat from the solar-UTES loop rises the evaporator temperatures from 70 to 125 °C, but also enhances the load-following capability for the geothermal plant, which can meet a typical residential load profile with a power rate of change 0.25 kW/s with an absolute error under 13 kW for a 1 MW plant. Other benefits of hybridization include resource preservation and a potential LCOE reduction of up to 56% for a 50 MW geothermal hybrid plant having a 50% solar share, a 1.4 solar multiple, and 24-h storage capacity. The results presented in this work demonstrate that hybridizing geothermal systems transforms them into a flexible and cost-effective solution for addressing the dynamic requirements of modern electric grids.

15 GEOTHERMAL ENERGY↗

The value of integrating a geothermal district heating system into a microgrid

As electrical grids increasingly rely on variable renewable energy, maintaining reliability and cost efficiency becomes more complex. To address these challenges, this study analyzed the integration of geothermal district heating as a grid-responsive thermal resource within a microgrid in Tuttle, Oklahoma. Building energy modeling using EnergyPlus estimated annual district heating demand at 2.9 GWh, with a peak load of 2.8 MW th . Techno-economic analyses were conducted to meet the heating demand under three geothermal scenarios, varying by production depth, flow rate, and thermal output, each supplemented by natural gas peaking boilers. In parallel, equivalent electrical load profiles were developed using typical coefficients of performance (COPs) for air-source heat pumps and electric boilers to establish an electrified baseline scenario. A complete end-use electrical load profile was also developed for the microgrid using Cambium dataset. The modeling results demonstrated reliable and economic operation of the geothermal systems over 30 years, with COPs ranging from 2.6 to 8.9 and the lowest levelized heating cost at $\$$54.6/MWh. Geothermal integration reduced electricity consumption by up to 94.7 % compared to the non-geothermal base case, yielding annual energy savings of up to $\$$803 k. Avoided grid costs ranged from $\$$65 k–$\$$147 k per year, with individual events avoiding up to $\$$4,863 per hour. Grid-responsive operation further reduced wholesale energy costs by 53–56 %. These findings demonstrate geothermal heating, traditionally treated as a non-grid-responsive thermal resource, can be reconfigured to support dynamic grid services, offering a scalable pathway to enhance reliability and reduce costs in renewable-rich microgrids and district heating networks.

15 GEOTHERMAL ENERGY↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗

Linear and Nonlinear Solvers for Simulating Multiphase Flow within Large-Scale Engineered Subsurface Systems

Simulation of multiphase flow in the subsurface is well-known to be computationally challenging. While there have been many studies that have explored approaches to overcoming these challenges, they often utilize relatively simple case studies. In this paper, we focus on the unique numerical challenges posed by modeling large-scale engineered subsurface systems, characterized by discrete features embedded in a heterogeneous natural subsurface setting. The man-made features such as shafts, tunnels, and barriers often cause multiple challenges in modeling the domain for multiphase porous media flow. This flow scenario can have a wide range of applications such as nuclear waste repositories, enhanced recovery of a petroleum reservoir, geothermal engineering, and carbon sequestration. An example of these severe numerical challenges is the case of performance assessment (PA) for Waste Isolation Pilot Plant (WIPP), the only operating deep geological repository in the US, which simulates extreme material properties of bedded salt rock formation and extreme contrast due to open excavation next to the formation. The models have extremes not only of permeability and porosity but also of the constitutive models needed for multiphase flow; additionally, they have process models like salt creep closure reducing porosity over time, fracturing in clay and anhydrite interbeds of the bedded salt, gas generation from the waste materials, and unintentional human borehole intrusions in some scenarios. Numerical simulations require the solution of coupled systems of nonlinear PDEs; in our work, we use the open-source simulator PFLOTRAN which is based on Finite Volume discretization. The solution of the nonlinear equations requires use of the Newton-Raphson iteration at each time step, which entails the solution of the linearized Jacobian system at each iteration. The effects of all the processes (i.e., large number of unknowns, highly nonlinear constitutive relations, large contrasts in material properties in short distances) lead to an ill-conditioned Jacobian matrix that severely challenges traditional linear solver, i.e., stabilized biconjugate gradient with block Jacobi incomplete LU preconditioner (BCGS-ILU) leading to non-convergence for traditional Newton-Raphson nonlinear solver causing unacceptably long computation time for each model. This paper presents linear solvers such as constrained pressure residual (CPR) two-stage preconditioner with alternate-block-factorization (ABF) and quasi- implicit pressure and explicit saturation (QIMPES) decouplers and flexible generalized residual solver (FGMRES). The new general-purpose nonlinear solver, Newton trust-region dogleg Cauchy (NTRDC), is also introduced to resolve extreme nonlinearities in the models. We demonstrate the effectiveness of each method relative to the default BCGS-Newton solver. The two best cases had nearly 50 times speed-up and achieved completion of a simulation in 14 hours that never completed due to non-convergence with the default solver. We also investigate the strong scalability of each method and discuss some of the deficiencies found for Block Jacobi preconditioner using parallel domain decomposition, and node packing effects of modern processor architecture.

Preconditioner, Nonlinear, Porous media, Multiphas↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗