DOE OSTI2020
In November 2015, tetrachloroethylene (PCE) was discovered in groundwater samples collected from a Westbay{sup R} multi-level groundwater monitoring well at the Idaho National Laboratory (INL).a Subsequent investigation determined that PCE was not present in the groundwater. The detected PCE was instead due to inadvertent contamination of the internal tubing fluid in the Westbay well-monitoring system, which is isolated from the surrounding groundwater. Further investigation showed that three of the 11 Westbay wells at the INL contained PCE-contaminated tubing fluid at concentrations above the U.S. Environmental Protection Agency's maximum contaminant level for drinking water (5 μg/L). Loose sediment at the bottom of some Westbay wells was also found to contain PCE; the three wells were then identified for rehabilitation as part of the INL well maintenance program. The unique construction of the Westbay wells - i.e., the small diameter (5.72 cm [2.25 in.]) and the depths of the tubing fluid ranging from 144.8 to 419 m (475 to 1,376 ft) below ground surface - posed unique challenges to the rehabilitation. Because the tubing fluid provides structural integrity, the fluid cannot be removed and then replaced without damaging the integrity of the Westbay well. Additionally, the small diameter of the systems and the associated depths limit the availability of equipment that can be used for the rehabilitation. After an evaluation of potential methods, it was determined that the use of an in-well, custom-fabricated, granular-activated-carbon filtration swab deployed via a wire line would provide the safest and most cost-effective method for rehabilitation. Westbay well rehabilitation started at well MIDDLE-2051 in late June 2018 and paused in December 2018 for the season. The PCE concentration in the tubing fluid at MIDDLE-2051 was initially reduced to a maximum concentration of 3.81 μg/L from a maximum of 642 μg/L, while the concentration of PCE in the sediment had been reduced from 5,360 to 2,270 μg/kg. Sampling was performed at MIDDLE-2051 again in August 2019, and the tubing fluid increased to a maximum concentration of 45.4 μg/L, while the concentration in the sediment decreased further to 1,890 μg/kg due to desorption of PCE from the sediment to the tubing fluid. Rehabilitation resumed at well MIDDLE-2050A in late August 2019, and the PCE concentration in the tubing fluid had been reduced to a maximum concentration of 19.0 μg/L. Although the method has been shown to be time-consuming, it has proven to be effective and safe for personnel performing the work and to the integrity of the well. Future sample data results at all wells will help determine an estimated completion of the rehabilitation. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗