Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “femp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

Battery Energy Storage System Evaluation Method

This report describes development of an effort to assess Battery Energy Storage System (BESS) performance that the US DOE Federal Energy Management Program (FEMP) and others can employ to evaluate performance of deployed BESS or solar photovoltaic (PV) +BESS systems. The proposed method is based on actual battery charge and discharge metered data to be collected from BESS systems provided by federal agencies participating in the FEMP's performance assessment initiatives. Long-term (e.g., at least one year) time series (e.g., hourly) charge and discharge data are analyzed to provide approximate estimates of key performance indicators (KPIs).

25 ENERGY STORAGE↗

Best Practices for Renewable Energy Installations in the National Parks

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) and National Park Service (NPS) have partnered to support the development and utilization of renewable energy technology at federal facilities and on federal lands. FEMP provides technical support to NPS on renewable energy projects to identify and generate significant cost savings and efficiency benefits, investigate opportunities to reduce carbon footprint and/or achieve carbon neutrality, and improve resilience to NPS-owned facilities and sites. The purpose of this report is to support NPS staff as they evaluate whether and how to use renewable energy technologies in park operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Ground Source Heat Pump ECMs: Implemented Under DOE ESPC IDIQ Contract

Several federal performance and decarbonization objectives are driving the U.S. government to transition to net-zero emissions across the federal building portfolio. The overarching purpose of this Federal Energy Management Program (FEMP)-Geothermal Technologies Office (GTO) work is to support federal facilities in accomplishing the administration’s federal building decarbonization goals. Creating awareness of existing geothermal (or ground-source) heat pump (GHP) systems deployed on federal property, implemented using performance contracts and evaluating the energy and environmental impacts of these systems, this work will assist federal facilities in considering inclusion of GHP technology energy conservation measures (ECMs) in future performance contracting project awards. This report summarizes analyses of data from GHP ECMs installed under the DOE ESPC IDIQ contract across various climate areas and geographic locations, agencies, and building use types. Through the analysis of proposed GHP ECMs and understanding key metrics on implemented GHP systems in a variety of applications, FEMP and GTO can further support federal agencies in meeting decarbonization and net-zero building goals by evaluating and incorporating GHP systems into performance contracts and communicate the benefits of this technology.

15 GEOTHERMAL ENERGY↗

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supporting Electric Vehicle Supply Equipment Deployment

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies electrify their fleets and support the deployment of charging infrastructure. To assist agencies with the transition to zero-emission vehicles (ZEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through on-site and virtual EVSE Tiger Teams.

ADVANCED PROPULSION SYSTEMS↗

Federal Energy Savings Performance Contracts Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et. seq.

The U.S. Department of Energy's Federal Energy Management Program (FEMP) is issuing this document to provide clarifications and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. This document is intended to supplement FEMP's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contracting (ESPC) projects.

42 U.S.C. § 8287 et. seq.↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers’ design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program’s future, this question arises “How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness?” This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program’s past and future.

Payne, CT↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Guidance and Recommendations for Streamlining Reporting for Federal Energy and Water Efficiency Projects

Federal agencies are required to report on their progress in meeting various energy and water management requirements. These reporting requirements encompass energy and water projects at federal facilities, including projects that are alternatively financed, e.g., conducted through energy savings performance contracts (ESPCs) or utility energy service contracts (UESCs). The purpose of this guidance is to provide recommendations to streamline federal agency reporting. The guidance recommends the use of eProject Builder (ePB), a project development and archiving tool for energy projects. ePB carries additional value in its simplification of federal agency reporting by dovetailing with the Federal Energy Management Program’s (FEMP’s) EISA 432 Compliance Tracking System (CTS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Energy Management Program

The Federal Energy Management Program (FEMP) helps federal agencies manage their building and fleet energy use by providing training, tools, technical assistance, and funding.

DOE↗

Integrating Health and Energy Efficiency in Multi-Family Buildings

The intersection between health and the built environment has long been known. Since the 18 th century, public health officials have been targeting building issues, such as crowding, poor sanitation, and inadequate ventilation in efforts to reduce infectious diseases and fire hazards. More recently, federal agencies, such as the U.S. Environmental Protection Agency (EPA), the Centers for Disease Control and Prevention, HUD, and the DOE have been working to reduce or eliminate indoor building factors that are known to have adverse health impacts on Americans, including reducing lead in housing and indoor air pollution that causes respiratory disease, and ensuring access to adequate heating, cooling, and moisture control. PNNL, in support of FEMP’s HBI, undertook a review of literature and existing best practices to identify current activities and research on the intersection between traditional energy-efficiency measures and occupant health within multi-family buildings. While the HBI methodology has focused on traditional office building spaces, it is now expanding into additional building use types. This overview explores some of the most impactful resources to help property owners and managers understand more about multi-family residential buildings that are both healthy and energy efficient. The federal government provides direct oversight and operation across several types of multi-family residential housing, including dormitories, barracks, and senior community living centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Golden Gate National Recreation Area Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Golden Gate National Recreation Area, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Yellowstone National Park Federal Fleet Tiger Team EVSE Site Assessment [Slides]

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for Yellowstone National Park, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sandia's Liquid-Cooled Data Center Boosts Efficiency and Resiliency

The Federal Energy Management Program (FEMP) encourages federal agencies and organizations to improve data center energy efficiency, which can offer tremendous opportunities for energy and cost savings. In this success story, a novel liquid cooling system provides reliable, resilient, and energy-efficient cooling for high-performance computing (HPC) systems at Sandia National Laboratories.

data center↗

Best Practices for Energy Management Information Systems Metadata Schemas

The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of Energy Management Information Systems (EMIS) at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. The use of standard naming conventions and a metadata schema, which may be referred to as 'data tags,' improves the ability of the EMIS to consistently analyze, visualize, and derive value from operational data. To help address these issues, this fact sheet highlights best practices for use of metadata in an EMIS stack, which can significantly reduce the initial time required to deploy an EMIS.

EMIS↗