Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “federal procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Federal Water Management Planning Manual

This Federal Water Management Resource Guide provides direction to Federal agencies on how optimize water use at Federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water. It provides best practices for managing water to be considered when developing or improving an effective facility water management program. PNNL developed this guide for the Federal Energy Management Program (FEMP). FEMP was directed by the Council on Environmental Quality (CEQ) to develop a Federal Water Management Resource Guide per the Implementing Instructions for Executive Order (E.O.) 13834, Efficient Federal Operations. This document serves to satisfy this requirement in order to provide best water management practices within the Federal Government.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers’ design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program’s future, this question arises “How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness?” This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program’s past and future.

Payne, CT↗

Federal Water Management Planning Manual

FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Procurement Analysis Tool (PAT)

This a poster on PAT for the CESA National Energy Summit for States: Navigating Energy Trends and Federal Programs Conference.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Management Information Systems Technical Resources Report

This report illustrates how energy management information systems (EMIS) can enable federal agencies to improve energy performance, reduce costs, and meet energy goals. The guide discusses how to identify and implement needed EMIS functions and capabilities, covering the entire EMIS life cycle including system design, procurement, implementation, and ongoing maintenance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2021 Site Sustainability Plan

The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) Fiscal Year 2021 Site Sustainability Plan details the laboratory's current performance status relative federal mandates and goals pertaining to water, waste, fleet, and energy management; clean and renewable energy; green buildings; acquisition and procurement; measures, funding, and training; electronic stewardship; and organizational resilience. It also provides a road map for future site planning and development that support NREL's commitment to business operations that 1) demonstrate the incorporation of clean energy practices and 2) promote the development of a sustainable and resilient campus while growing greater technological capabilities to advance the national renewable energy marketplace.

ENERGY PLANNING, POLICY, AND ECONOMY↗

American Made Infrastructure: Evolution of Federal Incentives and Requirements

Foreign Entity of Concern (FEOC) restrictions in the One Big Beautiful Bill Act (OBBB) represent the latest evolution of a multi-year legislative trajectory responding to national security concerns about foreign control – and particularly FEOC control – of energy infrastructure. Beginning with Executive Order 14017 (February 2021), which initiated comprehensive federal review of critical supply chain vulnerabilities in semiconductors, battery energy storage systems, and critical minerals, policymakers have progressively expanded restrictions on foreign participation. The National Defense Authorization Act (NDAA) 2019 established precedent for component-level prohibitions on foreign information and communications technology procurement, while NDAA 2024 extended these restrictions to six major People’s Republic of China (PRC) battery manufacturers. Complementary measures such as the Build America, Buy America (BABA) Act and the Infrastructure Investment and Jobs Act (IIJA) introduced domestic content thresholds and FEOC eligibility criteria for federal funding programs. The Inflation Reduction Act (IRA) 2022 further operationalized FEOC restrictions through electric vehicle tax credit requirements, creating a scalable framework for excluding foreign-controlled components. Recent executive actions and state-level policies have reinforced this trajectory, reflecting sustained alignment across federal and state governments. Collectively, these developments demonstrate a bipartisan policy approach that pairs incentives for advanced energy deployment with safeguards designed to prevent subsidizing adversaries or entities that present foreign-sourcing risk.

99 - GENERAL AND MISCELLANEOUS↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparative life cycle assessment of remote potable water supply for the Department of Defense

The Department of Defense (DOD) and other agencies, including relief organizations, require potable water for remote missions around the globe. As part of recent initiative by the U.S. Federal government through Executive Order 14057, the DOD has been instructed to investigate the sustainability of operations and practices within the context of climate change. One such practice that needs to be addressed is the procurement of potable water, an essential requirement of any remote mission or location. Currently, there are three primary means of procuring potable water at remote locations: bottled water, on-site purification, or tie-in to existing, local infrastructure. The first two operations are often considered the most secure options, but have sustainability concerns. The purpose of this study is to compare the environmental impacts of bottled water procurement versus on-site treatment via a mobile Reverse Osmosis Water Purification Unit (ROWPU), which uses multiple levels of filtration to make potable water from a local source. A cradle-to-gate assessment was developed for both systems to compare different options for potable water supply. An in person inventory was paired with data taken from the Ecoinvent 3.8 database to directly compare the two systems. The two systems are compared on a 5-year timeline to analyze the environmental impact of repeated bottled water transport versus diesel generator-fueled on-site treatment. Across all impact categories, the results indicate that high energy costs of the reverse osmosis process have significantly less impact on the environment than the repetitive transport and procurement of bottled water. The results of the study have important implications for advancing sustainable operations for remote communities or temporary settlements.

54 ENVIRONMENTAL SCIENCES↗

Advancing Federal Infrastructure Through Innovation: Selecting Electric Vehicle Charging Infrastructure Wisely

The Biden Administration's issuance of Executive Orders directly addressing and accelerating Federal fleet electrification places an onus on both fleet and facility managers. This panel will help fleet and facility personnel understand how to select EVSE infrastructure in terms of implementation, energy management, and costs of procurement, installation/deployment, and electricity. The panel will cover technology aspects to include managed EVSE, bi-directional charging, implications on local electrical systems and storage needs in certain cases to buffer power demand. Discussion will include various considerations relevant to ensuring adequate EVSE, balancing infrastructure needs, and upgrades with fleet needs. The panelists will discuss how to provide sufficient infrastructure support, including which stakeholders to involve, procurement impediments, easement locations, and requirements that arise during the design and implementation process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Establishment of an Intertribal Technical Energy Providers Network (Final Technical Report)

The Midwest Tribal Energy Resources Association (MTERA) embarked on a 5-year (extended to 7-year) initiative aimed at advancing Tribal energy resilience and sustainability through intertribal collaboration. By bringing together Tribes in Minnesota, Wisconsin, and Michigan (EPA Region 5 Tribes), the project's scope encompassed organizational growth, governance and management formalization and enhancement, and the planning and deployment of energy-related services to Member Tribes. MTERA strategically pursued four key objectives to fulfill its mission: 1. Clearinghouse Development: Creation of a centralized hub offering valuable information, education, and outreach for Tribal communities and their neighbors. 2. Policy Liaison: Serving as a vital link between federal and state agencies to contribute to the formulation of inclusive energy policies that ensure both Tribal and regional energy success. 3. Energy Planning and Research: Providing essential support for energy planning, researching financing opportunities, and exploring effective procurement strategies. 4. Training Support: Facilitating training and apprenticeship initiatives to empower the Tribal workforce and enhance community capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗