Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “facility safety assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Quantitative Risk Assessment for Fuel Cell Electric Bus Hydrogen Storage and Refueling Facility

It is necessary to understand the safety implications and risk mitigation options for fuel cell electric bus fleet deployment, especially for related facilities responsible for operations such as production, storage, compression, and dispensing of hydrogen for use by the buses. In this report, we present a quantitative risk assessment for a potential fuel cell electric bus fleet that was motivated by efforts to improve resilience at the Portland International Airport but can be applicable to a range of hydrogen case studies and use cases. We estimated risk for a facility that produces, stores, compresses, and dispenses hydrogen for the fleet of buses, with a focus on individual risk to people in terms of annual frequency of fatality. We considered the frequency of hydrogen leaks that could result in harmful physical outcomes like jet fires or explosions, and the consequences of those outcomes for people. We created customized fault trees to calculate the frequencies of different sizes of leaks and event sequence diagrams to calculate ignition probabilities for the various leak sizes. We also leveraged the HyRAM+ toolkit to use these inputs to calculate overall risk for the facility, which we separated into one section responsible for producing, storing, and compressing hydrogen, and one section responsible for dispensing the hydrogen to the buses. We found that the dispensing area seemed to have a higher risk than the production/storage/compression area of the facility, largely because of the inclusion of a component with a high leak frequency (the heat exchanger used to cool the hydrogen before entering the vehicle, to prevent overheating and expansion of hydrogen in the onboard tank). For the example production and refueling facility we evaluated and the data we used for the analysis, the leak frequency had a larger impact on the risk differences between the two sections on the facility, compared to the physical outcome consequence, which was slightly different due to the varying fuel conditions, but not substantially different. Actions can be taken to prevent these hazards (e.g., lowering leak frequencies in system components) or to mitigate the consequences if they do occur (e.g., installing barriers to protect people if ignition events occur). The choice of which actions to take depends not only on safety considerations but also on space, time, staffing, feasibility, and financial constraints. Therefore, the quantitative risk assessment approach can help understand relative risk contributions from different components, leak sizes, consequences, and human actions, to prioritize risk reduction strategies and balance these parameters. The outcomes of this report may be useful for a variety of stakeholders working in the hydrogen, transportation, vehicle, and aviation sector, including those responsible for aspects like facility design, operations, and regulations. There is not a single value of risk that determines whether a hypothetical system is “safe” or not. The insights about risk mitigations may be leveraged, and the quantitative risk assessment approach can be applied to other case studies to understand risk priorities and contributions specific to different FCEB and hydrogen facility uses.

08 HYDROGEN↗

Integral and Separate Effects Test Facilities To Support Water Cooled Small Modular Reactors: A Review

This study reviews previous experimental facilities and test programs relevant to water-cooled reactor system design and analysis to meet regulatory compliances. This study aims to find the best solution for designing the required experiments, obtaining necessary test data, and verifying the developed computer code/models to support the new reactor design and development while minimizing cost and time while leveraging experiences from previous facilities to minimize. Nuclear reactor licensing requires supportive design, analysis, and experimental results to ensure the safety of the full-scale prototype reactor in regular operation, as well as during postulated accident scenarios. These reactor design analyses are generally performed using system codes and other associated simulation tools that require assessment, verification and validation using an appropriate experimental dataset. Experimental facilities used for reactor system safety analysis and system code assessments are categorized into integral effects test (IET) and separate effects test (SET) facilities. Further, these IET and SET experiments and studies use geometrically scaled systems to reproduce the prototype system behavior at a reasonable cost, albeit with some scaling-related distortions. The design challenge of these model facilities is to identify and minimize scaling distortions while reproducing the most important operational phenomena in steady-state operation and in postulated accident scenarios. Lessons learned from previous experimental facilities, models, and correlations can support the development of new multipurpose, scaled, hybrid, integrated, and modular experimental facilities for advanced light water-cooled small modular reactors (SMRs). Successful operation of these facilities can significantly reduce upfront reactor development and demonstration costs and time to deployment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Alternative Conceptual Model for the Spent Nuclear Fuel–Water Interaction in Deep Geologic Disposal Conditions

For the long-term safety assessment of direct disposal of spent nuclear fuel in deep geologic repositories, knowledge on the radionuclide release rate from the UO 2 matrix is essential. This work provides a conceptual model to explain the results of leaching experiments involving used nuclear fuel or simulant materials in confirmed reducing conditions. Key elements of this model are: direct effect of radiation from radiolytic species (including defects and excited states) in the solid and in the first water layers in contact with its surface; and excess H 2 may be produced due to processes occurring at the surface of the spent fuel and in confined water volumes, which may also play a role in keeping the spent fuel surface in a reduced state. The implication is that the fractional radionuclide release rate used in most long-term safety assessments (10 -7 year -1 ) is over estimated because it assumes that there is net UO 2 oxidation caused by radiolysis, in contrast with the alternative conceptual model presented here. Furthermore, conventional water radiolysis models and radiation chemical yields published in the literature are not directly applicable to a heterogeneous system such as the spent fuel–water interface. Suggestions are provided for future work to develop more reliable models for the long-term safety assessment of spent nuclear fuel disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗

Fusion Energy Research at Idaho National Laboratory: Experimentation and Simulation to Support Safety and Rapid Technology Development

Research into fusion energy is growing rapidly, responding to a call for sustainable sources of energy to replace fossil fuels and mitigate climate change. Within the United States, at least, researchers are also responding to the “Bold Decadal Vision” proposed by the White House, seeking to have a commercially relevant fusion pilot plant deployed within a decade. Before this can become a reality, many Fusion Science & Technology (FS&T) gaps remain. For over 45 years, Idaho National Laboratory has been at the forefront of addressing these FS&T gaps in the context of fusion safety and technology via the operation of world-leading experimental facilities within the Safety and Tritium Applied Research (STAR) Facility. Here, INL focuses on the tritium fuel cycle, conceptual system design studies, risk assessment, waste management, and materials safety. Modeling and Simulation (M&S) has also been a component of this portfolio of research, but, early on, focused on individual systems. Since 2019, active development and research on integrated whole device modeling tools based on the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework has been undertaken. This has culminated in a MOOSE-based version of the Tritium Migration and Analysis Program (TMAP), an INL code historically focused on tritium permeation and trapping within fusion systems. More recently, INL Laboratory Directed Research and Development funds have been used to create the Fusion ENergy Integrated multiphys-X (FENIX) code focused on scrape-off layer plasma physics and the first wall of a magnetically confined fusion device. This talk will focus on an overview of INL activities in the FS&T research area, with a particular focus on recent M&S activities and results.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

MELCOR

MELCOR is a fully integrated, engineering-level computer code for modeling the progression of severe accidents in light water reactors (LWR) at nuclear power plants and nuclear fuel cycle facilities. Originally developed to assess severe accidents following Three Mile Island, MELCOR’s flexible modeling framework has enabled it to be applied to safety assessments of a much broader range of nuclear power reactor designs and other types of nuclear facilities processing radioactive material. Further, MELCOR can model a broad spectrum of severe accident phenomena such as thermal-hydraulic response in a reactor coolant system; core heat-up, degradation, and relocation; and transport behavior in both boiling water and pressurized water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Reliability of Digital Communications in Nuclear Facilities and Operations

A comprehensive evaluation of methods to compare the reliability of wired and wireless digital communication networks for use in nuclear power plants. The study underscores the critical role of communication reliability in ensuring operational safety in nuclear power plants. Key objectives include developing a methodology to assess communication technologies’ reliability, particularly for comparing wireless and wired networks, for nuclear facility applications. The framework focuses on technology-agnostic evaluations and emphasizes the importance of reliability metrics spanning safety, security, and monitoring functions. The framework emphasizes that the key performance indicators are application dependent and provides a hierarchy of different network types that will have different reliability requirements. The report considers both existing plants and advanced reactors, including small modular reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Radiological Dose Consequence Modeling Parameters for Reactor and Nonreactor Nuclear Facilities

To assure consistency between DOE and NRC safety basis requirements this ECAR documents the DOE basis requirements for dose consequence assessments in accordance with Standard DOE-STD-3009-2014. The methodology in this ECAR outlines parameters for evaluating airborne radiological releases and provides a consistent basis for assessing current and future DOE NE facilities.

73 - NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Performance Assessment for the E-Area Low-Level Radioactive Waste Disposal Facility at the Savannah River Site: Chapter 3

This chapter summarizes safety functions and features, events, and processes; conceptual models which apply to all DUs; property data packages; and modeling tools developed and implemented in this PA to analyze ELLWF performance. Conceptual models of GW flow and transport in the VZ, which are specific to type of DU, are presented in Chapter 4.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing the Impact of Large Removable Beryllium Reflector Experiments on HFIR Performance and Safety Metrics

This study investigated the effect of various removable beryllium (RB) experiment configurations on High Flux Isotope Reactor (HFIR) metrics to address increasing interest in these facilities for materials and fuels irradiation research. The RB reflector contains eight large and four small irradiation experiment facilities that offer excellent neutron flux conditions to perform fission and fusion reactor materials and fuels irradiation research. This work aims to outline acceptable RB configurations based on safety, performance, and programmatic metrics. This study assessed experiment effects on reactivity, cycle length, fission rate density distributions, and neutron flux distributions using the Shift, HFIRCON, and SCALE ORIGEN codes. Initial evaluations focused on generic experiment materials including aluminum plugs, stainless steel plugs, molybdenum plugs, and aluminum plugs with gadolinium shields. Subsequent analyses of MiniFuel experiments were performed to evaluate a heterogenous experiment, consisting of a more complex geometry and bearing several materials, and to test the correlations developed with the generic materials on a real experiment. Furthermore, the effects of neutron poison concentrations in the standard beryllium plugs were evaluated. When assuming a reference RB configuration with eight large fresh beryllium plugs, perturbed configurations with three aluminum plugs, one stainless steel plug, one molybdenum plug, one gadolinium-shielded aluminum plug, and one MiniFuel experiment resulted in a cycle length reduction of less than 1.3 days, the current threshold before requiring additional approvals. Configurations with five aluminum plugs, one stainless steel plug, one molybdenum plug, one gadolinium-shielded aluminum plug, and two MiniFuel experiments meet the 1.3 day limit if irradiated beryllium plugs are considered. Fuel element fission rate density distributions remained within safety limits, with maximum local increases under 9%. Neutron flux calculations revealed large thermal flux depressions inside and around the perturbed RB facilities, while epithermal and fast neutron fluxes increased because of reduced neutron moderation by the perturbed materials. These findings provide valuable guidance for optimizing RB configurations to balance safety and performance at HFIR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

Tritium Fires: Simulation and Safety Assessment

This is the Sandia report from a joint NSRD project between Sandia National Labs and Savannah River National Labs. The project involved development of simulation tools and data intended to be useful for tritium operations safety assessment. Tritium is a synthetic isotope of hydrogen that has a limited lifetime, and it is found at many tritium facilities in the form of elemental gas (T 2 ). The most serious risk of reasonable probability in an accident scenario is when the tritium is released and reacts with oxygen to form a water molecule, which is subsequently absorbed into the human body. This tritium oxide is more readily absorbed by the body and therefore represents a limiting factor for safety analysis. The abnormal condition of a fire may result in conversion of the safer T 2 inventory to the more hazardous oxidized form. It is this risk that tends to govern the safety protocols. Tritium fire datasets do not exist, so prescriptive safety guidance is largely conservative and reliant on means other than testing to formulate guidelines. This can have a consequence in terms of expensive and/or unnecessary mitigation design, handling protocols, and operational activities. This issue can be addressed through added studies on the behavior of tritium under representative conditions. Due to the hazards associated with the tests, this is being approached mainly from a modeling and simulation standpoint and surrogate testing. This study largely establishes the capability to generate simulation predictions with sufficiently credible characteristics to be accepted for safety guidelines as a surrogate for actual data through a variety of testing and modeling activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗