Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “facility safety assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Building on the Past - Looking to the Future. Part 2: A Focus on Expanding Horizons

The history of space endeavors stretches far from the first liquid-fueled rocket created by the father of modern rocketry, Robert Goddard, in 1926 and will certainly extend far beyond the construction of the International Space Station (ISS) scheduled to be complete with the addition of the Permanent Multipurpose Module on STS-133/ULF5. National Aeronautics and Space Administration (NASA) and the ISS International Partners (IPs) will be the unrelenting venue used to satisfy the curiosities of man as we seek an understanding of space through various experiments (also referred to as payloads) conducted in microgravity. The NASA Payload Safety Review Panel (PSRP) continues to serve as the lead for the review and assessment of payload hardware to assure facility and crew safety. This is the second in a series of papers and presentations that illustrate challenges and lessons learned in the areas of communication, safety requirements, and processes which have been vital to the PSRP.

Nash, Sally K.↗

Integration of Safety, Security, and Safeguards During Design and Operations: A Technical Assessment and Regulatory Considerations for Advanced Reactor and Advanced Fuel Fabrication Facilities

This report presents the current state of knowledge, technology, methodologies, and tools that could be implemented to realize the robust integration of safety, security, and safeguards (3S) for advanced nuclear reactors (ARs) and advanced nuclear fuel cycle facilities. This report was motivated by the global development of ARs which are expected to play a key role in meeting domestic energy and climate objectives. Domestically, with many ARs in the early design phase, the integration of 3S provides an opportunity to achieve risk reduction while using less resources than traditional light water reactors by leveraging interdependencies and synergies between each domain. In addition, domestic policy considerations encourage the convergence of each 3S domain through facility design and operations. Therefore, there is a need to better understand the interdependencies and integration between 3S across ARs and advanced reactor fuel cycle facilities’ lifecycles including design, construction, and operational phases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantitative Risk Assessment for Fuel Cell Electric Bus Hydrogen Storage and Refueling Facility

It is necessary to understand the safety implications and risk mitigation options for fuel cell electric bus fleet deployment, especially for related facilities responsible for operations such as production, storage, compression, and dispensing of hydrogen for use by the buses. In this report, we present a quantitative risk assessment for a potential fuel cell electric bus fleet that was motivated by efforts to improve resilience at the Portland International Airport but can be applicable to a range of hydrogen case studies and use cases. We estimated risk for a facility that produces, stores, compresses, and dispenses hydrogen for the fleet of buses, with a focus on individual risk to people in terms of annual frequency of fatality. We considered the frequency of hydrogen leaks that could result in harmful physical outcomes like jet fires or explosions, and the consequences of those outcomes for people. We created customized fault trees to calculate the frequencies of different sizes of leaks and event sequence diagrams to calculate ignition probabilities for the various leak sizes. We also leveraged the HyRAM+ toolkit to use these inputs to calculate overall risk for the facility, which we separated into one section responsible for producing, storing, and compressing hydrogen, and one section responsible for dispensing the hydrogen to the buses. We found that the dispensing area seemed to have a higher risk than the production/storage/compression area of the facility, largely because of the inclusion of a component with a high leak frequency (the heat exchanger used to cool the hydrogen before entering the vehicle, to prevent overheating and expansion of hydrogen in the onboard tank). For the example production and refueling facility we evaluated and the data we used for the analysis, the leak frequency had a larger impact on the risk differences between the two sections on the facility, compared to the physical outcome consequence, which was slightly different due to the varying fuel conditions, but not substantially different. Actions can be taken to prevent these hazards (e.g., lowering leak frequencies in system components) or to mitigate the consequences if they do occur (e.g., installing barriers to protect people if ignition events occur). The choice of which actions to take depends not only on safety considerations but also on space, time, staffing, feasibility, and financial constraints. Therefore, the quantitative risk assessment approach can help understand relative risk contributions from different components, leak sizes, consequences, and human actions, to prioritize risk reduction strategies and balance these parameters. The outcomes of this report may be useful for a variety of stakeholders working in the hydrogen, transportation, vehicle, and aviation sector, including those responsible for aspects like facility design, operations, and regulations. There is not a single value of risk that determines whether a hypothetical system is “safe” or not. The insights about risk mitigations may be leveraged, and the quantitative risk assessment approach can be applied to other case studies to understand risk priorities and contributions specific to different FCEB and hydrogen facility uses.

08 HYDROGEN↗

Integral and Separate Effects Test Facilities To Support Water Cooled Small Modular Reactors: A Review

This study reviews previous experimental facilities and test programs relevant to water-cooled reactor system design and analysis to meet regulatory compliances. This study aims to find the best solution for designing the required experiments, obtaining necessary test data, and verifying the developed computer code/models to support the new reactor design and development while minimizing cost and time while leveraging experiences from previous facilities to minimize. Nuclear reactor licensing requires supportive design, analysis, and experimental results to ensure the safety of the full-scale prototype reactor in regular operation, as well as during postulated accident scenarios. These reactor design analyses are generally performed using system codes and other associated simulation tools that require assessment, verification and validation using an appropriate experimental dataset. Experimental facilities used for reactor system safety analysis and system code assessments are categorized into integral effects test (IET) and separate effects test (SET) facilities. Further, these IET and SET experiments and studies use geometrically scaled systems to reproduce the prototype system behavior at a reasonable cost, albeit with some scaling-related distortions. The design challenge of these model facilities is to identify and minimize scaling distortions while reproducing the most important operational phenomena in steady-state operation and in postulated accident scenarios. Lessons learned from previous experimental facilities, models, and correlations can support the development of new multipurpose, scaled, hybrid, integrated, and modular experimental facilities for advanced light water-cooled small modular reactors (SMRs). Successful operation of these facilities can significantly reduce upfront reactor development and demonstration costs and time to deployment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Understanding Risk Tolerance and Building an Effective Safety Culture

Estimates range from 65-90 percent of catastrophic mishaps are due to human error. NASA's human factors-related mishaps causes are estimated at approximately 75 percent. As much as we'd like to error-proof our work environment, even the most automated and complex technical endeavors require human interaction... and are vulnerable to human frailty. Industry and government are focusing not only on human factors integration into hazardous work environments, but also looking for practical approaches to cultivating a strong Safety Culture that diminishes risk. Industry and government organizations have recognized the value of monitoring leading indicators to identify potential risk vulnerabilities. NASA has adapted this approach to assess risk controls associated with hazardous, critical, and complex facilities. NASA's facility risk assessments integrate commercial loss control, OSHA (Occupational Safety and Health Administration) Process Safety, API (American Petroleum Institute) Performance Indicator Standard, and NASA Operational Readiness Inspection concepts to identify risk control vulnerabilities.

Loyd, David↗

An Alternative Conceptual Model for the Spent Nuclear Fuel–Water Interaction in Deep Geologic Disposal Conditions

For the long-term safety assessment of direct disposal of spent nuclear fuel in deep geologic repositories, knowledge on the radionuclide release rate from the UO 2 matrix is essential. This work provides a conceptual model to explain the results of leaching experiments involving used nuclear fuel or simulant materials in confirmed reducing conditions. Key elements of this model are: direct effect of radiation from radiolytic species (including defects and excited states) in the solid and in the first water layers in contact with its surface; and excess H 2 may be produced due to processes occurring at the surface of the spent fuel and in confined water volumes, which may also play a role in keeping the spent fuel surface in a reduced state. The implication is that the fractional radionuclide release rate used in most long-term safety assessments (10 -7 year -1 ) is over estimated because it assumes that there is net UO 2 oxidation caused by radiolysis, in contrast with the alternative conceptual model presented here. Furthermore, conventional water radiolysis models and radiation chemical yields published in the literature are not directly applicable to a heterogeneous system such as the spent fuel–water interface. Suggestions are provided for future work to develop more reliable models for the long-term safety assessment of spent nuclear fuel disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗

Nuclear Propulsion Project Workshop summary

NASA-Lewis has undertaken the planning and coordination of a joint NASA/DOE/DOD Nuclear Propulsion Project which will investigate both nuclear electric and nuclear thermal concepts. The three-agency team has been tasked with the development of an Interagency Agreement and Memorandum of Understanding, as well as the drafting of a statement as to astronaut crew guidelines and values, the assessment of human-rating requirements, the development of an interagency safety and environmental assessment plan, and the development of test facility requirements. Attention is to be given to the role of SP-100 for nuclear-electric propulsion applications.

Miller, Thomas J.↗

MELCOR

MELCOR is a fully integrated, engineering-level computer code for modeling the progression of severe accidents in light water reactors (LWR) at nuclear power plants and nuclear fuel cycle facilities. Originally developed to assess severe accidents following Three Mile Island, MELCOR’s flexible modeling framework has enabled it to be applied to safety assessments of a much broader range of nuclear power reactor designs and other types of nuclear facilities processing radioactive material. Further, MELCOR can model a broad spectrum of severe accident phenomena such as thermal-hydraulic response in a reactor coolant system; core heat-up, degradation, and relocation; and transport behavior in both boiling water and pressurized water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Application of the Life Safety Code to a Historic Test Stand

NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact. An effort was launched to thoroughly evaluate the applicable life safety requirements, examine the context in which they were derived, and determine a means by which the TS4550 modifications could be made within budget and on schedule, while still providing the occupants with appropriate levels of safety.

Askins, Bruce↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Reliability of Digital Communications in Nuclear Facilities and Operations

A comprehensive evaluation of methods to compare the reliability of wired and wireless digital communication networks for use in nuclear power plants. The study underscores the critical role of communication reliability in ensuring operational safety in nuclear power plants. Key objectives include developing a methodology to assess communication technologies’ reliability, particularly for comparing wireless and wired networks, for nuclear facility applications. The framework focuses on technology-agnostic evaluations and emphasizes the importance of reliability metrics spanning safety, security, and monitoring functions. The framework emphasizes that the key performance indicators are application dependent and provides a hierarchy of different network types that will have different reliability requirements. The report considers both existing plants and advanced reactors, including small modular reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

Launch Services Safety Overview

NASA/KSC Launch Services Division Safety (SA-D) services include: (1) Assessing the safety of the launch vehicle (2) Assessing the safety of NASA ELV spacecraft (S/C) / launch vehicle (LV) interfaces (3) Assessing the safety of spacecraft processing to ensure resource protection of: - KSC facilities - KSC VAFB facilities - KSC controlled property - Other NASA assets (4) NASA personnel safety (5) Interfacing with payload organizations to review spacecraft for adequate safety implementation and compliance for integrated activities (6) Assisting in the integration of safety activities between the payload, launch vehicle, and processing facilities

Loftin, Charles E.↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Radiological Dose Consequence Modeling Parameters for Reactor and Nonreactor Nuclear Facilities

To assure consistency between DOE and NRC safety basis requirements this ECAR documents the DOE basis requirements for dose consequence assessments in accordance with Standard DOE-STD-3009-2014. The methodology in this ECAR outlines parameters for evaluating airborne radiological releases and provides a consistent basis for assessing current and future DOE NE facilities.

73 - NUCLEAR PHYSICS AND RADIATION PHYSICS↗

NC Space Grant Report

During the summer of 2018 I supported the Safety & Mission Assurance Directorate (SMA) and Operations Support Division (QA-20) at Stennis Space Center. The mission of the SMA team is to prove safety, risk, reliability, independent assessments, configuration management and quality assurance guidance, and services for all NASA Stennis Space Center (SSC) programs, facilities, and supporting infrastructure. The office actively participates and contributes to the Agency-level Safety & Mission Assurance (S&MA) effort. Over the course of the Summer I participated in three projects. Two of them were focused around Fault Tree Analysis (FTA) and the third focused on relief valves for their E-1 engine test stand.

Torres, David↗