Engineering PapersSearch

SEARCH · Engineering Papers

Results for “environmental permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures

CRADA Final Report: CRADA Number NFE-22-09311 with Agriwater Tech

Livestock wastewater management is a critical concern in the United States, with an annual production of approximately 1.37 billion tons of waste, surpassing human waste by three to twenty times. The mismanagement of manure wastewater poses significant threats to freshwater sources, ecosystems, and public health. Through this project, we proposed an innovative solution using electrocoagulation (EC) treatment. The EC technique is an electrochemical process involving the intentional corrosion of aluminum and iron electrodes to introduce trivalent ions into the solution, facilitating the co-precipitation and coagulation of contaminants and making the removal of water from sludge easier. The project's primary objective is to use EC to convert liquid animal manure into clean water for farm irrigation, drinking, and maintenance. This solution is vital for various farms including those facing drought, pursuing zero-discharge, and seeking Environmental Protection Agency (EPA) permits for livestock farm manure discharge into rivers. Preliminary research shows EC's potential to significantly reduce turbidity and phosphate levels in livestock wastewater, forming the basis for scalable onsite treatment. The goal of this proposed project is to develop an innovative farm-wastewater-treatment process to achieve clean water, fertilizer, and reduced greenhouse gases through electrification of current processes such as coagulation, dewatering, inactivation of viruses and bacteria, and filtration for recycling surface water from farm lagoons.

54 ENVIRONMENTAL SCIENCES

CRADA Final Report: CRADA Number NFE-22-09311 with Agriwater Tech

Livestock wastewater management is a critical concern in the United States, with an annual production of approximately 1.37 billion tons of waste, surpassing human waste by three to twenty times. The mismanagement of manure wastewater poses significant threats to freshwater sources, ecosystems, and public health. Through this project, we proposed an innovative solution using electrocoagulation (EC) treatment. The EC technique is an electrochemical process involving the intentional corrosion of aluminum and iron electrodes to introduce trivalent ions into the solution, facilitating the co-precipitation and coagulation of contaminants and making the removal of water from sludge easier. The project's primary objective is to use EC to convert liquid animal manure into clean water for farm irrigation, drinking, and maintenance. This solution is vital for various farms including those facing drought, pursuing zero-discharge, and seeking Environmental Protection Agency (EPA) permits for livestock farm manure discharge into rivers. Preliminary research shows EC's potential to significantly reduce turbidity and phosphate levels in livestock wastewater, forming the basis for scalable onsite treatment. The goal of this proposed project is to develop an innovative farm-wastewater-treatment process to achieve clean water, fertilizer, and reduced greenhouse gases through electrification of current processes such as coagulation, dewatering, inactivation of viruses and bacteria, and filtration for recycling surface water from farm lagoons.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

River systems under peaked stress

The change in the global energy production mix towards variable renewable energy sources requires efficient utilization of regulated rivers to optimise hydropower operations meet the needs of a changing energy market. However, the flexible operation of hydropower plants causes non-natural, sub-daily fluctuating flows in the receiving water bodies, often referred to as ‘hydropeaking’. Drastic changes in sub-daily flow regimes undermine attempts to improve river system health. Environmental decision makers, including permitting authorities and river basin managers facing the intense and increasing pressure on river environments, should consider ecosystem services and biodiversity issues more thoroughly. The need for research innovations in hydropeaking operation design to fulfil both the water and energy security responsibilities of hydropower is highlighted. Our paper outlines optimized hydropeaking design as a future research direction to help researchers, managers, and decision-makers prioritize actions that could enable better integration of river science and energy system planning. The goal of this is to find a balanced hydropower operation strategy.

54 ENVIRONMENTAL SCIENCES

Uinta Basin CarbonSAFE II: Storage Complex Feasibility (Final Report)

The primary objective of this CarbonSAFE Phase II project was to establish the technical and commercial feasibility of a commercial-scale CO 2 geological storage complex for Deseret Power Electric Cooperative Bonanza Power Plant and other CO 2 sources in the northeast Uinta Basin, Utah, with the goal to securely store at least 50 million metric tons of captured CO 2 and accelerate CO 2 capture, utilization, and storage (CCUS) deployment. The project team established high-potential technical and commercial feasibility for a storage site within the east Uinta Basin (Utah), in the Cretaceous sandstones (Frontier, Dakota, and Buckhorn), Entrada Sandstone, Nugget Sandstone, and/or Weber Sandstone southwest of the Bonanza coal-fired power plant. This project collected and analyzed state-of-the-art data to characterize the storage complex consistent with Environmental Protection Agency (EPA) permitting standards. The team conducted extensive analog studies, outcrop mapping, and data sampling, which largely contributed to understanding the subsurface lithology and facies. Existing data were obtained and assessed from Utah Division of Oil, Gas, and Mining (DOGM), Utah Geological Survey (UGS), Colorado Geological Survey (CGS), U.S. Geological Survey (USGS), and EPA. These data were analyzed using state-of-the-art CCUS technologies for Societal Considerations, Site Characterization, Modeling and Simulations, Risk Assessment, Management and Monitoring, potential Underground Injection Control (UIC) Class VI Well Permitting, and Technical/Economic Feasibility. Through these high-resolution data collection and feasibility studies, this project was expected to provide a reference for initiating Underground Injection Control (UIC) and other commercial-scale geological storage permitting processes in the Western United States, ultimately contributing to the nation's decarbonization goals through low-risk, cost-effective commercial-scale carbon capture, utilization, and storage (CCUS) projects.

42 ENGINEERING

Investigation of the utility of ERTS-1 imagery for updating land use and resource data in Guatemala

The author has identified the following significant results. An intensive analysis of the imagery received has been completed and findings are reported. Conclusions are restricted by receipt of only limited amounts of cloud-free coverage of test areas. In most cases the interpretation findings were as anticipated from previous experience with multiband images. Band 7 provides promising indication of some economically important environmental communities. It also permits viewing through thin cirrus cloud layers for features of medium to high contrast. Band 4 provides information of submerged reefs and of movement of suspended sediment bodies in water areas. ERTS-1 bulk images have positional mapping accuracy adequate for representation at 1:1,000,000 scale maps. Cloud cover is a true constraint to useable satellite coverage.

Garcia, L. E.

Meteorological inputs to advanced simulators

Weather simulation as it is currently implemented and some suggestions and questions considered in future simulator developments are described. Flight simulators represent weather in a considerably broader sense and with an almost limitless capability for future expansion. Realistic weather is important in pilot training simulators. It offers promising opportunity to provide training because it permits an element of environmental control not available in the real world.

Handberg, G. O.

EOS Data and Information System (EOSDIS)

In the past decade, science and technology have reached levels that permit assessments of global environmental change. Scientific success in understanding global environmental change depends on integration and management of numerous data sources. The Global Change Data and Information System (GCDIS) must provide for the management of data, information dissemination, and technology transfer. The Earth Observing System Data and Information System (EOSDIS) is NASA's portion of this global change information system.

Source record

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support

Final DOE-ASR Report for the Project “Using LASSO to bridge the gap between model and observations and to learn about atmospheric convection”

Atmospheric convection spans a wide range of spatial and temporal scales and involves complex interactions with the surrounding dynamic and thermodynamic environment, particularly over tropical continental regions. These processes remain a major source of uncertainty in weather and climate models, including persistent biases in the diurnal cycle of convective precipitation that directly affect estimates of climate sensitivity. Addressing these challenges requires the combined use of high-resolution observations and cloud-resolving modeling frameworks. In this context, the DOE Atmospheric Radiation Measurement (ARM) program’s Large-Eddy Simulation ARM Symbiotic Simulation and Observation (LASSO) activity provides a powerful platform that pairs comprehensive observations with numerical simulations to enable process-level understanding of atmospheric convection. Within this context, this Research and Development Partnership Pilot (RDPP) project was designed to initiate and expand DOE ARM/ASR research capacity at minority-serving institutions, while advancing scientific understanding of convective processes over the Amazon rainforest. Consistent with the RDPP mission, the project emphasized partnership development, training, and workforce capacity building alongside exploratory research activities. On the scientific side, the project produced two peer-reviewed journal articles, and one manuscript currently under review (see list in section 3.1). Together, these studies combine long-term ARM observations and cloud-resolving and convection-permitting modeling to investigate the environmental controls on the shallow-to-deep convective transition during the Amazon wet season. The results demonstrate the central role of early-day moisture preconditioning and large-scale dynamical forcing in regulating isolated deep convection, provide mechanistic insight into convective evolution, and establish physically informed modeling frameworks for future sensitivity experiments. These scientific outcomes are described in sections 2.1 to 2.3 and were disseminated in 8 conference presentations (see section 3.2) and 5 invited talks (see section 3.3), reflecting broad engagement with our community. Equally important, the project achieved its RDPP capacity-building objectives (see section 2.4). A sustained research partnership was established among the University of Maryland, Baltimore County (UMBC), Morgan State University (MSU), and Howard University (HU), and extended to include collaboration with Pacific Northwest National Laboratory (PNNL). The project organized multiple multi-day training events focused on ARM data, LASSO simulations, and quantitative analysis methods, directly engaging students, postdoctoral researchers, and faculty across institutions. These activities broadened participation in ASR research and led to independent adoption of LASSO workflows by students beyond the immediate project team. Finally, the project successfully positioned the participating institutions to pursue future DOE research. Preliminary scientific results, coupled with strengthened partnerships and technical capacity, enabled the submission of follow-on proposals to DOE ASR funding opportunities. In this way, the project fulfilled the RDPP goal of seeding durable research capacity and laying the foundation for larger-scale, sustained engagement with DOE ARM and ASR programs.

54 ENVIRONMENTAL SCIENCES

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS

Siting solar thermal power experiments

The Small Community Solar Thermal Power Experiment will test a point-focusing, distributed receiver system in a small community, electric utility application. Site planning is becoming increasingly important for solar experiments as well as all kinds of development due to increased competition for desirable sites and increased complexity of regulatory requirements. Siting issues can be categorized as: (1) resources and physical environmental at this site; (2) acquisition, permits and regulations; and (3) development requirements and costs. These issues are addressed with respect to the unique requirements of solar thermal power experiments.

Holbeck, H. J.