Engineering PapersSearch

SEARCH · Engineering Papers

Results for “electricity system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Development Status: Automation Advanced Development Space Station Freedom Electric Power System

Electric power system automation for Space Station Freedom is intended to operate in a loop. Data from the power system is used for diagnosis and security analysis to generate Operations Management System (OMS) requests, which are sent to an arbiter, which sends a plan to a commander generator connected to the electric power system. This viewgraph presentation profiles automation software for diagnosis, scheduling, and constraint interfaces, and simulation to support automation development. The automation development process is diagrammed, and the process of creating Ada and ART versions of the automation software is described.

Dolce, James L.

The cost of energy from utility-owned solar electric systems. A required revenue methodology for ERDA/EPRI evaluations

This methodology calculates the electric energy busbar cost from a utility-owned solar electric system. This approach is applicable to both publicly- and privately-owned utilities. Busbar cost represents the minimum price per unit of energy consistent with producing system-resultant revenues equal to the sum of system-resultant costs. This equality is expressed in present value terms, where the discount rate used reflects the rate of return required on invested capital. Major input variables describe the output capabilities and capital cost of the energy system, the cash flows required for system operation amd maintenance, and the financial structure and tax environment of the utility.

Source record

Energy Augmentation for Vehicle Electric Systems (EAVES)

This preliminary study evaluated eight concepts for augmenting the energy state of electric Vertical Take-Off and Landing vehicles. Advanced Air Mobility electric vehicles could need additional charge due to depleted batteries (e.g., strong winds along the way) while approaching their destination. There are five direct charging and three indirect charging concepts presented in this paper. The concepts are in the preliminary research stage and are being refined. Considering the concepts are for the year 2045 timeframe, there is sufficient time to evolve them, along with the designs of these electric air vehicles. This Technical Memorandum describes more detail and provides a discussion on the desirability, viability, feasibility, and wickedness of these energy augmentation concepts. A discussion of barriers and initial investigation approach for the concepts is presented as well. One intent for the presentation of this Technical Memorandum is to capture the work done from March through September 2022 within NASA’s Convergent Aeronautics Solutions (CAS) Project, in the Transformative Aeronautics Concepts Program. At the end of the effort, it was decided that only one concept would be further investigated. The rest of the concepts for energy augmentation would be described in this document and could be picked up later if NASA chose to further investigate them. This document is a collection of input from the authors regarding the concepts they worked on. It is not intended to be a conference or journal publication, but a record of research conducted on the concepts considered by the Energy Augmentation for Vehicle Electric Systems (EAVES) team consisting of the authors. Mr. Todd Stinchfield was the Principal Investigator.

Kapil Sheth

The value of hydropower flexibility for electricity system decarbonization

Hydropower is an abundant, dispatchable, clean energy resource that will play an important role in supporting the clean energy transition. In particular, dispatchable hydropower can provide the operational flexibility that will be required in future systems with high variable renewable energy penetrations. However, the theoretical operational flexibility of hydropower can be restricted in practice by various non-power constraints. In this paper, we quantify how increasing the operational flexibility of dispatchable hydropower resources with reservoirs impacts least-cost generation portfolios and supports power system decarbonization. Specifically, we conduct a capacity expansion analysis of a two-zone system: a hydro-dominated region and a neighboring region with aggressive decarbonization targets that are represented by the United States Pacific Northwest and California respectively. We then introduce a quantifiable index for characterizing the operational flexibility of reservoir hydropower and assess how changes in this metric impact the system-optimal generation portfolio. We find that increasing hydropower flexibility leads to more investment in wind generation, less investment in natural gas generation, lower system costs, and lower system emissions. We further demonstrate a substitution effect between the grid services provided by flexible hydropower operation, increased transmission capacity on a congested line, and energy storage resources. Finally, we show that increasing the operational flexibility of hydropower increases the effective load carrying capability of both hydropower and wind resources. This research supports a more nuanced understanding of how hydropower can support electricity system decarbonization and may motivate reassessing the cost-benefit tradeoffs of non-power constraints that restrict operational flexibility.

Capacity expansion modeling

High voltage spacecraft electrical systems design

Factors which must be considered when designing the best and the most cost-effective high-voltage electrical system for a spacecraft are discussed with particular attention given to the EMC considerations, high-voltage power bus, and harnesses. It is emphasized that the use of serial data buses and lines greatly simplify the harness design and weight. Careful attention to the grounding concept and the EMC requirements is necessary for insuring a 'quiet' spacecraft.

Stone, R. E.

Design of Electrical Systems for Rocket Propulsion Test Facilities at the John C. Stennis Space Center

This viewgraph presentation reviews the design of the electrical systems that are required for the testing of rockets at the Rocket Propulsion Facility at NASA Stennis Space Center (NASA SSC). NASA/SSC s Mission in Rocket Propulsion Testing Is to Acquire Test Performance Data for Verification, Validation and Qualification of Propulsion Systems Hardware. These must be accurate reliable comprehensive and timely. Data acquisition in a rocket propulsion test environment is challenging: severe temporal transient dynamic environments, large thermal gradients, vacuum to 15 ksi pressure regimes SSC has developed and employs DAS, control systems and control systems and robust instrumentation that effectively satisfies these challenges.

Hughes, Mark S.

Electrical System Trade Study for SUSAN Electrofan Concept Vehicle

The SUSAN Electrofan Aircraft concept is a subsonic regional jet transport aircraft that utilizes a single turbofan engine and Electrified Aircraft Propulsion (EAP) to enable propulsive and aerodynamic benefits to reduce fuel usage, emissions, and cost. This paper is a trade space exploration of the electrical system for the concept aircraft, including possible system architectures, and a review of the specific powers and efficiencies required for the electrical components to realize the EAP system.

Joseph M Haglage

Options and Risk for Qualification of Electric Propulsion System

Electric propulsion vehicle systems envelop a wide range of propulsion alternatives including solar and nuclear, which present unique circumstances for qualification. This paper will address the alternatives for qualification of electric propulsion spacecraft systems. The approach taken will be to address the considerations for qualification at the various levels of systems definition. Additionally, for each level of qualification the system level risk implications will be developed. Also, the paper will explore the implications of analysis verses test for various levels of systems definition, while retaining the objectives of a verification program. The limitations of terrestrial testing will be explored along with the risk and implications of orbital demonstration testing. The paper will seek to develop a template for structuring of a verification program based on cost, risk and value return. A successful verification program should establish controls and define objectives of the verification compliance program. Finally the paper will seek to address the political and programmatic factors, which may impact options for system verification.

Bailey, Michelle

Analysis methods for wind turbine control and electrical system dynamics

The integration of new energy technologies into electric power systems requires methods which recognize the full range of dynamic events in both the new generating unit and the power system. Since new energy technologies are initially perceived as small contributors to large systems, little attention is generally paid to system integration, i.e. dynamic events in the power system are ignored. As a result, most new energy sources are only capable of base-load operation, i.e. they have no load following or cycling capability. Wind turbines are no exception. Greater awareness of this implicit (and often unnecessary) limitation is needed. Analysis methods are recommended which include very low penetration (infinite bus) as well as very high penetration (stand-alone) scenarios.

Hinrichsen, E. N.

Robotics for Systems Integration in Buildings: Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (off-site construction) and 3D-printed buildings (on-site construction). Such multisystem integration tasks often require specialized robots and custom end effectors to handle a range of rigid and nonrigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multitrade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the US Department of Energy's (DOE's) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end-effector hardware to handle these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same are presented. Finally, limitations and lessons learned from this study are included, along with future research recommendations for robotic assembly of more complex multitrade assemblies, including potential scenarios such as robotic outfitting of facilities in extraterrestrial environments.

advanced manufacturing

Simulation of a Flywheel Electrical System for Aerospace Applications

A Flywheel Energy Storage Demonstration Project was initiated at the NASA Glenn Research Center as a possible replacement for the battery energy storage system on the International Space Station (ISS). While the hardware fabrication work was being performed at a university and contractor's facility, the related simulation activity was begun at Glenn. At the top level, Glenn researchers simulated the operation of the ISS primary electrical system (as described in another paper) with the Flywheel Energy Storage Unit (FESU) replacing one Battery Charge and Discharge Unit (BCDU). The FESU consists of a Permanent Magnet Synchronous Motor/Generator (PMSM), which is connected to the flywheel; the power electronics that connects the PMSM to the ISS direct-current bus; and the associated controller. The PMSM model is still under development, but this paper describes the rest of the FESU model-the simulation of the converter and the associated control system that regulates energy transfer to and from the flywheel.

Truong, Long V.

Electrical power systems.

Electric power generation systems considering chemical, solar and nuclear energy sources and types of conversion

NUCLEAR ENERGY

Jupiter Icy Moons Orbiter (JIMO) Electrical Systems Testbed

The Jupiter Icy Moons Orbiter (JIMO) mission will send a spacecraft to explore three of Jupiter s moons (Callisto, Ganymede, and Europa), all of which show evidence of containing vast subterranean oceans beneath their icy surfaces. The evidence of these oceans was discovered by Galileo, and the moons are believed to have the three essential ingredients for life: water, energy, and the necessary chemical elements. Galileo has shown that melted water on Europa has been in contact with the surface of the moon in geologically recent times, and may still lie relatively close to the surface. This project will also introduce a revolutionary new form of electric propulsion powered by a nuclear fission reactor. This electric propulsion is called ion propulsion. It was used on a previous mission called Deep Space 1, proving that ion propulsion works for interplanetary travel. Since JIMO will be traveling farther from the sun, solar power will be difficult to supply the electric energy demanded by the mission. Therefore a nuclear reactor and a thermo-electric converter system will be necessary. Besides making the trip to three of Jupiter's moons - one after the other - a realistic possibility, this new form of power and propulsion opens up the rest of the outer solar system for future exploration. JIMO will fulfill its goals by exploring Europa first, with subsequent trips to the moons Callisto and Ganymede in order to provide comparisons key to understanding the evolution of all three. In order to ensure the stability and proper preparation of the electrical system on JIMO, the High Power AC Power Management and Distribution (PMAD) Test Bed is being developed. The testing on.this AC PMAD will consist of electrical performance verification of candidate power system components. Examples of these components are: high power AC switchgear, high power ACDC converters, AC power distribution units, DC power distribution units, etc. Throughout the course of the summer the over-current control circuit for the five different size relays will be constructed and tested. This circuit will sense the current input to the spacecraft loads and automatically switch off power if the current is too high. Once the circuit is verified to function properly and all necessary modifications have been made, a circuit schematic and board layout will have to be drawn using OrCAD, and the circuits will have to be built.

Trapp, Scott J.