Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Policy and Cost Allocation Considerations for Large Electric Load Interconnections: Emerging Policy Trends in Rate Structures, Interconnection, and Cost Impacts on Other System Users

Load growth in the United States is rapidly increasing: load from data centers alone has tripled over the past decade, and this growth is forecasted to continue accelerating. These and other large electric loads (LELs) promise economic benefits at the state and local level, but their deployment has also led to increasing concerns about grid impacts and potential cost shifts onto other ratepayers. Legislators, regulators, and other stakeholders are increasingly proposing and enacting policies in effort to balance these and other considerations. This white paper reviews state-level legislation, selected utility rate cases, and relevant federal orders in an effort to describe and categorize relevant trends in policies related to LEL cost allocation, interconnection, and deployment. Policy categories identified through this review include tax incentives, rate actions, and requirements related to interconnection, permitting, and reporting. By offering a taxonomy of policies, this white paper aims to offer a resource to policymakers and other stakeholders navigating this transformative moment for the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Assessment for the Electric Load Shifting Potential of Integrating Thermal Energy Storage with Heat Pumps in Residential Buildings in Texas of United States

The widespread adoption of electric-driven heat pumps for heating and cooling is expected to significantly increase electric demand. Cooling electric demand will result in an increase in peak hours electric loads, placing additional strain on the grid during peak hours. This challenge, combined with the current rapidly increasing demand from data centers, exacerbates the electric demand duck curve problem. Integrating thermal energy storage (TES) with heat pump can shift electric use for heating and cooling from peak to off-peak hours of the electric grid, which can help flatten the daily electric demand profile of a building. This paper presents a novel design that integrates heat pump with TES (HP-TES), which uses phase change materials (PCM). Heat pump charges TES by melting or freezing PCM during off-peak hours when there is no thermal demand from the building. TES is then discharged (i.e., by freezing or melting PCM) during peak hours to provide a more favorable heat source or heat sink for the heat pump to meet the thermal demand of the building with lower electricity use than conventional air-source heat pumps. Computer simulations were developed to predict the performance of HP-TES applied to a typical single-family house in the US. The building-level simulation results were scaled up to preliminarily assess the aggregated impacts of deploying HP-TES across all single-family houses in Texas of the United States, including reduction of peak demand of the electric grid.

Anees, Fady [ORNL]↗

High power ac/dc variable R dynamic electrical load simulator

A study program was undertaken to investigate various concepts and techniques for identifying and simulating both the steady-state and dynamic characteristics of electrical loads for use during integrated system test and evaluation. The development of hardware capable of providing the simulation capability is discussed. A general purpose simulator was developed with the capability of realizing a variety of models where element values were discretely variable. The different models, each corresponding to real spacecraft equipment, are set up manually for each case by suitable switching and patching. The models are capable of duplicating the dynamic and steady-state response of real loads at full power.

Joncas, K. P.↗

Sequence-to-sequence neural networks for short-term electrical load forecasting in commercial office buildings

The U.S. power grid is transforming to become smarter, cleaner, and more effi- cient. This is leading to the addition of significant distributed variable renew- able generation. Due to the variable nature of renewable generation, the short- and long-term supply-demand imbalances are less predictable, and conventional approaches to mitigating the imbalance will not be efficient or cost-effective. To address this challenge, transactive control technologies have been proposed which balance energy generation and consumption with market activity and in- frastructural limitations. Transactive control requires the ability of individual end-use loads to express flexibility as a function of a transactive signal (e.g., price). Empirical gray- and black-box models have been widely used to express flexibility, and although these approaches are generally easy to construct and simple to use, they do not capture the non-linear behavior that some end-use loads represent . Machine learning approaches have been proposed to address this limitation. Although deep learning approaches for forecasting end-use loads have been explored, certain aspects of the application of deep models to load forecasting are not well understood. These aspects include how much training data is required, and how models should be structured and trained. To that end, this work explores how to approach applying deep recurrent neural networks to short-term electrical load forecasting with a case study of four commercial office buildings. We identify data requirements for training accurate models of whole building electricity use conditioned on outdoor temperature, provide insight into model hyperparameter sensitivity, and demonstrate how readily models can be generalized to unseen buildings.

Skomski, Elliott↗

Quantifying the Effect of Economic Development Zones on Electrical Load Growth in Kentucky [Slides]

The Kentucky Energy and Environment Cabinet has recently undertaken a comprehensive effort to map and catalog potential economic development sites across the state. The purpose of this technical assistance is to quantify the potential impact of developing designated sites on Kentucky's electricity load growth, providing insights at both state and county level considering the next 10 years. This analysis should explicitly incorporate and address key project uncertainties by developing various load growth scenarios that account for development scale, site specificity, and sector variability. The need for a site-specific analysis comes from the understanding that conventional econometric (top-down) load forecasting models cannot sufficiently isolate or predict the discrete load increases resulting from the development of these unique and targeted economic sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

District-Scale Analysis of Electricity Load and Strategies to Improve Energy Reliability Using Prototype District Models

Projected increases in electricity demand in the U.S. highlight the urgent need for effective load management to ensure grid reliability. As the building sector accounts for approximately 75% of electricity usage, enhancing energy efficiency and flexibility in this sector is crucial. Adopting district-level approaches offers significant advantages over traditional individual building analyses by enabling shared infrastructure and economies of scale. To navigate the data and computational challenges associated with modeling energy at the district level, prototype district models have been proposed as holistic, system-level solutions that capture complex interactions within typical configurations. This study presents these models as a reference tool for analyzing district-scale energy systems across various climate zones in the U.S. Developed with input from stakeholders, these models integrate varied building characteristics, inter-building connections, and energy system interactions. A case study utilizing the Urban Edge prototype district model, implemented on the URBANopt™ platform, evaluates multiple demand scenarios and the impact of distributed energy resources such as fuel-fired backup generators, photovoltaic systems, and batteries. Findings suggest that while new electric systems can significantly reduce annual energy use, they may also elevate peak electricity loads, with a notable 43% increase in heating-dominant climate zone 5B. The optimal backup power solutions vary based on location, influenced by factors such as utility rates and incentives. For example, PV and batteries perform well in high-cost regions like New York City, while diesel backup generators are more suitable for backup needs in climate zone 3A, such as Atlanta. Thus, this research highlights the importance of prototype district models for future district-scale energy planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Short-term electricity load forecasting: Application-driven evaluation of machine learning models across spatial and temporal scales

As we transition towards a decarbonized economy, the integration of variable renewable energy resources and new demands (e.g., electric vehicles, heat pumps) into the electricity grid places unprecedented pressure on grid operators to effectively anticipate and manage peak load. In this context, machine learning algorithms are proving to be indispensable for accurate short-term load forecasting, a crucial task to address these challenges. This study benchmarks 6 machine learning algorithms, including three neural networks and three tree-based algorithms, across various levels of spatial aggregation and time horizons (1, 4, 8, 24, and 48 h). The central contribution of this work is the comparison and analysis of load forecasting models not only based on statistical metrics, but also based on a novel error metric, which evaluates the cost implications of forecast errors for power system stakeholders. Results show that tree-based models outperform neural networks, based on statistical metrics, and yield less skewed error distributions for most spatial scales. However, through the lens of the novel error metric, neural networks are the more competitive choice, especially for forecast horizons that exceed 8 h. The study concludes with actionable recommendations to grid operators and highlights the need for the development of error metrics that link forecasting accuracy to operational costs. To promote transparency and open science, the datasets and Python code are open-sourced via a supplementary repository.

Houben, Nikolaus↗

An expert system for simulating electric loads aboard Space Station Freedom

Space Station Freedom will provide an infrastructure for space experimentation. This environment will feature regulated access to any resources required by an experiment. Automated systems are being developed to manage the electric power so that researchers can have the flexibility to modify their experiment plan for contingencies or for new opportunities. To define these flexible power management characteristics for Space Station Freedom, a simulation is required that captures the dynamic nature of space experimentation; namely, an investigator is allowed to restructure his experiment and to modify its execution. This changes the energy demands for the investigator's range of options. An expert system competent in the domain of cryogenic fluid management experimentation was developed. It will be used to help design and test automated power scheduling software for Freedom's electric power system. The expert system allows experiment planning and experiment simulation. The former evaluates experimental alternatives and offers advice on the details of the experiment's design. The latter provides a real-time simulation of the experiment replete with appropriate resource consumption.

Kukich, George↗

An expert system for simulating electric loads aboard Space Station Freedom

Space Station Freedom will provide an infrastructure for space experimentation. This environment will feature regulated access to any resources required by an experiment. Automated systems are being developed to manage the electric power so that researchers can have the flexibility to modify their experiment plan for contingencies or for new opportunities. To define these flexible power management characteristics for Space Station Freedom, a simulation is required that captures the dynamic nature of space experimentation; namely, an investigator is allowed to restructure his experiment and to modify its execution. This changes the energy demands for the investigator's range of options. An expert system competent in the domain of cryogenic fluid management experimentation, was developed. It will be used to help design and test automated power scheduling software for Freedom's electric power system. The expert system allows experiment planning and experiment simulation. The former evaluates experimental alternatives and offers advice on the details of the experiment's design. The latter provides a real-time simulation of the experiment replete with appropriate resource consumption.

Kukich, George↗

Electrical load management at the Goldstone DSN Complex

A Power Load Management Plan was deveoped which utilizes the unique power generating capabilities of the stations to reduce the stress on the local utility's reserve capacity and reduce the cost of electrical power at the stations. The plan has greatly reduced the cost of Goldstone electrical power by completely eliminating the use of commercial power during the local utility's high usage periods each day.

Rayburn, J. C.↗

Robust Deep Gaussian Process-Based Probabilistic Electrical Load Forecasting Against Anomalous Events

The abnormal events, such as the unprecedented COVID-19 pandemic, can significantly change the load behaviors, leading to huge challenges for traditional short-term forecasting methods. This article proposes a robust deep Gaussian processes (DGP)-based probabilistic load forecasting method using a limited number of data. Since the proposed method only requires a limited number of training samples for load forecasting, it allows us to deal with extreme scenarios that cause short-term load behavior changes. In particular, the load forecasting at the beginning of abnormal event is cast as a regression problem with limited training samples and solved by double stochastic variational inference DGP. The mobility data are also utilized to deal with the uncertainties and pattern changes and enhance the flexibility of the forecasting model. The proposed method can quantify the uncertainties of load forecasting outcomes, which would be essential under uncertain inputs. Extensive comparison results with other state-of-the-art point and probabilistic forecasting methods show that our proposed approach can achieve high forecasting accuracies with only a limited number of data while maintaining the excellent performance of capturing the forecasting uncertainties.

anomalous events↗

FTR for: Reducing plug-load electricity footprint of residential buildings through low-cost, non-intrusive sub-metering and personalized feedback technology

The project started in October 2016 and ended in December 2022. The project's principal goals and achievements were: (i) Measure real and reactive electric power consumption in ~400 apartments in multifamily settings of varying size and vintage and publish the data; data was published according to New York State's recommended 15x15 rule continuously from Jan 2019 through December 2022 (10 second time resolution); with the combination of large number of apartments, real and reactive power, as well as high time resolution (10-seconds), the dataset is first of its kind worldwide; because the dataset New York City apartment consumption pre, during, and post pandemic, it further offers unique insights into changes in residential electricity consumption during lockdowns and after modified work from home schedules. (ii) Measure effectiveness of different feedback types to prompt residents to lower their electricity consumption; achieved 11% (kWh-weighted) reduction versus baseline consumption; confirmed previous studies that social comparisons elicit above average responses; showed, for the first time, that the so called boomerang effect in power consumption feedback projects can be explained by a previously hypothesized norm-conforming "magnet effect" (rather than a non-conforming defiance effect), thus substantially advancing the research in the field. (iii) Disaggregate apartment-level consumption to appliance level; because the hardware for electricity consumption unexpectedly allowed only for 10-second time resolution (rather than the 1-second resolution we had planned on), the disaggregation algorithms we developed on sample data could not be applied to the actual field data we collected. The project has yielded high visibility, with a total of 17 publications, from peer reviewed journals, published data sets (free access), blog posts, NY Times, National Public Radio, and CNN.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Best Practices in Electricity Load Modeling and Forecasting for Long-Term Power System Planning

This document highlights the best practices on data acquisition and management, modeling and stakeholder engagement required for enhanced load modeling and forecasting. Each section is interspersed with case studies to highlight lessons from different country contexts to highlight both cross-cutting and location specific best practices needed to conduct robust load modeling and forecasting.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Best Practices in Electricity Load Modeling and Forecasting for Long-Term Power System Planning

This report highlights best practices for enhanced load modeling and forecasting for long-term power sector planning. The best practices touch on stakeholder engagement, data acquisition and management, modeling and validation, and scenario development. Case studies are provided to highlight crosscutting lessons that could inform enhanced load modeling and forecasting across different country settings. Though this work presents best practices resulting from support to the PDOE, the list is by no means exhaustive—nor is it meant to be prescriptive.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modular, high power, variable R dynamic electrical load simulator

The design of a previously developed basic variable R load simulator was entended to increase its power dissipation and transient handling capabilities. The delivered units satisfy all design requirements, and provides for a high power, modular simulation capability uniquely suited to the simulation of complex load responses. In addition to presenting conclusions and recommendations and pertinent background information, the report covers program accomplishments; describes the simulator basic circuits, transfer characteristic, protective features, assembly, and specifications; indicates the results of simulator evaluation, including burn-in and acceptance testing; provides acceptance test data; and summarizes the monthly progress reports.

Joncas, K. P.↗

A brief analysis and its experiment of the hydraulic-electric loading servosystem

The servosystem is a force simulator. It can be used to simulate the hinge moment of the control surface for aircraft, and still be a stick force generator. According to the experiences of a real system, theoretical analyses of the loading system and its characteristics were performed and the possibility of improving its performances is discussed.

Liango-Fu, M.↗