At least 37 records · Page 2

U.S. Eastern Interconnection (EI) Model Reductions Using A Measurement-based Approach

Interconnected power systems experienced a significant increase in size and complexity. It is computationally burdensome to represent the entire system in detail to conduct power system analysis. To derive reduced models of large power systems, this paper proposes a measurement-based dynamic equivalent, which uses a set of measurements at the boundary nodes between the study area and external area for model parameter identification. Case studies on the U.S. Eastern Interconnection (EI) demonstrate that the measurement-based equivalent technique can capture the external system behaviors accurately and improve computation efficiency.

Zhang, Xuemeng↗

Frequency Response Assessment and Improvement of Three Major North American Interconnections due to High Penetrations of Photovoltaic Generation

As photovoltaic (PV) generation penetration increases, the inertial and primary frequency response of North American electric grids after a generation loss disturbance will decrease. This change could negatively influence North American power grids frequency stability. This project produced a series of high PV penetration models from detailed, validated base models of all three U.S. interconnections (Eastern Interconnection, Western Electricity Coordinating Council, and Electric Reliability Council of Texas) so that the effects of increased PV generation on their frequency responses can be fully quantified. Mitigation strategies were also developed and validated using both software and hardware test beds.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY2018 Discovery Through Situational Awareness: Anomalies, Oscillations, and Classification

This technical report is a summary of work performed under the DOE GMLC program under the task titled “Discovery through Situational Awareness”. The focus of this work was to apply big data, statistical techniques to PMU data to do the following: 1) baseline PMU data and find anomalies with a focus on phase angle pairs, 2) identify the frequencies of dominant modal oscillations between different parts of a power system, and 3) identify and classify frequency events in PMU data. This work was performed on PMU data from the Western Interconnect. Many of these algorithms will be applied to wide area phase angle pair data on the Eastern Interconnect in a tool called ESAMS (Eastern Interconnect Situational Awareness Monitoring System). ESAMS was built by EPG (Electric Power Group) and PNNL and is currently being installed on the Eastern Interconnect. The results discussed in this report were made from 14 PMUs from data ranging from Oct 2016 to May 2018. The PMU data were measured 60 times each second. Fourteen phase angle pairs were included, with reactive and active power being calculated at 14 sites. All results have been de-identified for this report. The methodologies applied in the ESAMS tool are described in Section 2. A baseline of PMU data is created using the last 120 days of data. This baseline describes typical behavior as understood from the data. The baseline is then applied to the next day’s data and anomalies from that baseline are identified. Plots are created to help describe what is anomalous during that specific moment in time. These algorithms are currently being installed on the Eastern Interconnect. FY19 work will include discussing the results and findings from the ESAMS tool. A new method of identifying the frequencies of dominant modal oscillations between different parts of a power system is described in Section 3. A list of 199 frequency events provided by Bonneville Power Administration were used to create algorithms to detect frequency events and to create classification rules that can be used to identify future frequency events. Section 4 discusses the results the performance of 7 different event detection, clustering-based methods. Accuracy percentages ranged from 93.59% to 99.16%, with most methods being very fast. GBM (Gradient Boosting Machine) performed well and quickly. These 7 different methods were also tested to determine how well each built classification rules on training data and then applied those rules to identify future frequency events. Accuracy percentages ranged from 89.09% to 99.9%, with all methods performing quickly. GLM (General Linear Model) was viewed as the top performer when considering accuracy and processing time. Because the list of events consisted of 80% of them as active power events and only 20% as faults, all methods struggled to identify events as faults. Small faults were especially difficult to identify. A separate algorithm was created to help with this. Additional work will be done in FY19 on event detection using more data and more events and refinements to the methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Response Assessment and Enhancement of the U.S. Power Grids towards Extra-High Photovoltaic Generation Penetrations – an Industry Perspective

Nonsynchronous generations such as photovoltaics (PVs) are expected to undermine bulk power systems (BPSs)' frequency response at high penetration levels. Though the underlying mechanism has been relatively well understood, the accurate assessment and effective enhancement of the U.S. interconnections, frequency response under extra-high PV penetration conditions remains an issue. In this paper, the industry-provided full-detail interconnection models were further validated by synchrophasor frequency measurements and realistically-projected PV geographic distribution information were used to develop extra-high PV penetration scenarios and dynamic models for the three main U.S. interconnections, including Eastern Interconnection (EI), Western Electricity Coordinating Council (WECC), and Electric Reliability Council of Texas (ERCOT). Up to 65% instantaneous PV and 15% wind penetration were simulated and the frequency response change trend of each U.S. interconnection due to the increasing PV penetration level were examined. Most importantly, the practical solutions to address the declining frequency response were discussed. This paper will provide valuable guidance for policy makers, utility operators and academic researchers not only in the U.S. but also other countries in the world.

14 SOLAR ENERGY↗

Transmission Value in 2023: Market Data Shows the Value of Transmission Remained High in Certain Locations Despite Overall Low Wholesale Electricity Prices

In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Additional EIPC Study Analysis: Final Report

Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Area of Interest 4.Technical Interest to Electric Infrastructure Planners on Other Subjects

In 2010, the U.S. Department of Energy (DOE) provided $60M in funding to five regional entities to conduct interregional transmission planning activities: the Eastern Interconnection Planning Collaborative (EIPC); the Eastern Interconnection States Planning Council (EISPC); the Transmission Expansion Planning and Policy Committee (TEPPC); the State Provincial Steering Committee (SPSC);and the Electricity Reliability Council of Texas (ERCOT). DOE also provided funding to the Lawrence Berkeley National Laboratory (LBNL) to support aspects of these interregional transmission planning activities. LBNL’s support involved both technical assistance to DOE in its oversight of the activities conducted by the five regional entities and the preparation of six, standalone technical studies that were conducted in direct support for specific entities. This is the final report on LBNL’s activities. It consists of summaries of each activity; references are provided to each of the stand-alone studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Eastern Renewable Generation Integration Study: Redefining What’s Possible for Renewable Energy

NREL project manager Aaron Bloom introduces NREL’s Eastern Renewable Generation Integration Study (ERGIS) and high-performance computing capabilities and new methodologies that allowed NREL to model operations of the Eastern Interconnection at unprecedented fidelity. ERGIS shows that the Eastern Interconnection can balance the variability and uncertainty of wind and solar photovoltaics at a 5-minute level, for one simulated year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Inertia Estimation and Trend Analysis of the United States Power Grid Interconnections

The transition from conventional to modern power systems is causing an increase in integration of inverter-based resources (IBRs). This generally leads to a decrease in total system inertia, which in-turn increases the system’s rate-of-change-of-frequency (RoCoF) during disturbances. This poses a threat to the frequency stability of the system and may falsely trigger protective devices. To monitor system status and plan for integrating renewable energy sources like photovoltaic, wind, and energy storage systems, a realistic study of inertia estimation and analysis in the United States (US) over the past decade is needed. This paper uses field-measured phasor measurement unit (PMU) data collected throughout the US from 2013 to 2023 via the Frequency Monitoring Network (FNET/GridEye) operated by the University of Tennessee, Knoxville (UTK) and Oak Ridge National Laboratory (ORNL). The collected PMU frequency data is utilized to estimate the system inertia of the three US interconnections: Eastern, Western, and Texas. Various RoCoF time windows are investigated for estimating the inertia of each interconnection by maximizing the correlation coefficient between the measured RoCoF and power mismatch. The resulting inertia trends over the past decade show approximately a 6% decline in inertia in the Eastern interconnection, a 15% decline in inertia in the Western interconnection, and a 16% increase in inertia in Texas. Key insights into how inertia is changing amidst the complex energy landscape are extracted using the fuel mix trend data. This provides valuable information for future energy strategies and planning.

30 DIRECT ENERGY CONVERSION↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Regional Oscillation Source Localization: Implementation in the ESAMS Tool

In recent years, utilities have made great strides in the use of high-speed wide-area measurements collected from within their footprints. However, it is increasingly clear that analyses at wider scales are needed. On January 11, 2019 an oscillation with significant amplitude observable across the Eastern Interconnection persisted for approximately 18 minutes. The generator responsible for the oscillation was only identified after it tripped itself offline. This event, along with several other similar events, demonstrated the need for increased coordination among utilities to effectively mitigate system-wide oscillations and avoid unnecessary or detrimental operator actions. In response to this need, the Eastern Interconnection Situational Awareness Monitoring System (ESAMS) was upgraded to allow the region where an oscillation is originating to be identified. This report documents the algorithms developed for this task and describes how they were integrated into the ESAMS tool. Results from simulation- and measurement-based tests demonstrate the reliability of the approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗