Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase I Conceptual Study)
The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and the proposed system is an improvement over alternate low carbon dispatchable power options. Our demonstration will include 54 MWh of hydrogen storage. CO 2 capture inherent to the CHG process can capture 90% of the CO 2 (with upgrades to >98%) in a commercial system (~300 MWth) for sequestration or other uses. The hydrogen will be utilized in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with the existing Southern Company fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load. However, H 2 production is relatively constant by storing H 2 , and revenues are improved by arbitrage between use of low-cost off-peak variable electricity generation or use of stored H 2 under peak demand. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via system requirements review with the whole team. These requirements were then incorporated into/iterated with our Heat & Mass Balance models and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Our system generates power at 17.4% lower cost than other low carbon approaches for the H 2 generation, H 2 compression and storage, carbon sequestration, and HRSG added electricity production for a large-scale duct-fired system. Our team recommends completing the Phase II Pre-FEED study for the proposed system as the next step for the project and its tasks will achieve the overall objective and be ready to launch the FEED. The Pre-FEED tasks include updating the requirements, Concept of Operations, plant scope/process description, component modeling, system modeling, performance estimates, emission estimates, block flow diagrams, fluid/process conditions (PFD), utility usage, and facility sizing/definition. The approach will be to complete these updates in a greater level of detail for the selected site. The approach for developing the EIV is to use the updated results, including model outputs, for carbon dioxide and waste streams.