Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed teams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Enhancing Discoverability and Management of Atmospheric Data at Scale: Solutions from the ARM Data Center

The Atmospheric Radiation Measurement (ARM) is a multi-laboratory and multi-institutional U.S. Department of Energy (DOE) Office of Science National User Facility. The ARM Data Center (ADC), located at Oak Ridge National Laboratory, collects, archives, and shares vast atmospheric data crucial for climate research. The ADC manages over 7 PB of data from 460 instruments worldwide, processing it into more than 11,000 diverse data products using the Network Common Data Form (NetCDF) for machine-independent accessibility. The primary challenge addressed in this paper is the efficient management and distribution of vast and diverse datasets essential for the climate research community, enhancing accessibility through advanced tools like Data Discovery. The ADC has developed advanced infrastructure and software architecture to handle the continuous influx of heterogeneous data to enhance data discoverability, resulting in increased scientific collaboration. In 2023, users from over 34 countries downloaded and utilized ARM data, resulting in 1,455 publications. The ADC’s efforts have significantly improved the discoverability and usability of atmospheric data, fostering extensive scientific research and collaboration. This paper details the solutions implemented by the ADC team for efficient data discovery and distribution, and it demonstrates ARM’s capability of staging processed data for scientific analysis.

Shah, Chirag [ORNL] (ORCID:0000000203145737)↗

CMIP7 data request: impacts and adaptation priorities and opportunities

The Coupled Model Intercomparison Project Phase 7 (CMIP7) undertook an extensive process to gather community input and refine data requests related to impacts and adaptation applications of Earth System Model (ESM) outputs. The Impacts and Adaptation (I&A) Data Request Team worked with CMIP7 leadership to distribute an open solicitation across many communities that use climate model outputs requesting inputs for new and existing variables, the most applicable temporal characteristics, and groupings of variables that together allow for specific application opportunities. This input was then collated and translated into CMIP7 standard templates for inclusion in the broader data request, leading to 13 I&A data request opportunities, 60 variable groups and 539 unique variables sought by vulnerability, impacts, adaptation, and climate services user communities. Here, we describe these opportunities and variable groups, as well as new insights into how ESM groups can prioritize outputs that set off a chain of further analyses, ultimately informing decisions impacting society and natural systems. These include an emphasis on high-resolution outputs to allow further modeling of climate impacts at regional and local scales, improved representation of extreme weather events, enhanced accuracy of downscaling and bias-adjustment techniques, and support for more detailed assessments for decision-making in adaptation and mitigation strategies. There is also broad interest in more extensive provisioning of two-dimensional variables at the Earth's surface, prioritizing experiments that enhance our understanding of both the recent past and future scenarios, and providing outputs that allow further downscaling and bias adjustment. We emphasize that variable groups are the fundamental level at which to engage with the I&A data request, matching the scale of input and the way output provision enables specific I&A applications. Given resource constraints, we applaud CMIP7 efforts to foster strong engagement and communication between ESM groups and the I&A team to build consensus around prudent compromises in priority variables, temporal resolutions, simulation experiments, time subsets, and ensemble members.

Ruane, Alex C. [NASA Goddard Inst. for Space Studi↗

Preparation of the Multi-Site Data Processing at the Vera C. Rubin Observatory

The Vera C. Rubin Observatory’s Legacy Survey of Space and Time (LSST) Camera is scheduled to start taking data in the summer of 2025. The Data Release Production will run the LSST Science Pipe software at data facilities in the US, France and the UK. The LSST Science Pipeline consists of complex directed acyclic graphs (DAGs) of tasks. Rubin will use the Production and Distributed Analysis (PanDA) workflow and workload management system to orchestrate this complex workflow and the distribution of workloads to the data facilities. When run end-to-end by a team of data production staff, this processing (the Science Pipelines, distributed by the workflow and workload management system) is referred to as a 'campaign'. This paper describes the central services and data facility specific services that support this multi-site data process model, including the service deployment infrastructure, the workload and workflow system, the Campaign Management tools, and connection to Rubin Data Management. This paper will also mention the experience of processing the Rubin Commissioning Camera data. All these are part of the effort to scale up the processing capabilities for the expected very large data volume from the LSST Camera.

Yang, Wei [SLAC]↗

1991 Boston Household Travel Survey

The Central Transportation Planning Staff conducted a household travel survey in 1991, featuring demographic, socioeconomic, and travel features of 2,347 households, generating 39,372 weekday trips. The survey took the form of an activity-based travel diary that each subject household filled out for one weekday. The data was used to estimate new models for trip generation, automobile ownership, trip distribution, and mode choice.

1Hz data↗

NSA Site Science: Use of ARM Observations from Northern Alaska to Evaluate and Improve Prediction Capabilities

The Arctic is warming at a rate nearly double that of the rest of the planet, leading to profound changes in atmospheric, oceanic, and ice processes. The U.S. Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) user facility has played a significant role in Arctic research, operating observatories in Alaska's North Slope for over 25 years. These observatories provide a rich, and wide-reaching dataset that offers insight into atmospheric processes in northern Alaska. This report details the results of a nine-year research project (2015–2024) supported by the DOE Atmospheric Systems Research (ASR) program, that leverages data from ARM’s deployment of observing facilities at Utqiaġvik (known as the North Slope of Alaska, or NSA, site) and Oliktok Point, Alaska. The project was conducted in two phases: - Phase 1 (2015–2019): Focused on understanding key atmospheric processes at Oliktok Point, including cloud formation, high-latitude precipitation, aerosol-cloud interactions, and cloud properties. - Phase 2 (2019–2024): Extended the research to the broader North Slope region, using data from both Oliktok Point and Utqiaġvik. Topics explored included surface energy budgets, atmospheric stability, ice nucleation processes, and microphysics in Arctic clouds. The project resulted in numerous research products, including 50 peer-reviewed publications and dissertations, 169 presentations, and 10 data products. These products cover a variety of topics, including: - Cloud Macro- and Microphysical Properties: Arctic clouds play a crucial role in energy transfer, and accurate representation in models is critical. The study explored cloud transitions, ice crystal shapes, and dual-wavelength radar data to understand ice crystal habits and size distributions. - Aerosol Properties and Processes: The team examined aerosol sources in the Arctic, including industrial emissions and natural sources. Observations showed significant spatial gradients in aerosol concentrations due to human activities and wildfire smoke. The influence of aerosols on cloud formation and the surface energy budget was also assessed. - Aerosol-Cloud Interactions: Research revealed that aerosols might suppress cloud ice production, affecting cloud radiative forcing and precipitation. The impact of local industrial emissions on cloud properties was also investigated. - Contextualizing the North Slope of Alaska in the context of the broader Arctic: To understand broader trends, the project evaluated large-scale circulation patterns and the influence of weather systems on the Arctic. Studies indicated that large-scale processes play a significant role in temperature patterns and the timing of snowmelt. - Advancing ARM Observational and Modeling Capabilities: The project developed new radar data products and advanced measurement techniques, including clutter mitigation and drizzle detection. Uncrewed aerial systems (UAS) and tethered balloon systems (TBS) were deployed to gather detailed atmospheric data. Additionally, the project supported 10 early career scientists, providing training and mentorship to undergraduate interns, graduate students, postdoctoral researchers, and early career researchers. These efforts contributed to the advancement of ARM research capabilities and fostered a new generation of scientists skilled in Arctic atmospheric research. Ultimately, this ASR-supported project has provided valuable insights into Arctic atmospheric processes and their broader climate implications. Recommendations for future work include continuing support for long-term observing at Arctic locations to foster additional research, further exploration of aerosol-cloud interactions and the potential impacts of enhanced industrialization of the Arctic, and expanded use of uncrewed systems to gather data in this remote and harsh environment. Additionally, the data products developed by this work, and the data products developed through the ARM infrastructure, leave a treasure-trove of additional information that should be explored for many years to come to gain additional insight into physical processes in the Arctic atmosphere that drive the rapid changes occurring in at high latitudes and their global impact.

58 GEOSCIENCES↗

Threat Hunt Guide for BESS Environments

The rapid digitalization of the electric grid - driven by the integration of inverter-based resources (IBRs), battery energy storage systems (BESS), and advanced grid control platforms - has significantly enhanced grid efficiency, visibility, and flexibility. However, this evolution also introduces new cybersecurity risks, particularly through supply chain dependencies and operational blind spots at the grid edge. To address these challenges, Idaho National Laboratory (INL), through the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) Rapid Risk initiative, conducted a series of rapid risk assessment engagements with energy organizations across the United States. Drawing on lessons learned from these engagements, INL developed the following threat hunting guide for asset owners and operators (AOOs) to enhance their cybersecurity visibility within BESS and IBR systems. The guide demonstrates how to use passive network monitoring to baseline device behavior, detect adversarial activity, and investigate anomalies without disrupting operations. By implementing these practices, energy sector stakeholders can improve coordination between cybersecurity and operations teams and strengthen the resilience of distributed energy resources (DERs) within the modern power grid. Prior to implementing any network monitoring, packet capture, or threat hunting activity described in this guide, AOOs are strongly advised to review applicable governance frameworks, legal requirements, and organizational policies. This guide is intended for informational and educational purposes only. It does not replace compliance with any federal, state, or local cybersecurity mandates or industry standards. Implementation of described configurations, technologies, or analytic workflows is performed at the discretion and responsibility of the asset owner and operator.

25 - ENERGY STORAGE↗

Enabling Extreme Fast Charging with Energy Storage Final Report

The objective of this project was to develop and demonstrate an extreme fast charging (XFC) station with three 350 kW charging ports that operate at a combined power exceeding 1 MW and mitigate the grid impact by employing smart charging algorithms, using an energy storage system, and connecting directly to a medium-voltage (15 kV-class three-phase) distribution feeder. This final report describes the team's achievements in all aspects of the technology development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LBNL CRADA (FP00009949) with the American Public Power Association: Electricity Reliability Metrics, Analysis, and Planning (Final Technical Report)

LBNL and APPA (the team) jointly examined the extent to which differences in distribution feeder characteristics are correlated with differences in their reliability performance when exposed to three different types of natural hazards (wildlife, weather, and vegetation). The team employed data-driven approaches to quantify the relationships between various measures of feeder reliability and a suite of feeder characteristics individually and jointly via a statistically-based clustering method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electricity Reliability Metrics, Analysis, and Planning (CRADA Final Report)

LBNL and APPA (the team) jointly examined the extent to which differences in distribution feeder characteristics are correlated with differences in their reliability performance when exposed to three different types of natural hazards (wildlife, weather, and vegetation). The team employed data-driven approaches to quantify the relationships between various measures of feeder reliability and a suite of feeder characteristics individually and jointly via a statistically-based clustering method. The team developed suggestions on how comparisons across groupings of feeders and review of the relative contributions of the constituents of SAIFI and SAIDI could be used to help prioritize utility actions to improve reliability. However, they also caution that their suggestions require further evaluation because they are based on only one year of information from a modest number of small utilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of distributed compute resources utilization in the CMS Global Pool

The CMS Submission Infrastructure is the primary system for managing computing resources for CMS workflows, including data processing, simulation, and analysis. It integrates geographically distributed resources from Grid, HPC, and cloud providers into federated pools managed by HTCondor and Glidein- WMS, for a total of around 500k CPU cores. This system dynamically manages workloads based on priorities defined by the collaboration. Additionally, CMS scheduling strategies must be flexible to handle multiple concurrent workloads while considering changing processing demands and resource availability from various providers.Efficient utilization of vast amounts of distributed compute resources is a key element for the success of the scientific programs of the LHC experiments. Optimizing the system is essential to maximize resource efficiency and fully utilize the distributed computing power. The CMS Submission Infrastructure team thus systematically investigates sources of inefficiency in workload scheduling to reduce their impact. In addition, a strategy of pilot overloading has been introduced to compensate for other inefficiency sources, thereby optimizing resource utilization and enhancing computational throughput.

Mascheroni, Marco [UC, San Diego (main)]↗

An Update on the Geothermal Data Repository's Data Standards and Pipelines: Geospatial Data and Distributed Acoustic Sensing Data

The Department of Energy's (DOE) Geothermal Data Repository (GDR) team has implemented or is currently implementing data standards and automated data pipelines for the following geothermal data types: 1) drilling data, 2) geospatial datasets, and 3) Distributed Acoustic Sensing (DAS) data. These data standards and pipelines are intended to improve the real-world applicability of geothermal machine learning outputs through improving the quality of data. More specifically, through standardizing high-value datasets, the GDR is reducing project-specific data curation requirements, allowing more time to be spent on actual research. By automating this process, the burden of standardization is taken off of the user, overall increasing the availability of standardized data. This paper provides an update on the GDR's transition toward data standardization through automated data pipelines and calls for feedback from the community on how the GDR team can improve this process.

cloud-optimized↗

Robust Real-Time Modeling of Distribution Systems with Data-Driven Grid-Wise Observability (Final Technical Report)

The overall objective of this project is to leverage existing and emerging sensor measurements to develop data-driven observability enhancement algorithms as well as robust state estimation and parameter identification techniques to enable real-time grid-wise monitoring and modeling of loads and distributed energy resources (DERs). The project resulted in a holistic framework with the following key components: 1) data-driven and machine learning-based grid-edge visibility enhancement, 2) robust branch-current-based state estimation (BCSE), and 3) robust real-time steady-state and dynamic-state modeling of loads and DERs. The research outcomes have provided utility companies better network visibility, higher-fidelity load/DER models, and more accurate assessment of DERs’ impacts, thus, facilitating the integration of renewable energy sources. The synergistic collaborative project among Iowa State University (ISU), Argonne National Laboratory (ANL), Electric Power Research Center (EPRC), SIEMENS Industry, Alliant Energy, Cedar Falls Utilities (CFU), and Maquoketa Valley Electric Cooperative (MVEC) to leverage the team’s extensive expertise and experience in power distribution systems, state estimation, online modeling and identification, and DER integrations. The proposed frameworks have been verified with industry adopted software and attempted integrated with existing tool wherever possible

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Solar System (Final Scientific/Technical Report)

GTI Energy (GTI) teamed with the University of California at Merced (UCM) to scaleup the hybrid solar system (HSS) technology for demonstrating its performance at the US Gypsum (USG) plant in Plaster City, California. The technology integrates two-stage concentrating solar collector with matching particle thermal transport and storage (TSS) system to deliver cost-effective, and on-demand distributed high temperature industrial process heat up to 600°C with solar thermal, in this case to a gypsum kettle, to reduce its fuel use and carbon footprint. Current solar technologies, which reach these temperatures, are not distributable (towers) or cost-effective (dish). The research team developed a conceptual system design for host site retrofit, including preliminary heat balance, process flow diagram, particle to process heat exchanger and equipment placements at the site. Subsequently, parallel efforts were carried out at UCM to design, build and test a 12 m long commercial scale prototype concentrating thermal-only collector system and at GTI to design, build and test a matching 650°C capable particle TTS system. The nominal 50 kWth collector consists of a parabolic trough and three 4 m long two-stage receivers in series. Prior to on-sun testing, a 4 m long receiver was fabricated and successfully tested at 650 °C in a laboratory setting for 100 hrs of continuous operation showing less than 15% radiation loss. A 7 m wide x 17 m long parabolic trough was then installed at UCM for on-sun testing of the 12 m long receiver, and concurrently several 4 m long receivers were built. The optics of the parabolic trough were calibrated, and on-sun test were carried out on 12 m long receivers. During tests, the intense solar radiation (53x) caused the absorber tubes in the receivers to bend, reducing the overall optical efficiency. To address the bending issue, a self-consistent algorithm that includes ray tracing, thermal and deformation models was developed to perform thermal stress analysis on absorbers for parabolic solar collectors. Results obtained with this algorithm showed a dramatic rise in deformation as absorber tube length increases. A combined efficiency parameter that includes the occluded area for the mounts was developed to obtain an optimized tube length obtained. Based on the results, a length of 2.7 m for the absorber + 0.2 m for the coupler was chosen to minimize any bending and optimize optical efficiency while maintaining ease of mounting. The associated particle TTS system was designed, built and successfully tested at GTI. It includes storage, receiving and lock hoppers and piping that simulates the transfer of captured solar energy to an actual industrial furnace. Tests over 77 charge-discharge cycles demonstrated <2% particle degradation, with no problematic particle accumulations and no flow interruptions. The piping pressure drop was about 5 psi. The team also worked with Stanley Consultants (Stanley) to prepare conceptual and preliminary engineering packages to facilitate follow-on development and commercialization efforts. These include process and instrumentation diagram’s (P&ID’s), general arrangements, electrical one-line, project definitions document, equipment data sheets, schedule, and construction cost estimate for 2 MWth system. Updated HSS technology commercialization and customer engagement plans and detailed costs and evaluated market trade-offs and manufacturing.

03 NATURAL GAS↗

Basin and Range Investigation for Developing Geothermal Energy: Exploration Data

This data package includes exploration material from the Basin & Range Investigation for Developing Geothermal Energy [in Hidden Systems] project (BRIDGE), which is part of a broader initiative to advance the exploration of hidden geothermal resources in the Basin & Range Province of the western U.S. Data modalities include a helicopter-borne time-domain electromagnetic survey, magnetotellurics, 2-meter temperature measurements, ground-based gravity and legacy aeromagnetic surveys, geochemistry, geologic mapping, LiDAR analysis, 3D models, associated geospatial data, and a bibliography of existing data and references utilized in prospect characterization and conceptual modeling. Key files are in CSV, Geosoft, and Geotools formats. Please refer to READMEs for dataset-specific information. Where applicable, acquisition data and inversion models for a particular prospect or area of interest are organized separately. This BRIDGE data package is the product of a collaboration led by Sandia National Laboratories with partners from Geologica Geothermal Group, Inc., the U.S. Navy Geothermal Program Office, and consultants Steven Sewell (Australis Geoscience Ltd) and William Cumming (Cumming Geoscience). The project's areas of interest (AOIs) are based off priority areas of interest in the southwestern portion of the Nevada Play Fairway map, distribution across tectonic provinces, accessibility, and the project team's extensive experience in the region. AOIs cover about a dozen basins that include unexplored prospects, partially explored prospects, and some developed analogue resources that provide validation cases. Many unexplored and partially explored prospects are on U.S. Department of Defense (DoD) land, though adjacent lands are included as well.

15 GEOTHERMAL ENERGY↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Regulatory Road Map for Distributed Energy Resource (DER) Interconnection and Interoperability

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, participants from Colombia's Energy and Gas Regulatory Commission (CREG) leveraged their training and professional experience to develop a regulatory roadmap for the interconnection and interoperability of increasing integration of distributed energy resources (DERs). CREG was one of four teams selected by the training program development team to receive continued technical assistance and strategic advisory support from the USAID-NREL Partnership for action plan development and implementation. This case study provides an overview of the key activities and outcomes of the technical assistance provided by NREL on the CREG Action Plan, and key next steps for implementation of Colombia's DER Integration Regulatory Roadmap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Community Resilience Through Rapid Restoration Leveraging Distributed Energy Resources (DERs) and Low-Cost Sensors

Equitable and automated bottoms-up power restoration following an extreme event will be demonstrated at a site in Puerto Rico. To do so, the team will develop enhanced grid situational awareness techniques integrating behind-the-meter (BTM) distributed energy resources (DER) discovery, impedance sweeping based outage boundary detection, and feasible restoration path identification algorithms. Resilience metric will be developed and incorporated along with situational awareness information in a distributed Model Predictive Control (MPC)-based restoration optimization algorithm to control and mobilize grid assets. These algorithms will be validated through power hardware-in-the-loop experiments and ultimately, a site demonstration to show that outage recovery time and total recovered load could be improved by >20% over the baseline.

24 POWER TRANSMISSION AND DISTRIBUTION↗