At least 37 records · Page 2

Real-time dispatch optimization for concentrating solar power with thermal energy storage

Concentrating solar power (CSP) plants present a promising path towards utility-scale renewable energy. The power tower, or central receiver, configuration can achieve higher operating temperatures than other forms of CSP, and, like all forms of CSP, naturally pairs with comparatively inexpensive thermal energy storage, which allows CSP plants to dispatch electricity according to market price incentives and outside the hours of solar resource availability. Currently, CSP plants commonly include a steam Rankine power cycle and several heat exchange components to generate high-pressure steam using stored thermal energy. The efficiency of the steam Rankine cycle depends on the temperature of the plant's operating fluid, and so is a main concern of plant operators. However, the variable nature of the solar resource and the conservatism with which the receiver is operated prevent perfect control over the receiver outlet temperature. Therefore, during periods of solar variability, collection occurs at lower-than-design temperature. To support operator decisions in a real-time setting, we develop a revenue-maximizing non-convex mixed-integer, quadradically-constrained program which determines a dispatch schedule with sub-hourly time fidelity and considers temperature-dependent power cycle efficiency. The exact nonlinear formulation proves intractable for real-time decision support. Here we present exact and inexact techniques to improve problem tractability that include a hybrid nonlinear and linear formulation. Our approach admits solutions within approximately 3% of optimality, on average, within a five-minute time limit, demonstrating its usability for decision support in a real-time setting.

14 SOLAR ENERGY↗

Research Highlight - Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

We highlight our work from our previous publication titled "Dispatch Optimization, System Design, and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage" published in MDPI Energies 2022 (doi.org/10.3390/en15103599). Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

97 MATHEMATICS AND COMPUTING↗

Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

25 ENERGY STORAGE↗

Performance analysis of integrated Nuclear-Solar Energy system sharing same molten salt thermal energy storage

Advanced nuclear reactors may be deployed with integrated thermal energy storage to improve flexibility and maximize revenue. This presents opportunities for thermal integration with concentrating solar power (CSP) to generate component synergies and/or improve performance. Here in this study, a computational model is developed for an integrated nuclear and CSP system that both share the same molten salt thermal energy storage (TES). Optimized dispatch schedules are developed subject to various market conditions, and the ratio of the nuclear to CSP thermal output is also varied. Performance of the combined system is compared to separate nuclear and solar plants, to determine if there is an overall benefit that can be derived from sharing the TES. Given sufficient volatility in electricity prices (e.g., under CAISO market conditions), synergies of up to 8% in net revenue are observed as a result of sharing the same TES, primarily due to improved revenue from enabling operation of the turbine closer to its design point, as well as being able to better take advantage of higher electricity prices. The synergy benefits are largest when the nuclear and solar plants have similar thermal output. However, when prices are less volatile the opposite behavior can be observed and it can be preferable to operate the nuclear plant as a baseload generator.

14 SOLAR ENERGY↗

Efficient prediction of concentrating solar power plant productivity using data clustering

Concentrating solar power (CSP) plants convert solar energy to electricity and can be deployed with a thermal storage capability to shift electricity generation from time periods with available solar resource to those with high electricity demand or electricity price. Rigorous optimization of plant design and operational strategies can improve the market-competitiveness and commercial viability; however, such optimization may require hundreds of annual performance simulations, each of which can be computationally expensive when including considerations such as optimization of dispatch scheduling, sub-hourly time resolution, and stochastic effects due to uncertain weather or electricity price forecasts. This paper proposes a methodology to reduce the computational burden associated with simulation of electricity yield and revenue for CSP plants over a single- or multi-year period. Data-clustering techniques are employed to select a small number of limited-duration time blocks for simulation that, when appropriately weighted, can reproduce generation and revenue over a single year or within each year of a multi-year period. After selection of appropriate data features and weighting factors defining similarity between time-series profiles, the methodology captured annual revenue within 2.3%, 1.7%, or 1.2% using simulation of 10, 30, or 50 three-day exemplar time blocks, respectively, for each of three single-year location/weather/market scenarios and five plant configurations ranging from low to high solar multiple and storage capacity. When applied to multi-year datasets, the proposed methodology can capture inter-year variability that is unavailable from typical meteorological year (TMY) datasets while simultaneously requiring simulation of less than a single year of data.

14 SOLAR ENERGY↗

Atikokan Digital Twin: Machine learning in a biomass energy system

The Atikokan Generating Station, operated by Ontario Power Generation, has a 200 MW, biomass-fired tower boiler that operates on a dispatch schedule with a five-minute cycle. The boiler is generally operated in the range of 40–100 MW using two of five burner levels. In order to optimize boiler performance, we propose the implementation of a unique digital twin. Our digital twin abstraction couples Bayesian inference from science-based models and from observations (machine learning) with decision theory to predict operating-variable set points that optimize the physical asset (the boiler) in the presence of uncertainty (artificial intelligence). We focus this paper on the continuous Bayesian machine learning part of the Atikokan Digital Twin; we discuss decision theory in a companion paper. We identify and learn about 12 operational, model, and measured-output parameters and their uncertainties from high-fidelity, science-based simulations of the Atikokan boiler and from the observed measurements at the power plant. Since the goal of the Atikokan Digital Twin is to implement it online in real time, we require fast function evaluations for the quantities of interest extracted from the simulations in the Bayesian analysis. We use Gaussian process regression/interpolation to create accurate, robust surrogate models. We define the Bayesian priors and likelihood function and solve for the posterior distributions of the 12 parameters. Here we then propagate these distributions (i.e., parameters with uncertainty) into the predicted distributions of 790 quantities of interest to learn about the relative importance of various sources of error including experimental, model, and operating-parameter errors.

09 BIOMASS FUELS↗

Optimal economic dispatch policy for prosumer with energy storage considering self-consumption demand

This paper analyzed the effects of self-consumption demand on the joint economic dispatch of prosumers (energy consumers who are also producers), particularly for prosumers with both energy storage and distributed energy sources (DERs). Studies in the existing literature on the economic dispatch scheduling policy of energy storage, mostly from the perspective of electricity merchants, do not address the impacts of self-consumption demand. However, due to the intermittent and high levels of uncertainty regarding DERs generation and the dynamic demand of the prosumer, production and consumption are not always simultaneous; there are two possible scenarios in each period depending on whether DERs generation can meet prosumers' self-consumption or not. Incorporating the self-consumption demand will pose modeling challenges since these two scenarios cannot occur simultaneously in each period, and different scenarios require different decisions for prosumers. Further, this paper analyzed the two scenarios separately to find the optimal storage scheduling strategy, and the results were combined to get the optimal global solution. We focused on prosumers' economic decision-making while considering self-consumption demand and the physical constraints of a battery based on dynamic programming. Our study showed that the feasible state of charge (SOC) range of storage can be segmented into several sub-ranges by SOC reference points under the above two scenarios. As a result, a prosumer's optimal scheduling can be uniquely and conveniently selected based on the sub-ranges within which the current SOC falls. The results, therefore, provided multistage decision-making guidance for prosumers with energy storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rethinking the Price Formation Problem–Part 1: Participant Incentives under Uncertainty

Operators of organized wholesale electricity markets attempt to form prices in such a way that the private incentives of market participants are consistent with a socially optimal commitment and dispatch schedule. In the U.S. context, several competing price formation schemes have been proposed to address the non-convex production cost functions characteristic of most generation technologies. Here, this paper considers how the design and analysis of price formation policies for non-convex markets are affected by the uncertainty inherent in electricity demand and supply. We argue that by excluding uncertainty, the analytical framework underlying existing policies mischaracterizes the incentives of market participants, leading to inefficient price formation and poor incentives for flexibility. We establish favorable theoretical properties of a new construct, ex ante convex hull pricing , and demonstrate the difference between this idealized benchmark and existing methods on a large-scale test system. Given increased operational uncertainty with a transition to wind and solar generation, distortions caused by poor incentives for flexibility are likely to grow without improved price formation in organized wholesale markets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Managed Charging: Forward-Looking Estimates of Bulk Power System Value

When and where electric vehicle charging occurs has significant implications for power systems supporting widespread electric vehicle deployment with high shares of wind and solar generation. Numerous studies have estimated the value of scheduling or otherwise managing electric vehicle charging in such power systems. This study improves on those earlier works by leveraging detailed simulation models for electric vehicle adoption, electric vehicle use, electric vehicle charging, and bulk power system operations; and linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This study closely analyzes electric vehicle managed charging (EVMC) performance along the dimensions of flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and participation rate, under the assumptions of ubiquitous chargers and all trips completed on time. The study is located in a passenger light-duty vehicle adoption scenario with 100% electric vehicle sales by 2035, and in an envisioned 2038 New England power system for which within-region generation is 84% clean.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗

Valuing EV Managed Charging for Bulk Power Systems

When and where electric vehicle (EV) charging occurs has significant implications for power systems supporting widespread EV adoption, especially with high shares of wind and solar generation. This study extends previous works by leveraging detailed simulation models for EV adoption, EV use, EV charging, and bulk power system operations, and by linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This technical potential study focuses on how the value of EV managed charging (EVMC) changes depending on charging flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and managed charging participation rate. We show that naively aggregating EV charging flexibility from individual vehicles into megawatt-scale resources grossly overestimates the flexibility of the fleet, because such aggregate models can unrealistically pair, e.g., one already-fully-charged vehicle's ability to increase load with another already-charging vehicle's ability to accept more charge, effectively requesting a charging rate that is infeasible for the latter vehicle. We find per-vehicle bulk system value is highest at low participation rates for all dispatch mechanisms. Factoring in production cost savings, avoided firm capacity savings, and combustion-related power sector emissions savings, we estimate the value of EVMC at low participation rates (5%) to be $33/vehicle-year to $69/vehicle-yr for within-session charging flexibility and $40/vehicle-yr to $120/vehicle-yr for within-week charging flexibility in an envisioned 2038 New England power system and monetary value reported in 2016 U.S. dollars. At 100% participation, per-vehicle value declines to $25/vehicle-yr to $31/vehicle-yr for within-session charging flexibility and to $29/vehicle-yr to $36/vehicle-yr for within-week charging flexibility; however, 100% participation yields the highest total system savings.

ADVANCED PROPULSION SYSTEMS↗

A Combined Day-ahead and Real-time approach for Scheduling Real and Reactive power dispatch of Battery Energy Storage System

A combined day-ahead (look-ahead) and real-time optimization approach is proposed to schedule BESS real and reactive power dispatch. The look ahead scheduling agent maximizes profit and essentially performs the function of energy arbitrage by looking at forecasted prices, network constraints and BESS operating conditions to generate real power dispatch schedule. While this schedule is followed, the real time optimization agent computes an optimum reactive power set-point (for a particular objective function) using optimal power flow framework. The concepts are implemented by co-simulating legacy tools and demonstrated on a large real world distribution system. In addition to the profits from energy arbitrage, optimum reactive power set point computation results in achieving desirable network attributes like flat voltage profiles and minimizing voltage deviations from desired value.

Bhatti, Bilal A.↗

Optimizing dispatch for a concentrated solar power tower

Concentrating solar power (CSP) systems employ a sophisticated thermal receiver, power cycle, and a heliostat field, comprised of thousands of mirrors spread over hundreds of acres of land, and are most cost-effective with relatively large quantities of energy storage which can be scheduled for dispatch. We exercise an existing optimization model that maximizes revenue over a year-long time horizon, solved using a standard 48-h look-ahead policy at hourly fidelity on a CSP system under development in California. The system employs molten salt power tower technology with a 150 MWe (net) turbine, eight hours of thermal storage at full load, and a solar field that provides 1.75 times the rated turbine thermal power. The model considers system configuration and interoperability aspects, such as storage tank size, production capacities, and ramp rates, and determines decisions that expedite financing, permitting, and plant design. Relative to results achieved via industry practice, the existing optimization model reduces the number of power cycle (i.e., turbine) start-up events by 86.4%, thereby improving net revenue by more than 8.5% annually; this corresponds to an approximately $140 M increase in net revenue over the lifetime of the plant, taking a step towards advancing the long-term economic viability of large-scale renewable energy systems. Sensitivity analysis on uncertain parameter values provides insight regarding those values that influence profit most significantly.

14 SOLAR ENERGY↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dispatch Manager for NEML2 Constitutive Model Calculations Embedded in MOOSE

This report describes the extended capabilities of the NEML2 constitutive modeling library, including a flexible and efficient work dispatching system designed to leverage both CPU and GPU resources. This enhancement addresses one of the primary computational challenges in large-scale simulations: the ability to distribute and execute batches of material model evaluations across heterogeneous computing devices. The new dispatch system introduces a modular set of dispatcher and scheduler classes that coordinate the flow of data and execution between devices. The dispatcher is responsible for efficiently packaging work, managing device-specific memory operations, and synchronizing results. This modularity allows for extensibility, making it straightforward to integrate additional computing backends in the future. From an implementation standpoint, the dispatcher system interfaces seamlessly with NEML2's existing models. They handle device-aware tensor operations, optimize memory transfers, and support asynchronous execution when applicable. This design ensures that batches of material points can be evaluated concurrently, substantially improving throughput compared to previous single-device or serial implementations. These improvements not only enhance the raw performance of NEML2 but also improve its usability in multiscale and high-fidelity simulations, where the simultaneous evaluation of large material point batches is critical. Benchmarks included in the report demonstrate the system’s scalability, highlighting its effectiveness when leveraging modern GPU architectures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Toward a Synthetic Model for Distribution System Restoration and Crew Dispatch

Distribution service restoration (DSR) is critical for improving the resilience and reliability of modern distribution systems by strategically and sequentially energizing the system components and customer loads. Restoring electricity service to affected customers also requires multiple crews with different skill sets to perform multiple tasks that are procedurally interdependent with safety guaranteed. However, in existing DSR practices, switch operations and crew dispatch are scheduled separately, and their interdependence is not fully considered. As advanced technologies are enabling remote communication, control, and dispatch, utilities now desire an integrated DSR framework to achieve seamless coordination among multiple DSR tasks such as switch operation, crew dispatch, and component repair. In this paper, we introduce a synthetic model that integrates the service restoration model and the crew dispatch model based on a universal routing model. The proposed model can provide the estimated time of restoration for each load, the switching sequence for safely operating remotely/manually operated switches, and dispatch solutions for crews with different skill sets. The proposed synthetic model is formulated as a mixed-integer linear programming model, and its effectiveness is evaluated via the IEEE 123 bus test feeder and several large-scale test feeders (EPRI Ckt5, Ckt7, Ckt24, and IEEE 8500 node test feeder.