Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Overview of LWR Accident Tolerant Fuel Development in the United States

The U.S. Department of Energy (DOE) has conducted research and development (R and D) for enhanced, accident tolerant fuels (ATF) for light water reactors (LWRs) since 2012. The recently released Road-map to Congress for 'Development of Light Water Reactor Fuels with Enhanced Accident Tolerance' establishes the attributes that are desired for fuels that will exhibit enhanced accident tolerance and defines a path forward for the necessary R and D activities that will result in a lead fuel rod (LFR) or assembly (LFA) insertion in an operating, commercial LWR by 2022 to demonstrate the possibility of these advanced technologies. The aggressive development timeline is directed by Congressional language in the Senate Appropriations Committee Report (Senate Report 112-75), included in the Fiscal Year (FY) 2012 Energy and Water Development Appropriations Bill. ATF development is intended to be impactful to the current fleet of LWRs and future Generation III+ reactors. The development, future licensing and utility adoption of ATF technology will empower development of advanced technologies with safety significance. The work has progressed significantly since 2012, with multiple fuel and cladding concepts currently undergoing fundamental R and D including in-pile irradiation and out-of-pile testing to measure fundamental properties and to demonstrate performance under expected conditions. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Adaptive Planning: Understanding Organizational Workload to Capability/ Capacity through Modeling and Simulation

In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.

Hase, Chris↗

NASA Crew Health & Performance Capability Development for Exploration: 2021 to 2022 Overview

Radiation, reduced gravity, distance from earth, isolation and confinement, and habitation within artificially created and controlled life support environments are hazards that present risk to human space explorers. In many cases, research is required to characterize those risks and help identify risk mitigation strategies. Where new capabilities are necessary to maintain crew health and performance (CHP) during exploration missions, a multi-step process is followed: 1) a Capability Gap is defined; 2) a plan or “roadmap” to develop that capability is established based on agency priorities and anticipated mission development timelines; and 3) work defined on the roadmap is then initiated as resources allow, with the objective that the capability will be available in time to support the future mission. Over the past year, significant progress has occurred in CHP technology development, ground testbed development, ground-based testing, and in preparations for ISS technology demonstrations. This paper provides a development update in the following capability areas: crew health countermeasures, EVA physiology and performance, food and nutrition, exploration medical capabilities, and radiation. Project overviews will include descriptions of CHP development activities over the past year, the human system risks and capability gaps being targeted, as well as planned follow-on activities and anticipated program infusion points.

Andrew F J Abercromby↗

The U.S. Fusion Materials Community Roadmap: Near-term research priorities for the development of plasma-facing and structural materials for fusion power plants

In response to the needs of a rapidly growing private fusion industry, the U.S. Fusion Materials Coordinating Committee (FMCC) and the broader U.S. fusion materials research community undertook an extensive effort to create a comprehensive roadmap for fusion materials development. The result of this effort was the U.S. Fusion Materials Community Roadmap (US-FMCR), which describes the steps needed to advance the technical maturity of leading candidates for plasma-facing materials and structural materials for fusion power plants from laboratory-scale experiments to a point of sufficient technological readiness for industrial adoption and implementation. However, researchers face significant resource constraints as well as very aggressive pilot plant development timelines. Thus, the research strategies detailed in the US-FMCR require further assessment to downselect the specific tasks that must be prioritized within the next two to three years, in order to make the most efficient use of funding, human resources, and experimental facilities. This paper presents an overview of the US-FMCR and its development process. We also present the subset of research objectives that the FMCC identified as the most urgent research priorities for the U.S. fusion materials research community. The state-of-the-art of materials research is also highlighted for each class of materials considered in the US-FMCR. The recommendations presented here integrate an extensive evaluation of the current status of fusion materials research with a broad cross-section of opinion from the wider U.S. fusion community.

Ferry, Sara [Massachusetts Institute of Technology↗

EVA Task Timing and Timeline Planning

EVA timeline development occurs using task execution data generated through underwater training and simulation. This project collected task time data during final training events for several Space Shuttle and International Space Station missions and compared like task time data collected during on-orbit execution. Analysis was performed to compare types of activities and times required for each looking specifically for how activities can be accurately trained from a timeline planning perspective. The data revealed two significant aspects of flight timeline planning; Zero-g task times will match training times for activities that can be accurately simulated with appropriate fidelity hardware; and not all activities can be simulated sufficiently to produce training task times that will reflect required zero-g times. An approach for timeline planning utilizing this knowledge is also presented.

Looper, Christopher A.↗

Tracking the Short Term Planning (STP) Development Process

Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

Price, Melanie↗

Continuation of advanced crew procedures development techniques

An operational computer program, the Procedures and Performance Program (PPP) which operates in conjunction with the Phase I Shuttle Procedures Simulator to provide a procedures recording and crew/vehicle performance monitoring capability was developed. A technical synopsis of each task resulting in the development of the Procedures and Performance Program is provided. Conclusions and recommendations for action leading to the improvements in production of crew procedures development and crew training support are included. The PPP provides real-time CRT displays and post-run hardcopy output of procedures, difference procedures, performance data, parametric analysis data, and training script/training status data. During post-run, the program is designed to support evaluation through the reconstruction of displays to any point in time. A permanent record of the simulation exercise can be obtained via hardcopy output of the display data and via transfer to the Generalized Documentation Processor (GDP). Reference procedures data may be transferred from the GDP to the PPP. Interface is provided with the all digital trajectory program, the Space Vehicle Dynamics Simulator (SVDS) to support initial procedures timeline development.

Arbet, J. D.↗

Screening and evaluation of biomass upgrading strategies for sustainable transportation fuel production with biomass-derived volatile fatty acids

Biomass conversion to fuels and chemicals is crucial to decarbonization, but choosing an advantageous upgrading pathway out of many options is challenging. Rigorously evaluating all candidate pathways (process simulation, product property testing) requires a prohibitive amount of research effort; even simple upgrading schemes have hundreds of possible permutations. We present a method enabling high-throughput screening by approximating upgrading unit operations and drop-in compatibility of products (e.g., fuel properties) and apply it to volatile fatty acid (VFA) conversion to liquid transportation fuels via a MATLAB script, VFA Upgrading to Liquid Transportation fUels Refinery Estimation (VULTURE). VULTURE selects upgrading configurations that maximize fuel blend bio-derived content. We validate VULTURE's approximations through surrogate fuel property testing and process simulation. Techno-economic and life cycle analyses suggest that VFA upgrading processes down-selected by VULTURE are profitable and have low carbon intensities, demonstrating the potential for the strategy to accelerate process development timelines at decreased costs.

09 BIOMASS FUELS↗

Transitioning Rationally Designed Catalytic Materials to Real 'Working' Catalysts Produced at Commercial Scale: Nanoparticle Materials

Catalyst design, from idea to commercialization, requires multi-disciplinary scientific and engineering research and development over 10-20 year time periods. Historically, the identification of new or improved catalyst materials has largely been an empirical trial-and-error process. However, advances in computational capabilities (new tools and increased processing power) coupled with new synthetic techniques have started to yield rationally-designed catalysts with controlled nano-structures and tailored properties. This technological advancement represents an opportunity to accelerate the catalyst development timeline and to deliver new materials that outperform existing industrial catalysts or enable new applications, once a number of unique challenges associated with the scale-up of nano-structured materials are overcome.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

High-energy x-ray scattering studies of battery materials

High-energy x-ray (HEX) scattering is a sensitive and powerful tool to nondestructively probe the atomic and mesoscale structures of battery materials under synthesis and operational conditions. The penetration power of HEXs enables the use of large, practical samples and realistic environments, allowing researchers to explore the inner workings of batteries in both laboratory and commercial formats. This article highlights the capability and versatility of HEX techniques, particularly from synchrotron sources, to elucidate materials synthesis processes and thermal instability mechanisms in situ, to understand (dis)charging mechanisms in operando under a variety of cycling conditions, and to spatially resolve electrode/electrolyte responses to highlight connections between inhomogeneity and performance. Such studies have increased our understanding of the fundamental mechanisms underlying battery performance. Here, by deepening our understanding of the linkages between microstructure and overall performance, HEXs represent a powerful tool for validating existing batteries and shortening battery-development timelines.

25 ENERGY STORAGE↗

Additive Manufacturing of Tooling for Refrigeration Cabinet Foaming Processes

The primary objective of this project was to leverage the Big Area Additive Manufacturing (BAAM) process and materials into a long term, quick change tooling concept to drastically reduce product lead and development timelines and costs. Current refrigeration foam molds are complicated to manufacture involving casting several aluminum parts in an approximate shape, machining components of the molds and post fitting and shimming of the parts in an articulated fixture. The total process timeline can take over 6 months. The foaming process is slower than required for production, therefore multiple fixtures, 10 to 27, are required per refrigerator model. Molds are particular to a specific product configuration making mixed model assembly challenging for sequencing, mold changes or auto changeover features. The initial goal was to create a tool leveraging the ORNL materials and additive process to build a tool in 4 to 6 weeks or less. A secondary goal was to create common fixture cores and provide lightweight fixture sections that could be revised in a very short time to increase equipment flexibility reduce lead times, lower the barriers to first production trials, and reduce tooling costs.

3d Printing↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

1000 Soils Pilot Dataset, version 8, May 2025

This record hosts data generated by the 1000 Soils Pilot. Data will be updated as more become available. Please see the most recent data upload for current data. A beta visualization tool is available for some data types at https://shinyproxy.emsl.pnnl.gov/app/1000soils. Please submit any suggestions or comments through the 'contact' tab. We are actively working to improve visualizations and value all feedback. Data completed include: Geochemistry, texture, respiration, and enzyme activities FTICR-MS organic matter chemistry Microbial biomass C and N TOC/TDN of water-extractable OM X-ray computed tomography (derived metrics available here, raw data available upon request) Metagenomes; a variety of data formats are available upon request Soil hydraulic properties Data in progress: LC-MS/MS in development, timeline TBD, inquire for status 1000S_processed_BGC_summary.csv contains all available biogeochemical data; microbial biomass C and N; and TOC/TDN of water-extractable OM; and 1000S_Tomography.xslx contains a summary of data generated via X-ray computed tomography. icr_v2_corems2.csv contains FTICR-MS data processed by CoreMS version 2. These data are merged by formula across instrument runs to enable cross-sample comparisons. Technical replicates are merged by retaining peaks present in 2 out of 3 replicates. 1000Soils_Metadata_Site_Mastersheet_v1.csv contains site information. Soil Hydraulics_corrected_02042025.xlsx contains soil hydraulics information. Readme File_v4.xlsx is the readme file. Please contact the MONet project (monet.emsl@pnnl.gov) or Emily Graham (emily.graham@pnnl.gov) with questions. The following file and all raw data are available upon request: icr_by_mass_for_single_sample_analysis_only.csv contains FTICR-MS data processed by CoreMS and is intended for usage in the calculation of biochemical transformations within samples only. These data are not acceptable for cross-sample comparison of masses because they are from multiple instrument runs. For more information, please see: https://www.emsl.pnnl.gov/monet and https://sc-data.emsl.pnnl.gov/monet Acknowledgment: Soil data were provided by the Molecular Observation Network (MONet) at the Environmental Molecular Sciences Laboratory (https://ror.org/04rc0xn13), a DOE Office of Science user facility sponsored by the Biological and Environmental Research program under Contract No. DE-AC05-76RL01830. The work (proposal: 10.46936/10.25585/60008970) conducted by the U.S. Department of Energy, Joint Genome Institute (https://ror.org/04xm1d337), a DOE Office of Science user facility, is supported by the Office of Science of the U.S. Department of Energy operated under Contract No. DE-AC02-05CH11231. The Molecular Observation Network (MONet) database is an open, FAIR, and publicly available compilation of the molecular and microstructural properties of soil. Data in the MONet open science database can be found at https://sc-data.emsl.pnnl.gov/.

biogeochemistry↗

Space Shuttle flight crew/computer interface simulation studies.

An approach to achieving an optimized set of crew/computer interface requirements on the Space Shuttle program is described. It consists of defining the mission phases and crew timelines, developing a functional description of the crew/computer interface displays and controls software, conducting real-time simulations using pilot evaluation of the interface displays and controls, and developing a set of crew/computer functional requirements specifications. The simulator is a two-man crew station which includes three CRTs with keyboards for simulating the crew/computer interface. The programs simulate the mission phases and the flight hardware, including the flight computer and CRT displays.

Callihan, J. C.↗

Space construction and utility distribution

Technology advancement to effect an orderly development program leading to construction of space platforms was defined, in a program that utilized a viable platform and service module concept with concise OSS/OAST mission and payload models. Consideration was given to concepts for alternate platform servicing of the payloads described in the model. Using the baseline configuration, issues pertinent to platform development as well as orbit emplacement and operation and on orbit construction methodology were analyzed. These analyses provided the following data: (1) payload definitions and installation options; (2) identified structural and subsystems options; (3) developed integrated platform system concepts; and (4) identified technology deficiencies and recommended technology development timelines.

Bloom, K. A.↗

STS-1 operational flight profile. Volume 5: Descent, cycle 3

The trajectory data presented are to be used for orbiter systems and subsystems evalation, flight and mission control center software verification, flight techniques and timeline development, crew training, and evaluation of operational mission suitability. The entry profile is very similar to cycle 2, however, elevon and body flap temperature margins have increased and the elevon schedule was changed. The terminal area energy management (TAEM) profile was completely reshaped to conform with new angle of attack constraints and left hand turn around the heading alignment cylinder. Also, the entry/TAEM interface was adjusted to minimize guidance induced angle of attack transients across the interface. The approach and landing phase was reshaped for a 20 deg glideslope and reduced velocity at touchdown. The definition of the runway threshold was standardized for all landing sites. This results in a shift at Edwards Air Force Base in aim points and touchdown relative to the threshold of 1000 feet. The rollout remains essentially unchanged with the exception of the speedbrake, which is now deployed to 50 percent at touchdown.

Moore, R.↗

A plan for time-phased incorporation of automation and robotics on the US space station

A plan for the incorporation of Automation and Robotics technology on the Space Station is presented. The time phased introduction of twenty two selected candidates is set forth in accordance with a technology development forecast. Twenty candidates were chosed primarily for their potential to relieve the crew of mundane or dangerous operations and maintenance burdens, thus freeing crew time for mission duties and enhancing safety. Two candidates were chosen based on a potential for increasing the productivity of laboratory experiments and thus directly enhancing the scientific value of the Space Station. A technology assessment for each candidate investigates present state of the art, development timelines including space qualification considerations, and potential for technology transfer to earth applications. Each candidate is evaluated using a crew workload model driven by crew size, number of pressurized U.S. modules and external payloads, which makes it possible to assess the impact of automation during a growth scenario. Costs for each increment of implementation are estimated and accumulated.

Purves, R. B.↗