Simulating Buildings While the Design is Still in the Architect's Imagination
Very early in the design process, prior to drawing a single line, architects get information from their client or prospective client trying to understand the nature and requirements of the building that needs to be designed. The design of the building is completely fluid, as the architect considers many options in their imagination. The overall massing of the building, the general shape and form, are being considered during this early step. Even for a simple box-shaped building, the aspect ratio between the east-west and the north-south dimensions of the building can greatly impact energy consumption due to daylighting availability. The prevailing winds and building orientation can impact natural ventilation. The locations of high and low population density spaces can also impact energy use. Deciding the floor area per office workstation or the size of the auditorium will impact energy use. Does making a building two stories instead of one reduce energy impacts by reducing roof area or does the additional volume for stairs and elevators result in more energy use. Since certain types of spaces require more windows for occupants than others, the locations of those spaces will determine how much glazing each building orientation has impacting daylighting as well as heating and cooling energy. The project was an attempted first step toward creating a system tailored toward architects for this very early stage in the design process to help them understand the energy impacts of design options. The approach was not to be based on drawing the building, and instead, the main inputs would have been the size of each type of space in the building. This report describes information gathered during the development that might be of use to others developing similar software as well as some of the software that was developed during the project. Phase II funding to continue this work was not pursued due to intellectual property issues discovered during the development of the commercialization plan.