Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

Robotic Precursor Missions for Mars Habitats

Infrastructure support for robotic colonies, manned Mars habitat, and/or robotic exploration of planetary surfaces will need to rely on the field deployment of multiple robust robots. This support includes such tasks as the deployment and servicing of power systems and ISRU generators, construction of beaconed roadways, and the site preparation and deployment of manned habitat modules. The current level of autonomy of planetary rovers such as Sojourner will need to be greatly enhanced for these types of operations. In addition, single robotic platforms will not be capable of complicated construction scenarios. Precursor robotic missions to Mars that involve teams of multiple cooperating robots to accomplish some of these tasks is a cost effective solution to the possible long timeline necessary for the deployment of a manned habitat. Ongoing work at JPL under the Mars Outpost Program in the area of robot colonies is investigating many of the technology developments necessary for such an ambitious undertaking. Some of the issues that are being addressed include behavior-based control systems for multiple cooperating robots (CAMPOUT), development of autonomous robotic systems for the rescue/repair of trapped or disabled robots, and the design and development of robotic platforms for construction tasks such as material transport and surface clearing.

Huntsberger, Terry↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Challenges of Mars Sample Return Lander Entry, Descent, and Landing

The proposed Mars Sample Return (MSR) campaign would be perhaps the most ambitious robotic mission ever attempted in space exploration. The notional cam-paign consists of three Flagship-class missions operating in cooperation for over a decade in order to return samples of the Martian surface and atmosphere to Earth for analysis. The Mars 2020 rover, scheduled to launch in July 2020, will cache samples and place them on the surface for possible return. The second mission would be a Sample Return Lander (SRL) that consists of a small Sample Fetch Rover (SFR) to gather the samples, a Sample Transfer Arm (STA) to load the samples into a Mars Ascent Vehicle (MAV), and the MAV itself to launch the samples into orbit around Mars. The third mission would be an Earth Return Or-biter (ERO) designed to rendezvous and capture the Orbiting Sample (OS), return to Earth, and separate the Earth Entry Vehicle (EEV) for Entry, Descent, and Landing (EDL) at a location to be determined. This paper will focus on the SRL mission concept, specifically the EDL phase. Given the ambitious SRL sample re-trieval baseline surface mission, including a rocket launch of the samples into Mars orbit, it is estimated that the EDL system may be required to deliver as much as 2100 kg of dry mass to the surface. This represents an approximate 20-25% in-crease in mass capability over previous landed Mars missions. Additionally, there is a high probability that SRL would have to land very close to the samples on the surface to expedite retrieval operations; therefore, Pin Point Landing (PPL) accu-racy may be required. To address these challenges, promising EDL configuration augmentations were studied to include larger forebody/higher drag entry capsules, hypersonic/supersonic inflatable/non-inflatable aerodynamic decelerators, hypersonic trim tabs, ballute drag devices, larger parachutes, higher Mach and higher dynamic pressure parachute deployments, lower parachute deployment altitudes having shorter chute timelines necessitating more efficient terrain sensor strategies, and ad-ditional fuel for longer powered descent diverts to the target landing site. Over-arching the entire trade study was an attempt to stay as close to the experience base of past successful missions as possible to reduce implementation cost and risk. This paper will discuss the entire SRL EDL trade study in detail. The information presented about the potential MSR campaign is pre-decisional and is provided for planning and discussion purposes only.

Ivanov, Mark C.↗

Alfalfa

Alfalfa-based testbeds enable building equipment, control products, and workforce development tools to interact with dynamic building simulations representing the desired building, system, weather, and grid configuration. Alfalfa is used to de-risk implementation of load flexibility prior to field deployment, reducing the costs and timelines associated with adoption of decarbonization technology at the grid edge.

building energy modeling↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

In-space operations for lunar and Mars space transfer vehicles

The objective of this paper is to discuss the in-space operations required to process the lunar and Mars mission vehicles envisioned for the Space Exploration Initiative (SEI). Recent studies, which have examined the degree to which on-orbit operations change as a function of the Earth-to-orbit (ETO) launch vehicle size, identified a common set of on-orbit vehicle processing tasks, and generated functional requirements for in-space processing nodes are summarized in this paper. Timelines for on-orbit processing of two different lunar transfer vehicles (LTV's) were developed to compare a 'current practice,' labor-intensive EVA approach to ones utilizing telerobotics and advanced automation. LTV aerobrake concepts ranging from simple deployment to considerable assembly are compared. Similar timelines for the on-orbit processing of a nuclear Mars transfer vehicle (MTV) are also presented. Aerobrakes can be processed in a timely manner and should not be ruled out for SEI missions. The 'tall pole' time interval for on-orbit vehicle initial processing is the delivery of elements to orbit, not the processing tasks.

Raper, James L., Sr.↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

Future long duration exploration missions (LDEMs) bring new challenges to astronaut crews in deep space, one of which is increased communication latencies with ground stations. As a result, crews will have to behave more autonomously by self-scheduling their own operational timelines in an efficient and effective manner. To support crew autonomy, our team has spent the last few years developing Playbook, a mission planning and scheduling tool. Our research focuses on investigating scheduling performance using Playbook to inform the deployment of novel aids that streamline the timeline creation process and proposing relevant standards and guidelines for autonomous crews in LDEMs. Summarizing yearly progress of research analysis and experiment in HERA.

user experience↗

Weighing the Future: Strategic Options for U.S. Space Nuclear Leadership

We believe in speed, strength, and sovereignty. The government’s job is to unlock private sector investment, not micromanage it. Our approach shifts from endless studies to operational deployment, from bureaucratic gridlock to clear timelines and accountability. If done right, this strategy will unleash private capital, create high-tech American jobs, and put the United States back in the lead, not just in space, but in the future of energy and defense.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Dragonfly: A Case Study in Dynamic Stability Characterization

Next decade, the Dragonfly probe will enter Titan’s atmosphere on a mission to explore and characterize its unique and complex organic chemistry. In contrast to Mars entry missions, where the challenge is to slow down in its tenuous atmosphere before impacting the surface, Titan’s thick atmosphere provides generous drag. However, Titan has its own unique EDL challenges. Among these challenges is the long time (on the order of 90 minutes!) the vehicle will need to descend unguided through flow regimes where blunt-body entry probes are known to be dynamically unstable. This elongated timeline, both prior to drogue parachute deployment, and during the ensuing descent, has the potential to allow adverse dynamic instability properties to produce large amplitude oscillations in angle-of-attack. This, in-turn may lead to non-compliance in vehicle attitude requirements for EDL events such as parachute deployment, and lander release, or in the most extreme case, tumbling of the aeroshell and near-assured loss of mission.

EDL↗

Dragonfly: A Case Study in Dynamic Stability Characterization

Next decade, the Dragonfly probe will enter Titan’s atmosphere on a mission to explore and characterize its unique and complex organic chemistry. In contrast to Mars entry missions, where the challenge is to slow down in its tenuous atmosphere before impacting the surface, Titan’s thick atmosphere provides generous drag. However, Titan has its own unique EDL challenges. Among these challenges is the long time (on the order of 90 minutes!) the vehicle will need to descend unguided through flow regimes where blunt-body entry probes are known to be dynamically unstable. This elongated timeline, both prior to drogue parachute deployment, and during the ensuing descent, has the potential to allow adverse dynamic instability properties to produce large amplitude oscillations in angle-of-attack. This, in-turn may lead to non-compliance in vehicle attitude requirements for EDL events such as parachute deployment, and lander release, or in the most extreme case, tumbling of the aeroshell and near-assured loss of mission.

EDL↗

Mars Science Laboratory: Entry, Descent, and Landing System Performance

In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.

Way, David W.↗

Mars Science Laboratory: Entry, Descent, and Landing System Performance

In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.

Way, David W.↗

2024 OES-Environmental 2024 State of the Science Report, Chapter 6: Strategies to Aid Consenting Processes for Marine Renewable Energy

While the marine renewable energy (MRE) industry has made positive strides in the past decade, challenges remain that stall forward progress, scaling up, and commercialization. For MRE to provide a viable solution to address the effects of climate change and achieve sustainable development and renewable energy goals, identifying and understanding barriers and opportunities to deployment is key. Barriers to date have included long consenting timelines, costly in-depth baseline data collection and monitoring requirements, and hesitancy in some countries to approve device and array deployments (Copping & Hemery 2020; Kramer et al. 2020). Some of the key drivers behind these barriers are 1) uncertainty about potential effects of MRE on marine animals, habitats, and the environment; 2) lack of familiarity with MRE technologies; or 3) challenges accessing available scientific information (Copping et al. 2020a).

16 TIDAL AND WAVE POWER↗

Logistics simulation of a remediation effort for a hypothetical radiological contamination scenario

To mitigate the effects following a large-scale nuclear or radiological material release in an urban environment and to expedite recovery, the Integrated Wash-Aid Treatment Emergency Reuse System (IWATERS) was developed. IWATERS consists of three operations: washing contaminated surfaces with an ionic wash solution, collecting, and treating the contaminated wash solution on-site to remove contaminants, and reusing the treated solution throughout operations to preserve the clean water resource. This study develops a framework to simulate the logistics of IWATERS deployment, thereby gaining an understanding of the timeline for decontamination operations. For this purpose, the Analysis of Mobility Platform and GoldSim were leveraged for a hypothetical contamination scenario covering 65,200 m 2 of an urban center. The framework reveals that remediation progress is limited by several resources, notably the availability of vermiculite, a reactive clay that is required to treat the contaminated wash solution. Further, this study also presents how the simulation approach can be used to characterize alternatives to reduce the influence of limited resources on operational progress. Overall, this work lays the foundation for evaluating different decontamination methods through detailed logistics simulation, i.e., by refining simulation assumptions and expanding the range of scenarios the simulation can depict.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Roadmap for the Completion of the Design and Implementation of a Remote Canister Monitoring System

The Office of Environmental Management within the Department of Energy is currently investigating technical issues associated with extended dry storage (50+ years) of aluminum spent nuclear fuel. As part of these efforts, a remote canister-monitoring system (RCMS) has been proposed to collect the real-time data of the environmental conditions in the canisters used for the dry storage of aluminum spent nuclear fuel in the CPP-603 facility at Idaho National Laboratory (INL). The proposed RCMS would provide the opportunity to evaluate the appropriate technologies for monitoring, to collect canister environment conditions as soon as possible, to verify and validate current laboratory-based study results and analytic modeling approaches, and to potentially identify additional dry storage options for aluminum spent nuclear fuel at the INL Site. The document provides a brief update on the progress that has been made toward deploying the RCMS and will present at a high level, the general system design philosophy behind the project and the key future tasks necessary for the completion of the RCMS system design, fabrication of the RCMS prototype, testing, and eventual deployment of the RCMS, and a tentative timeline for these tasks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗