Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dc distribution network”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Enabling Seamless Integration of EV Charging Infrastructure with Weak Electric Grids

Widespread adoption of Electric Vehicles (EVs) for light, medium, and heavy-duty applications has gained significant interest. Based on ownership and user preferences, light duty and local delivery medium-duty EVs are typically connected to grid distribution networks whereas larger medium duty and heavy-duty EVs are typically connected to distribution or even sub-transmission networks. Challenges with at-scale EVs and charging infrastructure supporting them include interoperability, distribution network upgrades, surge in demand charges, power quality issues, voltage stability, etc. Based on real-world data, steady-state and dynamic assessments of light-duty EV charging with a focus on DC Fast Charging (DCFC) for weak distribution grids is presented. Three main areas of contributions in this paper include - steady state and dynamic power quality measurements and assessments using real world data, transient assessments of light duty EV integration with weak distribution networks (IEEE 13 node feeder system) under grid-connected and microgrid modes, and formulation of an intelligent charging decision algorithm to enable an impact-minimal charging.

actionable intelligence↗

Cost analysis of distributed storage in AC and DC microgrids

Building and microgrid designs with highly-distributed electrical storage have potential advantages over today's conventional topologies with centralized storage. Herein this paper studies the capital cost benefits of several residential behind-the-meter distributed-storage topologies, including AC and DC versions of systems with load-packaged batteries and resilient sub-networks. The study begins by defining the block configuration of each topology. This work then develops a model for the cost of the power electronics necessary to interface with the storage elements. Finally, the analysis develops a model for the total cost of each storage topology, incorporating the installation and soft costs. The results suggest that while the cost of power electronics is lower in centralized topologies, the total cost is lower for distributed storage due to the avoided costs of installation and permitting. This paper also explores the benefits of load-packaged batteries for savings in electrical infrastructure.

25 ENERGY STORAGE↗

Integrated reactor architecture of conductive network and catalytic nodes to accelerate polysulfide conversion for durable and high-loading Li-S batteries

The development of carbon-based heterogeneous framework host with synergistic catalytic and conductive effects for sulfur cathode is a promising strategy to realize high performance lithium sulfur batteries (LSBs). Here, an integrated reactor architecture with defective carbon nodes (IRA-DC) is designed for serving as high-loading (92.4 wt%) sulfur host. The hierarchical porous IRA-DC consists of untangled conductive carbon nanotube network and Co/N co-doped catalytic nodes with high dispersity. Therein the optimization of electric field distribution and homogenization of adsorption-catalysis sites offer the multi-electron conversion reaction of polysulfides with excellent kinetics and stability. The resultant IRA-DC/S cathode enables a high areal capacity of 8.86 mAh cm -2 under ultra-high sulfur loading (13.1 mg cm -2 ) and lean electrolyte (8 μL mg sulfur -1 ). It also displays a long-term cycling performance (1200 cycles at 1 C) and ultrahigh rate performance up to 20 C (with a capacity of 473.6 mAh g -1 ). In conclusion, this work provides an electrode building strategy by optimizing the environments of heterogeneous electrocatalysis and micro electric field to activate the polysulfide conversion efficiency and utilization of high-loading sulfur in monolithic sulfur-carbon cathodes.

25 ENERGY STORAGE↗

Fault location in High Voltage Multi-terminal dc Networks Using Ensemble Learning

Precise location of faults for large distance power transmission networks is essential for faster repair and restoration process. High Voltage direct current (HVdc) networks using modular multi-level converter (MMC) technology has found its prominence for interconnected multi-terminal networks. This allows for large distance bulk power transmission at lower costs. However, they cope with the challenge of dc faults. Fast and efficient methods to isolate the network under dc faults have been widely studied and investigated. After successful isolation, it is essential to precisely locate the fault. The post-fault voltage and current signatures are a function of multiple factors and thus accurately locating faults on a multi-terminal network is challenging. In this paper, we discuss a novel data-driven ensemble learning based approach for accurate fault location. Here we utilize the eXtreme Gradient Boosting (XGB) method for accurate fault location. The sensitivity of the proposed algorithm to measurement noise, fault location, resistance and current limiting inductance are performed on a radial three-terminal MTdc network designed in Power System Computer Aided Design (PSCAD)/Electromagnetic Transients including dc (EMTdc).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Making Better Use of On-Site PV Generation: Direct Distribution of DC Power in Buildings

With the increasing availability of Direct Current (DC) power from on-site solar systems, building designers now have the option of direct distribution of DC power to energy storage systems and end-use loads such as lighting, electronics, and motors. Research shows that direct-DC can reduce building distribution losses by 5-15%, while improving power reliability. A readily available way to implement direct-DC distribution is Power over Ethernet (PoE), which typically has provided low-voltage DC to power office equipment such as WiFi access points. With recent updates to the PoE standard, equipment such as network-controlled LED lighting, thin client and computer workstations, HVAC controllers, fans, motors, and actuators can now be powered by PoE and are commercially available. This paper presents results from a DOE-funded project that is demonstrating PoE technologies and describes a DC modeling and design tool that is intended to help building designers properly evaluate and design DC distribution systems in buildings. The tool provides designers of DC power systems with estimates of both power system losses and indirect effects on building heating and cooling. The results of this research demonstrate that the design methods and products are available to implement DC power in buildings today.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Considerations for a Medium-Voltage DC Electrolysis Testbed

Here we present the results of a study focused on the feasibility of using Medium Voltage DC (MVDC) power distribution from wind power generation to electrolyzers for hydrogen production. This approach, using hybrid energy generation in a MVDC microgrid, offers many advantages. These include possible improvements in efficiency, reliability and installation cost compared to a more typical state-of-the-art AC distribution configuration. It also eliminates the need for transformers, which have recently been subject to price volatility and availability concerns. This study highlights the practical feasibility of MVDC distribution networks for integrating various energy sources, offering improved efficiency and reduced system complexity compared to conventional AC-based solutions. Future work will focus on enhancing fault protection strategies, scaling the system to larger renewable installations, and conducting hardware implementation at the National Renewable Energy Laboratory's (NREL) Flatirons Campus (FC). In the sections that follow we show that a DC Collection and Distribution System (DC CDS) reduces the losses associated with the electrical conversion / distribution process relative to a state-of-the-art AC approach, improving overall efficiency by 5%. On the qualitative side, reducing the number of conversion stages is likely to improve reliability, reduce capital investment cost, and enable simpler control algorithms to be used, and reduced risk of instabilities and malfunctions.

08 HYDROGEN↗

Joint scheduling of energy, fast and primary frequency response reserves in integrated transmission–distribution networks

Inverter-based distributed energy resources (DERs) connected to distribution networks (DNs) can provide fast frequency support, but their reserve deliverability depends on feeder constraints and differs from synchronous primary frequency response (PFR). Existing transmission–distribution coordination studies usually treat reserve generically or neglect feeder-level feasibility, while frequency-security scheduling studies rarely represent distribution feeders explicitly. This paper develops a bi-level day-ahead scheduling framework for integrated transmission–distribution networks that jointly clears energy, transmission-side PFR, and distribution-side fast frequency response (FFR) under exogenous hourly inertia and largest-loss inputs from an external unit commitment (UC) schedule. The transmission problem is modeled with DC-optimal power flow (OPF) and closed-form second-order cone (SOC) frequency-security constraints, whereas each DN is represented by a reserve-aware branch-flow AC-OPF so that scheduled fast reserves remain deliverable during activation. The bi-level problem is reformulated through Karush–Kuhn–Tucker (KKT) conditions into a mixed-integer SOC program, and a penalty term is used to tighten the distribution-network relaxation. In the reduced test system, lower exogenous inertia increased the required primary response from 179.64 MW to 191.08 MW, distribution-side fast response reduced total frequency-response procurement by up to 4.9%, and neglecting distribution constraints overstated the combined distribution-side energy and reserve award by up to 18%. In the expanded study, the largest case was solved in 2.02 s with a 0.00% optimality gap. Time-domain simulations kept the frequency nadir above 59.0 Hz in all tested hours. These results demonstrate the value of fast-response modeling and distribution-feasible reserve delivery in coordinated market clearing.

Noh, Seung-Gil↗

Distributed ADMM Using Private Blockchain for Power Flow Optimization in Distribution Network With Coupled and Mixed-Integer Constraints

The optimization problem for scheduling distributed energy resources (DERs) and battery energy storage systems (BESS) integrated with the power grid is important to minimize energy consumption from conventional sources in response to demand. Conventionally this optimization problem is solved in a centralized manner, limiting the size of the problem that can be solved and creating a high communication overhead because all the data is transferred to the central controller. These limitations are addressed by the proposed distributed consensus-based alternating direction method of multiplier (DC-ADMM) optimization algorithm, which decomposes the optimization problem into subproblems with private cost function and constraints. The distribution feeder is partitioned into low coupling subnetworks/regions, which solves the private subproblem locally and exchanges information with the neighboring regions to reach consensus. The relaxation strategy is employed for mixed-integer and coupled constraints introduced in the optimal power flow (OPF) problem by stationary and transportable BESS because DC-ADMM convergence is only guaranteed for strict convex problems. The information exchange and synchronization between subnetworks/regions are vital for distributed optimization. In this work, both of these aspects are addressed by the blockchain. The smart contract deployed on the blockchain network acts as a mediator for secure data exchange and synchronization in distributed computation. The blockchain-based distributed optimization problem’s effectiveness is tested for a 0.5-MW laboratory microgrid for one hour ahead and day-ahead for the IEEE 123-bus and EPRI J1 test feeders, and results are compared with a centralized solution.

25 ENERGY STORAGE↗

Optimal Power Flow in DC Networks with Robust Feasibility and Stability Guarantees

With high penetrations of renewable generation and variable loads, there is significant uncertainty associated with power flows in DC networks such that stability and operational constraint satisfaction are of concern. Most existing DC network optimal power flow (DN-OPF) formulations assume exact knowledge of loading conditions and do not provide stability guarantees. Here, in contrast, this paper studies a DN-OPF formulation which considers both stability and operational constraint satisfaction under uncertainty. The need to account for a range of uncertainty realizations in this paper's robust optimization formulation results in a challenging semi-infinite program (SIP). The proposed solution algorithm reformulates this SIP into a computationally tractable problem by constructing a tight convex inner approximation of the stability set using sufficient conditions for the existence of a feasible and stable power flow solution. Optimal generator set-points are obtained by optimizing over the proposed convex stability set. The validity and effectiveness of the propose algorithm is demonstrated through various DC networks adapted from IEEE test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Responses of the AC/DC Global Electric Circuit to Volcanic Electrical Activity in the Hunga Tonga-Hunga Ha'apai Eruption on 15 January 2022

Responses of the AC and DC global electric circuits (GECs) to the large eruption of the Hunga Tonga-Hunga Ha'apai (HT-HH) volcano on 15 January 2022 are discussed. The AC-related investigation is based on Schumann resonance (SR) measurements from six stations on four continents. The DC-related investigation utilizes atmospheric electric field (potential gradient, PG) measurements from six recording stations in Europe and the USA. According to data from the GLD360 and WWLLN lightning detection networks, the peak lightning stroke rate, 83/s, was dominated by negative polarity lightning, but the distributions of positive and negative lightning discharges in latitude and longitude around the volcano differed. A global intensification of SR is apparent in connection with the enhanced lightning activity caused by the eruption. SR data-based results confirm that the lightning activity in the eruption dominated the naturally occurring global activity for a period of about 1 hr. The highly localized increase in lightning activity over HT-HH was a unique point source of SR excitation. PG measurements suggest that impulse-like charging of the DC GEC, by ~15%, via negative cloud-to-ground lightning strokes took place twice during the eruption. A time constant of 7 or 8 min has been inferred for near-surface PG changes due to these enhancements. This could be the first direct measurement of the time constant of the GEC near the Earth's surface, as well as the first observation of the direct charging of the DC GEC by a unique atmospheric electrified source.

58 GEOSCIENCES↗

A Neural Network-Based Power Mismatch Elimination Strategy for Integrated Solar and ESS AC/DC Systems (MARS)

The multiport autonomous reconfigurable solar power plant (MARS) is a promising concept for the integration of photovoltaic (PV) and energy storage system (ESS) to the transmission ac grid and a high-voltage direct current (HVdc) link. The presence of PV and ESS in each arm of the MARS results in uneven distribution of active power among different submodules (SMs), thereby leading to unbalanced SM capacitor voltages and potentially compromising the system stability. Moreover, in the case of partial shadings, shaded PV SMs will suffer from decreased power injections causing power mismatch in the MARS system. To address this issue, a neural-network-based power mismatch elimination (NNPME) strategy is proposed in this article. The proposed NNPME strategy optimizes ESS usage and leverages both dc and ac circulating currents to facilitate power transfer among the SMs, arms, and phases of the MARS system. Simulation and control hardware-in-the-loop (cHIL) experiments demonstrate the effectiveness of the proposed NNPME strategy. Compared with the traditional approaches, the proposed NNPME strategy can significantly enhance system efficiency and ensure stable and continuous operation, even in the presence of uneven power distribution within the MARS system.

14 SOLAR ENERGY↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Modeling Toolkit for Comparing AC and DC Electrical Distribution Efficiency in Buildings

Recently, there has been considerable research interest in the potential for DC distribution systems in buildings instead of the traditional AC distribution systems. Due to the need for performing power conversions between DC and AC electricity, DC distribution may provide electrical efficiency advantages in some systems. To support comparative evaluations of AC-only, DC-only, and hybrid AC/DC distribution systems in buildings, a new modeling toolkit called the Building Electrical Efficiency Analysis Model (BEEAM) was developed and is described in this paper. To account for harmonics in currents or voltages arising from nonlinear devices, the toolkit implements harmonic power flow, along with nonlinear device behavioral descriptions derived from empirical measurements. This paper describes the framework, network equations, device representations, and an implementation of the toolkit in an open source software package, including a component library and graphical interface for creating circuits. Simulations of electrical behavior and device and system efficiencies using the toolkit are compared with experimental measurements of a small office environment in a variety of operating and load configurations. A detailed analysis of uncertainty estimation is also provided. Key findings were that a comparison of predicted versus measured efficiencies and power losses in the validation testbed using the initial toolkit implementation predicted device- and system-level efficiencies with reasonably good accuracy under both balanced and unbalanced AC scenarios. An uncertainty analysis also revealed that the maximum estimated error for system efficiency across all scenarios was 3%, and measured and modeled system efficiency agreed within the experimental uncertainty in approximately half of the scenarios. Based on the correspondence between simulation and measurement, the toolkit is proposed by the authors as a potentially useful tool for comparing efficiency in AC, DC, and hybrid AC/DC distribution systems in buildings.

DC distribution↗

Energy and power quality measurement for electrical distribution in AC and DC microgrid buildings

Today's selection of DC microgrid buildings features a diverse set of electrical topologies and turnkey solutions, each with specific design trade-offs and optimizations. Designers desperately need standardized metrics and procedures for measurement and verification (M&V) to analyze and compare the advantages of each DC solution to traditional AC building networks. This work develops M&V procedures for quantifying and comparing the energy efficiency and power quality in buildings. To calculate full-building efficiency, this work introduces the measurement-informed modeling method, a procedure that develops and refines a building's energy model with metered data. To quantify power quality, this work defines a new voltage quality index that applies to both AC and DC buildings. This article describes the equipment, instrumentation, and operation necessary to calculate the efficiency and power quality. It then demonstrates these methods with a set of field tests. We report these M&V procedures can ultimately be used to compare and improve the efficiency and power quality of various DC topologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARC-SAFE: Accelerated Response semiconducting Contactors and Surge Attenuation For DC Electrical systems (Final Scientific/Technical Report)

The landscape of power transmission and distribution is quickly evolving as more power conversion is done through power electronics and transmitted or distributed at medium voltage direct current (MVDC). As power electronics tend to store less energy and be less resilient to faults than conventional power transformers, a reliable and fast protection against faults is critical to protect power electronics (PE) based infrastructure, especially for medium- and high-voltage applications. This motivates the development of PE based protection circuits to replace slower contemporary electromechanical breakers. In this project a novel PE based MVDC circuit breaker is developed; the new design is comprised of 1) a normally-on leg made of commercially-available, cascaded SiC junction field effect transistors (JFETs) with a passive balancing network, and 2) a normally-off leg based on an optically-triggered gallium nitride (GaN) photoconductive semiconductor switch (PCSS). The normally-off leg was designed to be quickly turned on, to divert current to an auxiliary dissipative circuit, as the normally-on leg is turned off. This approach, using solid-state devices, was selected for a high-performance, fast-switching operation for the DC circuit breaker as compared to approaches that use slower mechanical switches. To be practical, the circuit breaker must have low conduction loss (low Ron) in the normally-on leg and fast coordinated triggering of the normally-off leg to avoid damage from inductive flyback, which could be considerable for long lengths of cable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Systems Integration Facility (ESIF): World-Class Systems Integration Capabilities and Research

The Energy Systems Integration Facility (ESIF), located at the National Renewable Energy Laboratory (NREL) South Table Mountain campus, is a world-renowned user facility for research and development of modern, advanced, and clean energy technologies. ESIF is distinguished by its continuously evolving, highly integrated systems that span throughout the building, connecting research capabilities across multiple laboratories and test areas. The primary ESIF research systems include: [1] data, cyber, and control networks, [2] research electrical distribution buses (REDB), [3] thermal integration infrastructure, and [4] hydrogen systems. The data, cyber, and control networks provide monitoring, control, communication, automation, visualization, and time series data storage and tagging capabilities for research projects and ESIF systems, including facility safety functions. The REDB system consists of four dedicated AC and DC electrical power networks that can connect devices located across the facility through versatile, automatic circuit configuration to support complex power electronics experiments up to the megawatt-scale. The thermal integration infrastructure consists of three temperature-conditioned water loops that provide heating and cooling interfaces and capabilities for thermal energy research. The hydrogen systems provide megawatt-scale hydrogen production, drying, compression, high-pressure storage, and delivery to laboratory end uses, including hydrogen fuel cell vehicle fueling. The ESIF research systems interconnect and extend throughout the various lab areas of the facility to create elaborate networks composed of diverse technologies for cutting-edge research. The ESIF capabilities are operated and stewarded by the ESIF Research Operations group, who also actively upgrade and advance the systems to ensure they remain ahead of anticipated research - enabling the success of many pioneering energy integration projects. The poster, created by members of the ESIF Research Operations team, highlights and summarizes the four core integrated systems at ESIF. The poster was first presented at the internal NREL Energize Forum on May 13th, 2024, and received the "Best Poster" award.

capabilities↗

Stability Analysis of Parallel Connected Bidirectional WPT System

This paper presents a stability analysis of parallel-connected bi-directional series-series resonant network wireless power transfer (WPT), optimized for Electric Vehicle (EV) charging and vehicle-to-grid (V2G) applications. The study addresses critical stability challenges in systems integrated with diverse distributed energy resources (DERs), including photovoltaics, fuel cells, wind turbines, energy storage systems, and the AC grid. The stability of such integrated DC grid systems is paramount for ensuring reliable operation, particularly under varying power flow conditions and dynamic interactions between parallel WPT systems. The analysis included system impedance characterization, state-space modeling, and open and closed-loop stability evaluations. The results demonstrated that the integration of a robust control architecture effectively mitigates instability risks and supports scalable, efficient operation. This work underscores the converter's adaptability and its potential for large-scale deployment in wireless EV charging infrastructures and integrated DC grid systems.

Asa, Erdem [ORNL] (ORCID:0000000190884812)↗