Results for “critical load restoration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning: Preprint

Distributed energy resources (DER) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline MPC controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning

Distributed energy resources (DER) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline MPC controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Postdisaster Routing of Movable Energy Resources for Enhanced Distribution System Resilience: A Deep Reinforcement Learning-Based Approach

The deployment of movable energy resources (MERs) can be an effective strategy to restore critical loads to enhance power system resilience when no other energy sources are available after the occurrence of an extreme event. Since the optimal locations of MERs following an extreme event are dependent on system operating states (e.g., the loads at each node, on/off status of system branches, and so on), existing analytical and population-based approaches must repeat the entire analysis and calculation when the system operating states change. On the contrary, if deep reinforcement learning (DRL)-based algorithms are sufficiently trained with a wide range of scenarios, they can quickly find optimal or near-optimal locations irrespective of changes in system states. A deep Q-learning-based approach is proposed for optimal MER deployment to enhance power system resilience. MERs can be also utilized to complement other types of resources, if available. The proposed approach operates in two stages after the occurrence of extreme events. In the first stage, the distribution network is represented as a graph, and the network is then reconfigured using tie switches by using Kruskal’s spanning forest search algorithm (KSFSA). To maximize critical load recovery, the optimal or near-optimal locations of MERs are chosen in the second stage. Further, case studies on a 33-node distribution system and a modified IEEE 123-node system demonstrate the effectiveness of the proposed approach for postdisaster routing of MERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Deep Reinforcement Learning for Distribution System Restoration Using Distributed Energy Resources and Tie-Switches

Distributed energy resources (DERs), such as solar PVs and energy storage, can be used to restore distribution system critical loads after the extreme weather events to increase grid resilience. However, coordinating multiple DERs together with tie-switches for multi-step restoration process under renewable uncertainty is challenging. This paper proposes a deep reinforcement learning to control discrete actions of switching on/off tie switches and DERs for critical load restoration. The restoration problem is first cast into the Markov decision process suitable for DRL. Then, the original soft actor critic (SAC) method for continuous actions has been extended to handle discrete and continuous actions. Numerical comparison results with other stochastic optimization-based approaches on the modified IEEE 33-bus system show that the proposed method can achieve fast critical load restoration in the presence of substation power outage while maintaining system voltage limit throughout the restoration process.

active distribution systems↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Enhancing Local Grid Resilience with Small Hydropower Hybrids: Proving the concept through demonstration, simulation, and analysis with Idaho Falls Power

Large hydropower, connected to the transmission system and typically possessing significant ability to balance grid frequency, has long been central to black start plans in regions where it is present. Small hydropower possesses most of the attributes required for black start but is often connected to distribution or sub-transmission systems and has less ability to balance grid frequency. Integrating energy storage such as batteries or ultracapacitors increases the combined asset’s ability to balance frequency. This asset integration enables a bottom-up grid restoration paradigm in which critical electric loads on the local distribution system can be powered even when the regional transmission system is down. This report presents a field demonstration conducted with Idaho Falls Power that proved this concept. The contribution of energy storage in restoring the small hydro-dominated distribution grid and its operational sensitivity across different control settings are further analyzed using high-fidelity simulations. Readers will learn about technical details on the field demonstration setup, energy storage contribution to black start, detailed simulation steps of islanded distribution grid restoration, and usage of field demonstration measurements for transient model refinements. Collectively this report points to a great opportunity for small hydropower to enhance resilience of local electric grids.

13 HYDRO ENERGY↗

Robust Distribution System Load Restoration With Time-Dependent Cold Load Pickup

Service restoration is one of the critical functions to enable the future self-healing distribution system. To restore the distribution system in a timely and reliable manner, the realistic system operating conditions need to be accurately characterized. Here, two main factors that have great impacts on distribution system restoration (DSR) in practice are investigated. First, cold load pickup (CLPU), generally caused by thermostatically controlled loads (TCLs), is a common phenomenon after an outage and shaped by the outage duration. However, the time-dependent behaviors of CLPU are rarely considered in literature. In this paper, the operating state evolution of TCLs after an outage is analyzed to characterize time-dependent CLPU. And the time-dependent CLPU is analytically embedded in DSR to accurately represent the actual behaviors of the restored loads. Second, it is difficult to predict loads that fluctuate during DSR due to the lack of real-time measurement data. Accordingly, a robust DSR based on the information gap decision theory (IGDT) is proposed to address this challenge, fully considering the uncertainty of CLPU. The proposed models are tested in IEEE 13-node and 123-node test feeders. Simulation results demonstrate that the time-dependent CLPU model and the uncertainty modeling of CLPU can accurately capture the actual behaviors of loads with TCLs after an outage, which greatly improves DSR decisions in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kickstart Your Federal Microgrid Resiliency Project: Financing Opportunities and Best Practices

Recent high-impact events such as hurricanes and wildfires have resulted in the loss of utility grid power to federal sites, highlighting the need for energy system resilience. To sustain critical functions, site loads may need to operate during an electric grid outage or at least have power restored quickly after the event. A microgrid can provide reliable backup power to critical loads when electric utility power is interrupted, and may also provide value during normal operations.

DER↗

Safe Exploration Reinforcement Learning for Load Restoration using Invalid Action Masking

This paper addresses the load restoration problem after a power outage event. Our primary proposed methodology uses a multi-agent reinforcement learning method to make the optimal sequential decisions on picking up critical loads. Typically, a negative reward is provided to discourage the agents from selecting decisions that violate physical constraints during the restoration process. However, the main disadvantage of this approach is its difficulty in applying it to large-scale systems due to the curse of dimensionality. This paper introduces the invalid action masking technique to overcome this limitation. The features of this technique include zero physical constraint violations, reduced training time, and stabilization of the explo- ration process. Simulation results are performed in IEEE 13-node and IEEE 123-node systems showing the better performance of the proposed algorithm in comparison to the conventional approaches both in terms of restored power and learning curve.

reinforcement learning, blackstart, artificial int↗

Adapting Grid Criticality for Data Centers

This presentation explores the evolving definition of “critical load” in the electric grid, emphasizing the growing importance of digital infrastructure—particularly data centers—in grid resilience, restoration, and modernization. As utilities increasingly rely on AI-driven analytics and software-defined control systems, data centers have shifted from passive electricity consumers to essential computational hubs that enable National Critical Functions (NCFs) and support real-time grid operations. The deck examines the scale and impact of digital loads, the need for grid modernization to manage rapid load growth, and the diverse computing paradigms required for AI deployment. It introduces a tiered taxonomy for classifying critical loads, highlights operational dependencies between the grid and digital infrastructure, and discusses policy implications for integrating data centers into emergency planning and restoration protocols. Through case studies and practical frameworks, the presentation provides actionable insights for utilities, regulators, and planners navigating the digital transformation of the power sector.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Microgrid Resilience: A Holistic and Context-Aware Resilience Metric

Microgrids present an effective solution for the coordinated deployment of various distributed energy resources and furthermore provide myriad additional benefits such as resilience, decreased carbon footprint, and reliability to energy consumers and the energy system as a whole. Boosting the resilience of distribution systems is another major benefit of microgrids. This is because they can also serve as a backup power source when the utility grid's operations are interrupted due to either high-probability low-impact events like a component failure or low-probability high-impact events - be it a natural disaster or a planned cyberattack. However, the degree to which any particular system can defend, adapt, and restore normal operation depends on various factors including the type and severity of events to which a microgrid is subjected. These factors, in turn, are dependent on the geographical location of the deployed microgrid as well as the cyber risk profile of the site where the microgrid is operating. Therefore, in this work, we attempt to capture this multi-dimensional interplay of various factors in quantifying the ability of the microgrid to be resilient in these varying aspects. This paper, thus, proposes a customized site-specific quantification of the resilience strength for the individual microgrid's capability to absorb, restore, and adapt to the changing circumstances for sustaining the critical load when a low-probability high-impact event occurs - termed as - context-aware resilience metric. We also present a case study to illustrate the key elements of our integrated analytical approach.

microgrid↗

A Load Switching Group based Feeder-level Microgrid Energy Management Algorithm for Service Restoration in Power Distribution System

This paper presents a load switching group based energy management system (LSG-EMS) for operating microgrids on a distribution feeder powered by one or multiple grid-forming distributed energy resources. Loads on a distribution feeder are divided into load switching groups that can be remotely switched on and off. The LSG-EMS algorithm, formulated as a mixed-integer linear programming (MILP) problem, has an objective function of maximizing the served loads while minimizing the total number of switching actions. A new set of topology constraints are developed for allowing multiple microgrids to be formed on the feeder and selecting the optimal supply path. Customer comfort is accounted for by maximizing the supply duration in the customer preferred service period and enforcing a minimum service duration. The proposed method is demonstrated on a modified IEEE 33-bus system using actual customer data. Simulation results show that the LSG-EMS successfully coordinates multiple grid-forming sources by selecting an optimal supply topology that maximizes the supply period of both the critical and noncritical loads while minimizing customer service interruptions in the service restoration process.

Hu, Rongxing↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters: Preprint

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.