Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

X-1 to X-Wings: Developing a Parametric Cost Model

In todays cost-constrained environment, NASA needs an X-Plane database and parametric cost model that can quickly provide rough order of magnitude predictions of cost from initial concept to first fight of potential X-Plane aircraft. This paper takes a look at the steps taken in developing such a model and reports the results. The challenges encountered in the collection of historical data and recommendations for future database management are discussed. A step-by-step discussion of the development of Cost Estimating Relationships (CERs) is then covered.

parametric cost model↗

Parametric Cost Models for Space Telescopes

Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

Stahl, H. Philip↗

Process Cost Modeling for Multi-Disciplinary Design Optimization

For early design concepts, the conventional approach to cost is normally some kind of parametric weight-based cost model. There is now ample evidence that this approach can be misleading and inaccurate. By the nature of its development, a parametric cost model requires historical data and is valid only if the new design is analogous to those for which the model was derived. Advanced aerospace vehicles have no historical production data and are nowhere near the vehicles of the past. Using an existing weight-based cost model would only lead to errors and distortions of the true production cost. This report outlines the development of a process-based cost model in which the physical elements of the vehicle are costed according to a first-order dynamics model. This theoretical cost model, first advocated by early work at MIT, has been expanded to cover the basic structures of an advanced aerospace vehicle. Elemental costs based on the geometry of the design can be summed up to provide an overall estimation of the total production cost for a design configuration. This capability to directly link any design configuration to realistic cost estimation is a key requirement for high payoff MDO problems. Another important consideration in this report is the handling of part or product complexity. Here the concept of cost modulus is introduced to take into account variability due to different materials, sizes, shapes, precision of fabrication, and equipment requirements. The most important implication of the development of the proposed process-based cost model is that different design configurations can now be quickly related to their cost estimates in a seamless calculation process easily implemented on any spreadsheet tool. In successive sections, the report addresses the issues of cost modeling as follows. First, an introduction is presented to provide the background for the research work. Next, a quick review of cost estimation techniques is made with the intention to highlight their inappropriateness for what is really needed at the conceptual phase of the design process. The First-Order Process Velocity Cost Model (FOPV) is discussed at length in the next section. This is followed by an application of the FOPV cost model to a generic wing. For designs that have no precedence as far as acquisition costs are concerned, cost data derived from the FOPV cost model may not be accurate enough because of new requirements for shape complexity, material, equipment and precision/tolerance. The concept of Cost Modulus is introduced at this point to compensate for these new burdens on the basic processes. This is treated in section 5. The cost of a design must be conveniently linked to its CAD representation. The interfacing of CAD models and spreadsheets containing the cost equations is the subject of the next section, section 6. The last section of the report is a summary of the progress made so far, and the anticipated research work to be achieved in the future.

Bao, Han P.↗

Life cycle cost modeling of conceptual space vehicles

This paper documents progress to date by the University of Dayton on the development of a life cycle cost model for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of a life cycle cost model. Cost categories are initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. The focus will be on operations and maintenance costs and other recurring costs. Secondary tasks performed concurrent with the development of the life cycle costing model include continual support and upgrade of the R&M model. The primary result of the completed research will be a methodology and a computer implementation of the methodology to provide for timely cost analysis in support of the conceptual design activities. The major objectives of this research are: to obtain and to develop improved methods for estimating manpower, spares, software and hardware costs, facilities costs, and other cost categories as identified by NASA personnel; to construct a life cycle cost model of a space transportation system for budget exercises and performance-cost trade-off analysis during the conceptual and development stages; to continue to support modifications and enhancements to the R&M model; and to continue to assist in the development of a simulation model to provide an integrated view of the operations and support of the proposed system.

Ebeling, Charles↗

Cost Modeling for Space Telescope

Parametric cost models are an important tool for planning missions, compare concepts and justify technology investments. This paper presents on-going efforts to develop single variable and multi-variable cost models for space telescope optical telescope assembly (OTA). These models are based on data collected from historical space telescope missions. Standard statistical methods are used to derive CERs for OTA cost versus aperture diameter and mass. The results are compared with previously published models.

Stahl, H. Philip↗

Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5-parameter first-article optical telescope assembly cost model OTA$ (FY17) = $20M x 30(S/G)x D(1.7)x λ(-0.5)x T(-0.25)x e(-0.028) (Y-1960)Where S/G = 1 for space and 0 for ground telescopes, D = diameter, λ= diffraction limited wavelength, T = operating temperature and Y = year of development. The model explains 92% (Adjusted R2) of the cost variation in a database of 47 total ground and space telescope assemblies (OTA). The MSFC model estimates the most likely cost for only the OTA. Where an OTA is defined as the subsystem which collects electromagnetic radiation and focuses it (focal) or concentrates it (afocal) into the science instruments. An OTA consists of the primary mirror, secondary mirror, auxiliary optics and support structure (such as optical bench or truss structure, primary support structure, secondary support structure or spiders, straylight baffles, mechanisms for adjusting the optical components, electronics or power systems for operating these mechanisms, etc.). Finally, duplication only reduces cost for the manufacture of identical systems(i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly(presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Telescope Cost Model, Parametric Cost Model↗

Update on Multi-Variable Parametric Cost Models for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper reports on recent revisions and improvements to our ground telescope cost model and refinements of our understanding of space telescope cost models. One interesting observation is that while space telescopes are 50X to 100X more expensive than ground telescopes, their respective scaling relationships are similar. Another interesting speculation is that the role of technology development may be different between ground and space telescopes. For ground telescopes, the data indicates that technology development tends to reduce cost by approximately 50% every 20 years. But for space telescopes, there appears to be no such cost reduction because we do not tend to re-fly similar systems. Thus, instead of reducing cost, 20 years of technology development may be required to enable a doubling of space telescope capability. Other findings include: mass should not be used to estimate cost; spacecraft and science instrument costs account for approximately 50% of total mission cost; and, integration and testing accounts for only about 10% of total mission cost.

Stahl, H. Philip↗

Cost Modeling Techniques for Design Maturity

Cost modeling techniques and factors which either add to or subtract from these estimates are examined. The most important factors for increasing costs are interfacing subsystems, subsystem design and software maturity. Cost decrease depends on hardware, software, and support equipment availability. A cost modeling analysis for reentry shield and aerodynamic decelerator subsystems of a reentry vehicle is presented. Integration problems for the subsystems are also discussed.

Ruhland, E. W.↗

The NASA Analogy Software Cost Model: A Web-Based Cost Analysis Tool

This paper provides an overview of the many new features and algorithm updates in the release of the NASA Analogy Software Cost Tool (ASCoT). ASCoT is a web-based tool that provides a suite of estimation tools to support early lifecycle NASA Flight Software analysis. ASCoT employs advanced statistical methods such as Cluster Analysis to provide an analogy based estimate of software delivered lines of code and development effort, a regression based Cost Estimating Relationships (CER) model that estimates cost (dollars), and a COCOMO II based estimate. The ASCoT algorithms are designed to primarily work with system level inputs such as mission type (earth orbiter vs. planetary vs. rover), the number of instruments, and total mission cost. This allows the user to supply a minimal number of mission-level parameters which are better understood early in the life-cycle, rather than a large number of complex inputs.

Hihn, Jairus↗

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

A maintenance and operations cost model for DSN

A cost model for the DSN is developed which is useful in analyzing the 10-year Life Cycle Cost of the Bent Pipe Project. The philosophy behind the development and the use made of a computer data base are detailed; the applicability of this model to other projects is discussed.

Burt, R. W.↗

Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems

The Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems offers an approximation of geomembrane lining system costs for pumped storage hydropower (PSH) reservoirs. Geomembrane lining systems have been used around the world for over 60 years for the construction of dams and reservoirs. Although geomembrane lining systems have found widespread use in the construction of canals and waste containment systems, they have not been utilized in the construction of new PSH facilities in the United States since the Mount Elbert PSH powerplant in Colorado. For this reason, PSH developers in the United States expressed the need for a tool that would allow them to estimate the costs of geomembrane lining systems for their PSH projects. To meet this need, the Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems was developed by Oak Ridge National Laboratory with support from Argonne National Laboratory and Stantec, Inc. This Cost Model will enable PSH developers to develop a preliminary estimate of the cost of geomembrane lining systems and to better understand different reservoir lining options and their cost and performance characteristics, thus enabling them to make informed decisions related to preferred reservoir lining systems for their PSH projects.

DeNeale, Scott [Oak Ridge National Laboratory (ORN↗

Preliminary Parametric Cost Model for X-Ray Grazing Incidence Optics for Space Flight

Parametric cost models offer a lot of utility in planning and comparing different missions and concepts. Furthermore, they have a significant advantage over other estimating methodologies as they can be quickly and easily replicated. The cost model presented in this paper focuses on estimating the most likely cost for the X-ray Mirror Assembly (XMA) of space-based X-ray telescopes with grazing incidence optics. The authors recognize the complexities of generating a single cost model that covers multiple fabrication techniques, so they have limited this preliminary study to techniques used on previous and current missions, such as direct polished glass full shell, replicated, and foil optics

Space Telescope Cost Model↗

1.2.2.404 – Improving the Representation of Hydropower in Production Cost Models

This project's goal is to improve hydropower's representation in power system models by actively coupling river basin (hydrologic) models with grid operations (production cost) models. Near term, this work provides a foundation that allows improved available flexibility and operational constraints representation. Longer term, the work will provide a template that can be used by commercial production cost modeling software vendors to capture the nuances of hydropower operations in their software offerings.

HYDRO ENERGY↗

Cost model relationships between textile manufacturing processes and design details for transport fuselage elements

Textile manufacturing processes offer potential cost and weight advantages over traditional composite materials and processes for transport fuselage elements. In the current study, design cost modeling relationships between textile processes and element design details were developed. Such relationships are expected to help future aircraft designers to make timely decisions on the effect of design details and overall configurations on textile fabrication costs. The fundamental advantage of a design cost model is to insure that the element design is cost effective for the intended process. Trade studies on the effects of processing parameters also help to optimize the manufacturing steps for a particular structural element. Two methods of analyzing design detail/process cost relationships developed for the design cost model were pursued in the current study. The first makes use of existing databases and alternative cost modeling methods (e.g. detailed estimating). The second compares design cost model predictions with data collected during the fabrication of seven foot circumferential frames for ATCAS crown test panels. The process used in this case involves 2D dry braiding and resin transfer molding of curved 'J' cross section frame members having design details characteristic of the baseline ATCAS crown design.

Metschan, Stephen L.↗

FECM/NETL Offshore CO2 Saline Storage Cost Model

The FECM/NETL Offshore CO2 Saline Storage Cost Model (CO2_S_COM_Offshore) estimates costs for a CO2 storage project in an offshore saline formation or reservoir. It is applicable for storage projects located on the Outer Continental Shelf of the Gulf of America. The purpose is to model the costs associated with a project, using simplified geo-engineering equations to calculate reservoir values needed to determine costs (such as CO2 plume area and number of injection wells). To use the model, change any of the inputs, which are always in orange cells, to the values you desire. Although there are numerous values that can be changed, the values expected to be of most interest have input cells on the 'Key_Inputs' sheet. Last update: 5/2/2025; Version 1.1 corrects bug in reservoir thickness calculations.

Carbon storage↗

An open-source framework for balancing computational speed and fidelity in production cost models

Studies of bulk power system operations need to incorporate uncertainty and sensitivity analyses, especially around exposure to weather and climate variability and extremes, but this remains a computational modeling challenge. Commercial production cost models (PCMs) have shorter runtimes, but also important limitations (opacity, license restrictions) that do not fully support stochastic simulation. Open-source PCMs represent a potential solution. They allow for multiple, simultaneous runs in high-performance computing environments and offer flexibility in model parameterization. Yet, developers must balance computational speed (i.e. runtime) with model fidelity (i.e. accuracy). In this paper, we present Grid Operations (GO), a framework for instantiating open-source, scale-adaptive PCMs. GO allows users to search across parameter spaces to identify model versions that appropriately balance computational speed and fidelity based on experimental needs and resource limits. Results provide generalizable insights on how to navigate the fidelity and computational speed tradeoff through parameter selection. We show that models with coarser network topologies can accurately mimic market operations, sometimes better than higher-resolution models. It is thus possible to conduct large simulation experiments that characterize operational risks related to climate and weather extremes while maintaining sufficient model accuracy.

42 ENGINEERING↗