Lessons learned from the space station program: the role of life-cycle cost
This paper describes Space Station Freedom's early attempt at life-cycle cost management and the lessons learned for the next major human missions beyond Earth orbit.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This paper describes Space Station Freedom's early attempt at life-cycle cost management and the lessons learned for the next major human missions beyond Earth orbit.
Low cost design study for turbopump concepts
A number of specific benefits that fit within the hallmarks of effective development are realized with implementation of model-based approaches to systems and assurance. Model Based Systems Engineering (MBSE) enabled by standardized modeling languages (e.g., SysML®) is at the core. These benefits in the context of spaceflight system challenges can include [1]: • Improved management of complex development • Reduced risk in the development process • Improved cost management • Improved design decisions With appropriate modeling techniques the assurance community also can improve early oversight and insight into project development. NASA has shown the basic constructs of SysML in an MBSE environment offer several key advantages, within a Model Based Mission Assurance (MBMA) initiative [2, 3]. These include the following: • Model viewpoints that promote rapid and systematic assessment of requirements coverage, hazard tagging and risk management • Embedded safety assessments for launch vehicles • Deployment of model assisted development of reliability products - Failure Modes and Effects Analyses (FMEAs) and Fault Trees • Test Planning • Validation and Verification of complex functions • Support of Assurance Case development for complex systems In addition, while there are benefits to be harvested, there is a realization that these do not come without effort and cost. Enabling model-based approaches requires structure, not only in an organizational context, but in a modeling context as well. There can be a steep learning curve and costs associated to train skilled modelers. But, on the other hand, not all of the assurance community need to be modelers. Models themselves must conform to ontologies that enable assurance. This places constraints upon the models and modelers. Optimums have yet to be developed where resources and constraints on modeling must be traded off in the organization and modeling efforts for projects. A number of barriers need to be overcome, as well, which pose challenges to the developers of the software that supports MBSE/MBMA. Information and data must be made to flow seamlessly through the life cycle. Because there is a wide variety of tools used in the community, to avoid the problems of the past of silos, delays, and diverging interests, information should flow among these tools to support the “single source of truth” paradigm of MBSE. This will greatly facilitate MBMA and advancement of assurance functions.
A number of specific benefits that fit within the hallmarks of effective development are realized with implementation of model-based approaches to systems and assurance. Model Based Systems Engineering (MBSE) enabled by standardized modeling languages (e.g., SysML®) is at the core. These benefits in the context of spaceflight system challenges can include: Improved management of complex development, Reduced risk in the development process, Improved cost management, Improved design decisions. With appropriate modeling techniques the assurance community can improve early oversight and insight into project development. NASA has shown the basic constructs of SysML in an MBSE environment offer several key advantages, within a Model Based Mission Assurance (MBMA) initiative.
Autonomic Computing (AC), self-management based on high level guidance from humans, is increasingly gaining momentum as the way forward in designing reliable systems that hide complexity and conquer IT management costs. Effectively, AC may be viewed as Policy-Based Self-Management. The Model Driven Architecture (MDA) approach focuses on building models that can be transformed into code in an automatic manner. In this paper, we look at ways to implement Policy-Based Self-Management by means of models that can be converted to code using transformations that follow the MDA philosophy. We propose a set of UML-based models to specify autonomic and autonomous features along with the necessary procedures, based on modification and composition of models, to deploy a policy as an executing system.
Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.
Business units face special challenges when they must integrate commercial-off-the-shelf cost management software from one supplier with the enterprise financial system from another.
Cost managment as a guiding factor in optimum development of technology, and proper timing of cost-saving programs in the development of a system or technology with payoffs in development and operational advances are discussed and illustrated. Advances enhancing the performance of hardware or software advances raising productivity or reducing cost, are outlined, with examples drawn from: thermochemical thrust maximization, development of cryogenic storage tanks, improvements in fuel cells for Space Shuttle, design of a spacecraft pyrotechnic initiator, cost cutting by reduction in the number of parts to be joined, and cost cutting by dramatic reductions in circuit component number with small-scale double-diffused integrated circuitry. Program-focused supporting research and technology models are devised to aid judicious timing of cost-conscious research programs.
This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.
This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.
Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
The potential of digital image processing systems costing $20,000 or less for geographic information systems is assessed with the emphasis on the volume of data to be handled, the commercial hardware systems available, and the basic software for: (1) data entry, conversion and digitization; (2) georeferencing and geometric correction; (3) data structuring; (4) editing and updating; (5) analysis and retrieval; (6) output drivers; and (7) data management. Costs must also be considered as tangible and intangible factors.
Contact Graph Routing (CGR) is a dynamic routing system that computes routes through a time-varying topology of scheduled communication contacts in a network based on the DTN (Delay-Tolerant Networking) architecture. It is designed to enable dynamic selection of data transmission routes in a space network based on DTN. This dynamic responsiveness in route computation should be significantly more effective and less expensive than static routing, increasing total data return while at the same time reducing mission operations cost and risk. The basic strategy of CGR is to take advantage of the fact that, since flight mission communication operations are planned in detail, the communication routes between any pair of bundle agents in a population of nodes that have all been informed of one another's plans can be inferred from those plans rather than discovered via dialogue (which is impractical over long one-way-light-time space links). Messages that convey this planning information are used to construct contact graphs (time-varying models of network connectivity) from which CGR automatically computes efficient routes for bundles. Automatic route selection increases the flexibility and resilience of the space network, simplifying cross-support and reducing mission management costs. Note that there are no routing tables in Contact Graph Routing. The best route for a bundle destined for a given node may routinely be different from the best route for a different bundle destined for the same node, depending on bundle priority, bundle expiration time, and changes in the current lengths of transmission queues for neighboring nodes; routes must be computed individually for each bundle, from the Bundle Protocol agent's current network connectivity model for the bundle s destination node (the contact graph). Clearly this places a premium on optimizing the implementation of the route computation algorithm. The scalability of CGR to very large networks remains a research topic. The information carried by CGR contact plan messages is useful not only for dynamic route computation, but also for the implementation of rate control, congestion forecasting, transmission episode initiation and termination, timeout interval computation, and retransmission timer suspension and resumption.
The Earth Observatory Satellite (EOS) study is summarized to show the modular design of a general purpose spacecraft, a mission peculiar segment which performs the EOS-A mission, an Operations Control Center, a Data Processing Facility, and a design for Low Cost Readout Stations. The study verified the practicality and feasibility of the modularized spacecraft with the capability of supporting many missions in the Earth Observation spectrum. The various subjects considered in the summary are: (1) orbit/launch vehicle tradeoff studies and recommendations, (2) instrument constraints and interfaces, (3) design/cost tradeoff and recommendations, (4) low cost management approach and recommendations, (5) baseline system description and specifications, and (6) space shuttle utilization and interfaces.
This paper describes the Pacific Basin Communications Study, an assessment of Pacific islands telecommunications requirements, recently completed by the Public Service Satellite Consortium under contract with the National Aeronautics and Space Administration (NASA). The study describes extant and planned telecommunications systems in the region, examines user needs in terms of the development of governmental, social and commercial activities, and proposes and describes alternative technological solutions to communications problems. Questions of financing, implementation, management, costs and benefits of a regional telecommunications system are discussed. This paper describes user requirements based on six months of field investigation and technological options for improving telecommunications in the Pacific islands.
The Pacific Basin Communications Study describes and assesses extent telecommunications systems in the Pacific Islands region. The study examines user needs in terms of the development of social services and commercial activities. Alternative technological solutions to communications problems are proposed and described. Recommendations include the augmentation and improvement of existing systems allowing for increased communications capacity. Regional cooperation will be required to accommodate the specific, unique requirements of individual nations. Questions of financing, implementation, management, costs and benefits of a regional telecommunications system are discussed.
An ad-hoc committee was asked to review the following questions relevant to the space station program: (1) onboard maintainability and repair; (2) in-space research and technology program and facility plans; (3) solar thermodynamic research and technology development program planning; (4) program performance (cost estimating, management, and cost avoidance); (5) onboard versus ground-based mission control; and (6) technology development road maps from IOC to the growth station. The objective of these new assignments is to provide NASA with advice on ways and means for improving the content, performance, and/or effectiveness of these elements of the space station program.