Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Fuel Cycle Cost Basis – 2017 Edition

This report, commissioned by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the DOE Nuclear Technology Research and Development (NTRD) Program (previously the Fuel Cycle Research and Development (FCRD) and the Advanced Fuel Cycle Initiative (AFCI)). The report describes the NTRD cost basis development process, reference information on NTRD cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for numerous fuel cycle cost modules (modules A-O) as well as cost modules for a number of reactor types (R modules). The fuel cycle cost modules were developed in the areas of natural uranium mining and milling, thorium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, managed decay storage, recycled product storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste. Since its inception, this report has been periodically updated. The last such internal document was published in August 2015 while the last external edition was published in December of 2009 as INL/EXT-07-12107 and is available on the Web at URL: www.inl.gov/technicalpublications/Documents/4536700.pdf. This current report (Sept 2017) is planned to be reviewed for external release, at which time it will replace the 2009 report as an external publication. This information is used in the ongoing evaluation of nuclear fuel cycles by the NE NTRD program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Cost of Decarbonization and Energy Upgrade Retrofits for US Homes

Cost is a major barrier when upgrading homes to reduce carbon emissions required to meet DOE’s climate-related goals. This report summarizes a nationwide effort to gather home energy upgrade project cost data along with household energy performance data. The goal was to develop cost benchmarks and to guide future R&D efforts aimed at cost compression and scaling of the residential upgrade market. The cost data were compiled for both total project costs and costs of individual measures. The majority of energy savings were modeled, with some models using measured site data for calibration. The database was analyzed using clustering techniques to find common energy and CO2 reduction approaches. The individual measures were combined into archetypal solutions to determine least-cost approaches to maximizing energy and carbon savings. Several financial analyses were preformed to examine other cost metrics beyond first cost. Project data was obtained for 1,739 projects, from 15 states and 12 energy programs, with a total of 10,512 individual measures. The database includes a wide-array of projects, ranging from single-measure HVAC upgrades to net-zero energy whole home remodels. Projects were predominantly single-family detached dwellings with wood frame construction. Most of the data was obtained from energy programs because they had recorded the necessary information and were willing to share with this study. This sample of convenience can provide broad guidance and national cost benchmarks, but lacks sufficient detail to draw more disaggregated conclusions, such as geographical trends. The majority of data contributions were obtained without compensation from sources where the required data was already in some sort of structured format. We compensated sources to enter data from individual projects into a structured data format for about 500 projects, with an average cost of about $40 per project. The database was highly skewed to lower cost, lower impact projects due to the nature of the sample of convenience. Less than 10% of projects had savings greater than 50%. The cost data for individual measures in the database are being used in other DOE efforts on residential energy use/decarbonization. This data collection effort should continue in order to provide the best-informed guidance for DOE and industry R&D, as well as deployment efforts (including policy and program planning).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Do We Really Know how Much it Costs to Construct High Performance Buildings?

Understanding the cost of energy efficient construction is critical to decision makers in building design, code development, and energy analysis. How much does it cost to upgrade from R-13 to R-19 in a building wall? How much do low-e windows really cost? Can we put a dollar figure on commissioning? Answers to these questions have a fuzzy nature, based on educated guesses and industry lore. The response depends on location, perspective, bulk buying, and hand waving. This paper explores the development of a web tool intended to serve as a publicly available repository of building component costs. In 2011 the U.S. Department of Energy (DOE) funded the launch of a web tool called the Building Component Cost Community (BC3), dedicated to publishing building component costs from documented sources, actively gathering verifiable cost data from the users, and collecting feedback from a wide range of participants on the quality of the posted cost data. The updated BC3 database, available at http://bc3.pnnl.gov, went live on April 30, 2012. BC3 serves as the ultimate source of the energy-related component costs for DOE’s residential code development activities, including cost-effectiveness analyses. The paper discusses BC3 objectives, structure, functionality and the current content of the database. It aims to facilitate a dialog about the lack of verifiable transparent cost data, as well as introduce a web tool that helps to address the problem. The questions posed above will also be addressed by this paper, but they have to be resolved by the user community by providing feedback and cost data to the BC3 database, thus increasing transparency and removing information asymmetry.

building component cost, code requirements, IECC, ↗

An analysis of injury claims from low-seam coal mines

The restricted workspace present in low-seam coal mines forces workers to adopt awkward working postures (kneeling and stooping), which place high physical demands on the knee and lower back. This article provides an analysis of injury claims for eight mining companies operating low-seam coal mines during calendar years 1996-2008. All cost data were normalized using data on the cost of medical care (MPI) as provided by the U.S. Bureau of Labor Statistics. Results of the analysis indicate that the knee was the body part that led in terms of claim cost ($4.2 million), followed by injuries to the lower back ($2.7 million). While the average cost per injury for these body parts was $13,100 and $14,400, respectively (close to the average cost of an injury overall), the high frequency of these injuries resulted in their pre-eminence in terms of cost. Analysis of data from individual mining companies suggest that knee and lower back injuries were a consistent problem across companies, as these injuries were each among the top five most costly part of body for seven out of eight companies studied. Results of this investigation suggest that efforts to reduce the frequency of knee and low back injuries in low-seam mines have the potential to create substantial cost savings.

01 COAL, LIGNITE, AND PEAT↗

DRILLING OPTIMIZATION OF A CANEY SHALE WELL USING OFFSET WELL DRILLING DATA

Cost reduction can be achieved by utilizing drilling simulators to efficiently optimize new wells to be drilled using available adjacent or offset well drilling data. Different approaches involving simulators that use inverted rate of penetration (ROP) models have been implemented to help improve the drilling performance of wells primarily within the Caney shale. A complete simulation and optimization technique is presented herein which utilizes drilling data from a nearby or offset well (Garrett well) to create an optimized drilling program for a new well to be drilled (Gallaway well).

02 PETROLEUM↗

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2009, approximately 7,500 megawatts (MW) of PV were installed globally, up from approximately 6,000 MW in 2008, consisting primarily of grid-connected applications. With 335 MW of grid-connected PV capacity added in 2009, the United States was the world's fourth largest PV market in 2009, behind Germany, Italy, and Japan. The market for PV in the United States is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the possible deployment of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the United States. The present report, the third in the series, describes installed cost trends from 1998 through 2009, and provides preliminary cost data for systems installed in 2010. The analysis is based on project-level cost data from approximately 78,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 874 MW, equal to 70% of all grid-connected PV capacity installed in the United States through 2009 and representing one of the most comprehensive sources of installed PV cost data for the U.S. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, system ownership type (customer-owned vs. third party-owned), host customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. fixed-axis). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section, and several appendices provide additional details on the analysis methodology and additional tabular summaries of the data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Commercial Building Sensors and Controls Systems: Barriers, Drivers, and Costs

Building sensors and controls systems, including building automation systems, consists of the sensor-based devices installed in buildings and the control and automation of those devices. Optimized sensors and controls systems could lead to 29% annual energy savings in commercial buildings and are integral to the growth of grid-interactive efficient buildings. Only 8% of small commercial buildings, however, have installed sensors and controls systems. This is largely due to cost barriers. This work seeks to increase the transparency of system costs and identify specific barriers and drivers for increased adoption. To gather industry insights, the team reached out to building owners, vendors, and contractors and conducted 20 interviews with the goal of collecting cost data and market characteristics regarding building sensors and controls. The qualitative interview data was analyzed using grounded theory to identify overarching concepts, such as barriers, drivers, and future directions on the field. From this analysis, primary barriers were found to be complexity, a lack of knowledge, and money. Primary drivers were found to be the knowledge of data, savings, and remote access. The qualitative cost data was collected in the form of invoices during the interviews. The cost values were used to develop a percentage-based cost stack which identifies the average fraction of the total cost attributed to each category (hardware, software, labor, fees, and taxes). This greater understanding of costs and barriers associated with commercial building sensors and controls systems lays the groundwork for future steps in increasing system adoption, reducing energy consumption, and market transformation.

advanced building controls↗

Open-source microreactor design models for technoeconomic assessments

Technoeconomic analyses for advanced nuclear technologies are essential for identifying cost drivers which allow for optimizing the technology to achieve better economic performance. Microreactors are emerging as a promising and reliable-energy solution, offering inherent safety, low capital investment, and rapid deployment capabilities. Past studies have conducted technoeconomic analyses for microreactors, but there remains a need for open-source technoeconomic models that can enhance collaboration, transparency, and consistency when performing this type of analysis. The present article introduces an open-source technoeconomic model for microreactors based on bottom-up cost estimation. Since no real cost data for microreactors exists, this model leverages cost data and insights gleaned from the Microreactor Applications, Research, Validation and Evaluation (MARVEL) project. It estimates the first-of-a-kind cost of two microreactor technologies and can also calculate the N th of a kind (NOAK) cost via accounting for learning and mass factory production. The two technologies considered in this paper are the liquid–metal thermal reactor (LTMR) and the gas-cooled microreactor (GCMR). In conclusion, the goal of this study is to demonstrate bottom-up cost estimation of these microreactor technologies and provide the cost estimation models that other users can leverage for various applications such as design optimization and financial planning.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

The Distributed Wind Cost Taxonomy

To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbine costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.

17 WIND ENERGY↗

Q1-2025 Solar Photovoltaic System Cost Benchmarks

The U.S. Department of Energy’s solar office and its national laboratory partners analyze cost data for U.S. solar photovoltaic systems to develop cost benchmarks to measure progress toward goals and guide research and development programs. The cost data is available in an Excel spreadsheet model that can be downloaded here.

14 SOLAR ENERGY↗

Commercial Building Sensors and Controls Systems: Barriers and Drivers: Preprint

Building sensors and controls systems, including building automation systems, comprise the sensor-based devices installed in buildings as well as the control and automation of those devices. Optimized sensors and controls systems could lead to 29% annual energy savings in commercial buildings and are integral to the growth of grid-interactive efficient buildings. Only 13% of small commercial buildings, however, have installed sensors and controls systems, largely because of cost barriers. To accelerate adoption, this work seeks to increase the transparency of system costs and identify specific barriers and drivers. To gather industry insights, the team reached out to building owners, vendors, and contractors and conducted 21 interviews with the goal of collecting cost data and market characteristics regarding building sensors and controls. We collected the cost data in the form of invoices and used it to develop a percentage-based cost category breakdown. The interview data were analyzed using grounded theory to identify overarching concepts such as barriers, drivers, and future directions. From this analysis, we found the primary barriers to be complex and confusing systems, lack of user skills, and financial concerns, and the primary drivers to be operational benefits, insight into operations, and remote access to data. The future directions analysis highlighted the potential technological solutions to address gaps and barriers, as well as predicted drivers to increase adoption. This greater understanding of the costs, barriers, and drivers associated with commercial building sensors and controls systems lays the groundwork for increasing system adoption, reducing energy consumption, and transforming the market.

building automation system↗

New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends

Installations of PV systems have been expanding at a rapid pace in recent years. In the United States, the market for PV is driven by national, state, and local government incentives, including upfront cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy and by the positive attributes of PV - e.g., modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. A new Lawrence Berkeley National Laboratory report, 'Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007', helps to fill this need by summarizing trends in the installed cost (i.e., the cost paid by the system owner) of grid-connected PV systems in the U.S. The report is based on an analysis of project-level cost data from nearly 37,000 residential and non-residential PV systems completed from 1998-2007 and installed on the utility-customer-side of the meter. These systems total 363 MW, equal to 76% of all grid-connected PV capacity installed in the U.S. through 2007, representing the most comprehensive data source available on the installed cost of PV in the United States. The data were obtained from administrators of PV incentive programs around the country, who typically collect installed cost data for systems receiving incentives. A total of 16 programs, spanning 12 states, ultimately provided data for the study. Reflecting the broader geographical trends in the U.S. PV market, the vast majority of the systems in the data sample are located in California (83%, by capacity) and New Jersey (12%), The remaining systems are located in Arizona, Connecticut, Illinois, Massachusetts, Maryland, Minnesota, New York, Oregon, Pennsylvania, and Wisconsin. The PV systems in the dataset range in size from 100 W to 1.3 MW, almost 90% of which are smaller than 10 kW. This article briefly summarizes some of the key findings from the Berkeley Lab study (the full report can be downloaded at http://eetd.lbl.gov/ea/emp/re-pubs.html). The article begins by summarizing trends related to the installed cost of PV systems prior to receipt of any financial incentives, and then discusses how changes in incentive levels over time and variation across states have impacted the net installed cost of PV to the customer, after receipt of incentives. Note that all cost and incentive data are presented in real 2007 dollars (2007$), and all capacity and dollars-perwatt ($/W) data are presented in terms of rated module power output under Standard Test Conditions (DC-STC).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Values of Recovered Uranium from HALEU Used Nuclear Fuels (Rev. 1)

The value of the recovered uranium (RU) from high assay low-enriched uranium (HALEU) used nuclear fuels was evaluated. Three utilizations of the recovered uranium were considered in this study, which include the cases that RU is used as a fissile material of nuclear fuel, RU is reused in the original advanced reactor after reenrichment, and RU is reused in conventional light water reactors after down-blending. In this study, the RU values were identified by comparing the cost of making a unit mass of fuel with RU versus the fuel cost with the equivalent fresh enriched uranium (EU). A series of bounding analyses for calculating the fuel costs were conducted using several selected reactor types, which include microreactors, advanced thermal reactors, and fast reactors having a burnup of 2 – 165 GWd/t (with residual U-235 content in discharged fuels of 0.8 - 19.6%). This study concludes that RU having a residual U-235 content higher than ~7% would cost less than the fresh EU. The affordability increases as the residual U-235 content in RU increases. For instance, the fuel cost with RU having the residual U-235 content of 19.6% is about 85% cheaper than the fuel cost with the equivalent fresh EU. This study observed that reusing RU after reenrichment in the original microreactor is impractical because the U-235 content in the re-enriched RU fuel would need to be higher than the limit for low-enriched uranium (<20%) to provide the same burnup performance due to parasitic absorption from U-236. It is noted that this study focused on the recovery of uranium only, and the value of other fissile materials (such as Pu) in the used nuclear fuel was not considered even though those are bred significantly in fast reactors. In addition, the impacts of uncertainties in the cost data and the value of RU of TRISO fuels were not evaluated in this study due to the limited information on the cost data uncertainties and the separation cost from TRISO fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transformer Efficiency Assessment - Okinawa, Japan

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transformer Efficiency Assessment - Okinawa, Japan

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗