Engineering and Safety Partnership Enhances Safety of the Space Shuttle Program (SSP)

Project Management must use the risk assessment documents (RADs) as tools to support their decision making process. Therefore, these documents have to be initiated, developed, and evolved parallel to the life of the project. Technical preparation and safety compliance of these documents require a great deal of resources. Updating these documents after-the-fact not only requires substantial increase in resources - Project Cost -, but this task is also not useful and perhaps an unnecessary expense. Hazard Reports (HRs), Failure Modes and Effects Analysis (FMEAs), Critical Item Lists (CILs), Risk Management process are, among others, within this category. A positive action resulting from a strong partnership between interested parties is one way to get these documents and related processes and requirements, released and updated in useful time. The Space Shuttle Program (SSP) at the Marshall Space Flight Center has implemented a process which is having positive results and gaining acceptance within the Agency. A hybrid Panel, with equal interest and responsibilities for the two larger organizations, Safety and Engineering, is the focal point of this process. Called the Marshall Safety and Engineering Review Panel (MSERP), its charter (Space Shuttle Program Directive 110 F, April 15, 2005), and its Operating Control Plan emphasizes the technical and safety responsibilities over the program risk documents: HRs; FMEA/CILs; Engineering Changes; anomalies/problem resolutions and corrective action implementations, and trend analysis. The MSERP has undertaken its responsibilities with objectivity, assertiveness, dedication, has operated with focus, and has shown significant results and promising perspectives. The MSERP has been deeply involved in propulsion systems and integration, real time technical issues and other relevant reviews, since its conception. These activities have transformed the propulsion MSERP in a truly participative and value added panel, making a difference for the safety of the Space Shuttle Vehicle, its crew, and personnel. Because of the MSERP's valuable contribution to the assessment of safety risk for the SSP, this paper also proposes an enhanced Panel concept that takes this successful partnership concept to a higher level of 'true partnership'. The proposed panel is aimed to be responsible for the review and assessment of all risk relative to Safety for new and future aerospace and related programs.

Duarte, Alberto↗

Resolution of a Reflector Shroud Fatigue Failure

Two cracks were observed on a reflector shroud for a space program after previously being subjected to the protoflight test campaign and several regression tests. After extensive analysis and investigations, the failure mechanism was identified to be fatigue as a result of the numerous vibration tests imposed on the unit. Two feasible corrective actions were proposed: first, a notched vibration profile which possesses sufficient margin from the anticipated acoustic and launch loads, while maintaining adequate fatigue life through launch and on-orbit operations, and second, a re-design of the shroud to strengthen the fatigue-susceptible areas. In this paper, we present the inspections, testing, and analysis performed to establish that the cracks were a result of fatigue failure. We discuss the conservative fatigue analysis methodology used in the development of both corrective action options. Finally, we review the lessons learned and the actions incorporated into the rework, subsequent regression testing, and the test plans to minimize the risk of recurrence in future units.

response limiting↗

MARSIS antenna flight deployment anomaly and resolution

This paper summarizes the resolution of an in flight anomaly that occurred during the deployment of the first of three MARSIS antenna booms. Characteristics of this deployment are described, along with a correlation to finite element models and measured spacecraft inertias, which allowed the intermediate state of the boom to be accurately determined. Based on this information, a spacecraft maneuver was performed that warmed the stalled hinge and led to the first boom successfully locking into its designed geometry. The confirmed partially deployed boom shape was then used to develop a thermal model of the stalled hinge both in its initial solar attitude and during the successful spacecraft maneuver. Results from the hinge thermal model and component level testing were evaluated in order to determine the root cause of the anomaly and the probability of its recurrence on subsequent deployments. These conclusions were then utilized in planning mitigating actions that were implemented during the remaining two boom deployments. Final flight data are presented for both dipole booms indicating a correctly deployed and healthy antenna. The monopole boom deployment was detected but the final state of the boom is unknown.

Mars↗

Using Hyperspectral Imagery to Identify Turfgrass Stresses

The use of a form of remote sensing to aid in the management of large turfgrass fields (e.g. golf courses) has been proposed. A turfgrass field of interest would be surveyed in sunlight by use of an airborne hyperspectral imaging system, then the raw observational data would be preprocessed into hyperspectral reflectance image data. These data would be further processed to identify turfgrass stresses, to determine the spatial distributions of those stresses, and to generate maps showing the spatial distributions. Until now, chemicals and water have often been applied, variously, (1) indiscriminately to an entire turfgrass field without regard to localization of specific stresses or (2) to visible and possibly localized signs of stress for example, browning, damage from traffic, or conspicuous growth of weeds. Indiscriminate application is uneconomical and environmentally unsound; the amounts of water and chemicals consumed could be insufficient in some areas and excessive in most areas, and excess chemicals can leak into the environment. In cases in which developing stresses do not show visible signs at first, it could be more economical and effective to take corrective action before visible signs appear. By enabling early identification of specific stresses and their locations, the proposed method would provide guidance for planning more effective, more economical, and more environmentally sound turfgrass-management practices, including application of chemicals and water, aeration, and mowing. The underlying concept of using hyperspectral imagery to generate stress maps as guides to efficient management of vegetation in large fields is not new; it has been applied in the growth of crops to be harvested. What is new here is the effort to develop an algorithm that processes hyperspectral reflectance data into spectral indices specific to stresses in turfgrass. The development effort has included a study in which small turfgrass plots that were, variously, healthy or subjected to a variety of controlled stresses were observed by use of a hand-held spectroradiometer. The spectroradiometer readings in the wavelength range from 350 to 1,000 nm were processed to extract hyperspectral reflectance data, which, in turn, were analyzed to find correlations with the controlled stresses. Several indices were found to be correlated with drought stress and to be potentially useful for identifying drought stress before visible symptoms appear.

Hutto, Kendall↗

Model Checking Artificial Intelligence Based Planners: Even the Best Laid Plans Must Be Verified

Automated planning systems (APS) are gaining acceptance for use on NASA missions as evidenced by APS flown On missions such as Orbiter and Deep Space 1 both of which were commanded by onboard planning systems. The planning system takes high level goals and expands them onboard into a detailed of action fiat the spacecraft executes. The system must be verified to ensure that the automatically generated plans achieve the goals as expected and do not generate actions that would harm the spacecraft or mission. These systems are typically tested using empirical methods. Formal methods, such as model checking, offer exhaustive or measurable test coverage which leads to much greater confidence in correctness. This paper describes a formal method based on the SPIN model checker. This method guarantees that possible plans meet certain desirable properties. We express the input model in Promela, the language of SPIN and express the properties of desirable plans formally.

model checking↗

Ozone and aircraft operations

The cabin ozone problem is discussed. Cabin ozone in terms of health effects, the characteristics of ozone encounters by aircraft, a brief history of studies to define the problem, corrective actions taken, and possible future courses of action are examined. It is suggested that such actions include avoiding high ozone concentrations by applying ozone forecasting in flight planning procedures.

Perkins, P. J.↗

Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

Remediation↗

Un-Numbered Operational Areas PRL 229 Railroad Tie Disposal Area Pond Confirmation Sampling Report

This Confirmatory Sampling (CS) Report (CSR) was prepared for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida in accordance with the CS Work Plan (CSWP) (HGL, 2022a). The CSR summarizes investigation activities performed on the Railroad Tie Disposal Area (RTDA) of the Un-Numbered Operational Areas (UNOA), Potential Release Location (PRL) 229 located at KSC. HydroGeoLogic, Inc. (HGL) prepared this report under Contract Number 80KSC019D0012. The purpose of the CSR is to provide information to evaluate the level of potential contamination in surface water and sediment samples collected from the RTDA PRL 229 Pond and determine if contaminants pose unacceptable risks to ecological receptors. The CSR provides analytical data of 10 sets of surface water and sediment samples collected in 2021. Surface water samples were analyzed for volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), polynuclear aromatic hydrocarbon (PAHs), metals, hardness, and salinity, while sediment samples were analyzed for metals, total organic carbon (TOC), SVOCs, PAHs, and total petroleum hydrocarbons (TPH). The CSR includes a Screening Level Ecological Risk Assessment (SLERA) conducted under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program to determine if unacceptable risks to ecological receptors exist at PRL 229 Pond. Metals and PAHs were detected in surface water samples, including detections of antimony, arsenic, barium, calcium, copper, lead, magnesium, thallium, zinc, anthracene, benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-c,d)pyrene and pyrene. Based on measured salinity (1.03 to 1.21 parts per thousand), the pond was identified as freshwater. Sediment analytical results also contained detections of metals and PAHs, including antimony, arsenic, barium, beryllium, cadmium, chromium, copper, lead, mercury, nickel, selenium, thallium, zinc, anthracene benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-c,d)pyrene and pyrene. Potential risks to ecological receptors were evaluated in accordance with the SLERA Work Plan and the Decision Process Document for the Resource Conservation and Recovery Act (RCRA) Corrective Action Program at KSC (DPD) (Geosyntec, 2019), and using the 2021 sediment and surface water analytical results. Potential ecological receptors evaluated in the SLERA include the aquatic community, benthic invertebrates, aquatic birds, and aquatic mammals. The SLERA included Steps 2a through 2c of the Ecological Risk Assessment (ERA) process in accordance with the DPD. Using multiple lines of evidence, the SLERA concluded that many of the detected analytes are present at concentrations similar to those in background or reference locations at KSC, and/or at concentrations that would not pose a significant risk to ecological communities. There are no screening values available for the avian community, and PAHs are bioaccumulative compounds. For this reason, food web modeling was completed as a supplement to Step 2c to provide a quantitative evaluation of this exposure pathway. Food web modeling indicates that PAHs are unlikely to pose a risk to birds exposed to site sediment and surface water. Based on the results of the SLERA, the contaminants in sediment and surface water pose no to minimal risk to the ecological communities that could live or forage at the site. Based on the results of the SLERA, no further study is recommended for the RTDA Pond at PRL 229.

Confirmation Sampling↗

An expert system for satellite and instrument data anomaly and fault isolation

A prototype Generic Payload Operations Control System (GPOCC) is being developed at the NASA Jet Propulsion Laboratory to provide a low-cost command and control processing center for science instruments and small payloads. The GPOCC supports the difficult transition from integration and test to flight operations. The prototype will incorporate four expert systems to perform telemetry, command, and mission planning functions as well as telecommunications scheduling. The first of these expert systems to be developed will perform telemetry data analysis and fault isolation, as well as propose corrective action. This Data Analysis Module (DAM) will monitor telemetry data and perform continual data monitoring and trend analysis based on a knowledge base and historic data archived on an optical disk storage device. The system maintains a continuous knowledge database of past system performance characteristics. The goal of the Data Analysis Module is to achieve consistent, dependable and validatable performance, to demonstrate thorough, reliable and fast reasoning, and to reduce the concentration demanded of flight analysis personnel.

Busse, Carl↗

The Test and Evaluation of Non-Chromate Finishing Agent

Clark Atlanta University (CAU) has engaged a team comprised of university faculty members, student research assistants, and consultants from industrial and technology firms in order to ensure that NASA receives a quality product on time and within budget. In addition to the current related expertise which CAU possess, we have enlisted materials and aid from several other agencies, and machine manufacturers to assist us in completing the project on time and according to plan and budget. The research team is employing sound engineering principles in its approach to this project. Each phase of the project is preceded by a thorough and complete planning session that details the work plan and provide a comprehensive review of the work to be accomplished during the particular phase and by whom. Maximum use is being made of existing or already planned capabilities to ensure maximum economy, and frequent online reviews are being held to measure progress and to identify a potential problem in sufficient time to allow for corrective action.

Okhio, Cyril↗

Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS↗

JPL Resource Allocation Planning Scheduling Office (RAPSO) long range forecasting

The paper introduces the concept of the long range forecasting function, which is then used to identify periods of peak oversubscription of resources years before they actually happen, so that proper corrective actions (construction of additional antennas, reduction in support committment to the impacted projects) can be implemented.

RAPSO long range forecasting↗

Priority scheme planning for the robust SSM/PMAD testbed

Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.

Elges, Michael R.↗

A Generative Control Capability for a Model-based Executive

This paper describes Burton, a core element of a new generation of goal-directed model-based autonomous executives. This executive makes extensive use of component-based declarative models to analyze novel situations and generate novel control actions both at the goal and hardware levels. It uses an extremely efficient online propositional inference engine to efficiently determine likely states consistent with current observations and optimal target states that achieve high level goals. It incorporates a flexible generative control sequencing algorithm within the reactive loop to bridge the gap between current and target states. The system is able to detect and avoid damaging and irreversible situations, After every control action it uses its model and sensors to detect anomalous situations and immediately take corrective action. Efficiency is achieved through a series of model compilation and online policy construction methods, and by exploiting general conventions of hardware design that permit a divide and conquer approach to planning. The paper presents a formal characterization of Burton's capability, develops efficient algorithms, and reports on experience with the implementation in the domain of spacecraft autonomy. Burton is being incorporated as one of the key elements of the Remote Agent core autonomy architecture for Deep Space One, the first spacecraft for NASA's New Millenium program.

Williams, Brian C.↗

Galileo completing VEEGA - A mid-term report

In December Galileo will complete its Venus-Earth-Earth-Gravity Assist (VEEGA) mission phase and will be placed on a direct trajectory to Jupiter arriving in December 1995. Galileo will be the first aircraft to orbit Jupiter and send a probe into its atmosphere and will perform an intensive and comprehensive investigation of the planet. Observations made during the October 1991 encounter with the asteroid Gaspra are discussed. The observation plan to be used for earth and moon observations during the December 1992 gravity assist encounter is described. The Galileo High-Gain Antenna (HGA) deployment anomaly status is reported and future corrective actions are outlined. The low-gain antenna contingency mission to be implemented if the HGA cannot be deployed is described and overall performance and status of the space craft are discussed. The selected tour for the Galileo Jupiter satellite-gravity-assist orbital tour is described and the decision rationale for performing the August 1993 asteroid Ida flyby option is presented.

O'Neil, William J.↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Adapting ASPEN for Orbital Express

By studying the Orbital Express mission, modeling the spacecraft and scenarios, and testing the system, a technique has been developed that uses recursive decomposition to represent procedural actions declaratively, schema-level uncertainty reasoning to make uncertainty reasoning tractable, and lightweight, natural language processing to automatically parse procedures to produce declarative models. Schema-level uncertainty reasoning has, at its core, the basic assumption that certain variables are uncertain, but not independent. Once any are known, then the others become known. This is important where a variable is uncertain for an action and many actions of the same type exist in the plan. For example, if the number of retries to purge pump lines was unknown (but bounded), and each attempt required a sub-plan, then, once the correct number of attempts required for a purge was known, it would likely be the same for all subsequent purges. This greatly reduces the space of plans that needs to be searched to ensure that all executions are feasible. To accommodate changing scenario procedures, each is ingested into a tabular format in temporal order, and a simple natural-language parser is used to read each step and to derive the impact of that step on memory, power, and communications. Then an ASPEN (Activity Scheduling and Planning Environment) model is produced based on this analysis. The model is tested and further changed by hand, if necessary, to reflect the actual procedure. This results in a great savings of time used for modeling procedures. Many processes that need to be modeled in ASPEN (a declarative system) are, in fact, procedural. ASPEN includes the ability to model activities in a hierarchical fashion, but this representation breaks down if there is a practically unbounded number of sub-activities and decomposition topologies. However, if recursive decomposition is allowed, HTN-like encodings are enabled to represent most procedural phenomena. For example, if a switch requires a variable (but known at the time of the attempt) number of attempts to switch on, one can recurse on the number of remaining switch attempts and decompose into either the same switching activity with one less required attempt, or not decompose at all (or decompose into a dummy task), resulting in the end of the decomposition. In fact, any bounded procedural behavior can be modeled using recursive decompositions assuming that the variables impinging the disjunctive decomposition decision are computable at the time that the decision is made. This enables one to represent tasks that are controlled outside of the scheduler, but that the scheduler must accommodate, without requiring one to give a declarative model of the procedural behavior.

Chouinard, Caroline↗

Comprehensive Environmental Informatics System (CEIS) Integrating Crew and Vehicle Environmental Health

Integrated Vehicle Health Management (IVHM) systems have been pursued as highly integrated systems that include smart sensors, diagnostic and prognostics software for assessments of real-time and life-cycle vehicle health information. Inclusive to such a system is the requirement to monitor the environmental health within the vehicle and the occupants of the vehicle. In this regard an enterprise approach to informatics is used to develop a methodology entitled, Comprehensive Environmental Informatics System (CEIS). The hardware and software technologies integrated into this system will be embedded in the vehicle subsystems, and maintenance operations, to provide both real-time and life-cycle health information of the environment within the vehicle cabin and of its occupants. This comprehensive information database will enable informed decision making and logistics management. One key element of the CEIS is interoperability for data acquisition and archive between environment and human system monitoring. With comprehensive components the data acquired in this system will use model based reasoning systems for subsystem and system level managers, advanced on-board and ground-based mission and maintenance planners to assess system functionality. Knowledge databases of the vehicle health state will be continuously updated and reported for critical failure modes, and routinely updated and reported for life cycle condition trending. Sufficient intelligence, including evidence-based engineering practices which are analogous to evidencebased medicine practices, will be included in the CEIS to result in more rapid recognition of off-nominal operation to enable quicker corrective actions. This will result from better information (rather than just data) for improved crew/operator situational awareness, which will produce significant vehicle and crew safety improvements, as well as increasing the chance for mission success, future mission planning as well as training. Other benefits include improved reliability, increase safety in operations and cost of operations. The cost benefits stem from significantly reduced processing and operations manpower, predictive maintenance for systems and subjects. The improvements in vehicle functionality and cost will result from increased prognostic and diagnostic capability due to the detailed total human exploration system health knowledge from CEIS. A collateral benefit is that there will be closer observations of the vehicle occupants as wrist watch sized devices are worn for continuous health monitoring. Additional database acquisition will stem from activities in countermeasure practices to ensure peak performance capability by occupants of the vehicle. The CEIS will provide data from advanced sensing technologies and informatics modeling which will be useful in problem troubleshooting, and improving NASA s awareness of systems during operation.

Nall, Mark E.↗