Application of radiochromic gel dosimetry to commissioning of a megavoltage research linear accelerator for small–field animal irradiation studies

To develop and implement an efficient and accurate commissioning procedure for small-field static beam animal irradiation studies on an MV research linear accelerator (Linatron-M9) using radiochromic gel dosimetry. The research linear accelerator (Linatron-M9) is a 9 MV linac with a static fixed collimator opening of 5.08 cm diameter. Lead collimators were manually placed to create smaller fields of 2 × 2 cm 2 , 1 × 1 cm 2 , and 0.5 × 0.5 cm 2 . Relative dosimetry measurements were performed, including profiles, percent depth dose (PDD) curves, beam divergence, and relative output factors using various dosimetry tools, including a small volume ionization chamber (A14), GAFCHROMIC™ EBT3 film, and Clearview gel dosimeters. The gel dosimeter was used to provide a 3D volumetric reference of the irradiated fields. The Linatron profiles and relative output factors were extracted at a reference depth of 2 cm with the output factor measured relative to the 2 × 2 cm 2 reference field. Absolute dosimetry was performed using A14 ionization chamber measurements, which were verified using a national standards laboratory remote dosimetry service. Absolute dosimetry measurements were confirmed within 1.4% (k = 2, 95% confidence = 5%). The relative output factor of the small fields measured with films and gels agreed with a maximum relative percent error difference between the two methods of 1.1 % for the 1 × 1 cm 2 field and 4.3 % for the 0.5 × 0.5 cm 2 field. These relative errors were primarily due to the variability in the collimator positioning. The measured beam profiles demonstrated excellent agreement for beam size (measured as FWHM), within approximately 0.8 mm (or less). Film measurements were more accurate in the penumbra region due to the film’s finer resolution compared with the gel dosimeter. Following the van Dyk criteria, the PDD values of the film and gel measurements agree within 11% in the buildup region starting from 0.5 cm depth and within 2.6 % beyond maximum dose and into the fall-off region for depths up to 5 cm. The 2D beam profile isodose lines agree within 0.5 mm in all regions for the 0.5 × 0.5 cm 2 and the 1 × 1 cm 2 fields and within 1 mm for the larger field of 2 × 2 cm 2 . The 2D PDD curves agree within approximately 2% of the maximum in the typical therapy region (1–4 cm) for the 1 × 1 cm 2 and 2 × 2 cm 2 and within 5% for the 0.5 × 0.5 cm 2 field. This work provides a commissioning process to measure the beam characteristics of a fixed beam MV accelerator with detailed dosimetric evaluation for its implementation in megavoltage small animal irradiation studies. Radiochromic gel dosimeters are efficient small-field relative dosimetry tools providing 3D dose measurements allowing for full representation of dose, dosimeter misalignment corrections and high reproducibility with low inter-dosimeter variability. Altogether, radiochromic gels are valuable for fast, full relative dosimetry commissioning in comparison to films for application in high-energy small-field animal irradiation studies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

1.2.4.403 - Pumped Storage Hydropower FAST Commissioning Prize

The Pumped Storage Hydropower (PSH) FAST Commissioning Prize aimed to reduce the time, cost, and risk required to commission PSH projects by crowdsourcing ideas via a three-stage prize. Objectives were to reduce the time to commission PSH projects from 10+ years to less than 5 years and to develop a baseline analysis for PSH.

HYDRO ENERGY↗

Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB

The Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) consists of a newly constructed linear accelerator and fragment separator that are designed for enhanced production rates of rare isotopes for use in research and other societal applications. Recent activities through to August 2022 took place to commission the Advanced Rare Isotope Separator (ARIS) and carry out the first experiments. This followed commissioning of the newly constructed linac that is designed to provide orders of magnitude higher beam power than the previously coupled cyclotrons. This required that more advanced target, beam dump, and collimation systems of the new separator be designed and constructed to sustain unprecedented conditions by heavy ion beams. Commissioning with ~1 kW beams began recently and results from activities that began in late 2021 are reported here. Comparisons between the previous and current facilities are provided.

43 PARTICLE ACCELERATORS↗

First on-line commissioning experiments at the St. Benedict facility

Nuclear beta decays provide an excellent probe of fundamental symmetries due to their mediation by the weak interaction. In particular, precise measurements of these decays provide constraints on the unitarity of the Cabbibo-Kobayashi-Maskawa (CKM) quark-mixing matrix. While superallowed pure Fermi decays currently set the most precise limits, the alternative suite of superallowed mixed mirror decays has been ill-studied. These nuclei can provide an important consistency check of calculation and measurement methods employed for the pure Fermi decays, more critically needed now in the wake of a 2.4σ deviation from unitarity of the CKM matrix. In order to remedy the gap in data for mirror decays, the Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) facility is being commissioned at the University of Notre Dame’s Nuclear Science Laboratory (NSL). In this paper, we present first results of the commissioning of the St. Benedict facility on-line at the TwinSol radioactive beam facility. The results of initial commissioning experiments involving the St. Benedict gas catcher, RF carpet, RFQ ion guide and RFQ cooler-buncher will be presented.

beta decay↗

Commissioning of a replacement subatmospheric cold box for Jefferson Lab’s Central Helium Liquefier

Jefferson Lab’s Cryogenics Department has designed, fabricated, installed, and commissioned a new subatmospheric cold box to replace one of the two existing units within our Central Helium Liquefier (CHL). The replacement cold box, dubbed SC1R, pumps saturated helium vapor at 0.0385 atm from Jefferson Lab’s continuous electron beam accelerator facility (CEBAF) cryomodules to maintain an operating temperature of nominally 2.1 K. This is accomplished using a five-stage cryogenic centrifugal compressor (cold compressor) system and a brazed aluminum plate-fin heat exchanger operating between 2.1 K and 4.5 K. In this paper we will describe our experience commissioning the SC1R cold box. We will discuss pump-down of the system to 2.1 K and steady-state operation at the cold compressor design flow rates of 170, 200, and 250 g/s. Performance of the heat exchanger and cold compressors has been mapped across a range of flow rates and optimized for CEBAF operations. This commissioning data will be used to monitor future performance and adapt to changing load requirements.

Mastracci, B.↗

Commissioning of the large-scale lead tungstate scintillating calorimeter

Here, we report on the installation and initial commissioning of a large-scale lead tungstate (PbWO4) scintillating crystal calorimeter developed for high-rate photon detection and precise energy measurement. The calorimeter comprises 1596 high-granularity, high-resolution scintillating crystals optimized for electromagnetic-shower detection over a wide energy range. Scintillation light from each crystal is read out by Hamamatsu R4125 photomultiplier tubes equipped with a custom voltage divider and front-end amplifier to ensure stable gain at high rates. All calorimeter modules were fabricated and characterized using a light-emitting diode–based optical test system prior to installation to verify uniformity and photodetector performance. After installation, the electromagnetic calorimeter was fully integrated into the experiment data acquisition and energy-based trigger systems. The optical response of the modules was equalized using the light-monitoring system, cosmic-ray muons, and photons from Compton-scattering events. Commissioning results demonstrate a reliably calibrated optical response and stable detector performance during the first run. These results validate the calorimeter design and commissioning methodology for large-scale scintillator-based photonic instrumentation.

Analog to digital converters↗

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25

An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.

Accelerator Physics↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m$^3$ membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

43 PARTICLE ACCELERATORS↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m3 membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

Geynisman, Michael [Fermilab]↗

Sensorium: commissioning abundant sensors with augmented reality and QR codes

In the future, it will be possible to build high-quality models of building interiors based on data from a dense fleet of sensors reporting on air volumes much smaller than a room or zone. To enable such models, we are creating technologies that allow a fleet of sensors to be commissioned quickly at low cost. Our sensor commissioning process builds a 3D model of each building interior that includes sensor positions and sensor networking information such as sensor MAC addresses. It employs multiple technologies, including augmented reality, LiDAR, QR codes, and computer vision. Sensors can be commissioned at more than 10x the speed and at less than one tenth the cost of traditional approaches.

Bier, Eric A.↗

Performance and Commissioning of the BigBite Timing Hodoscope for Nucleon Form Factor Measurements at Jefferson Lab

The BigBite Timing Hodoscope detector is the primary subject of this thesis. The Super BigBite Spectrometer is a Jefferson Lab Hall A Collaboration project that has and will continue to measure nucleon electromagnetic form factors. This spectrometer includes the Timing Hodoscope which provides high resolution particle timing data for scattered electrons in the electron arm of BigBite. The Timing Hodoscope utilizes 90, 25 × 25 × 600 mm3 scintillator bars stacked on top of each other to form a single detector plane, and these bars are connected to 180 photo-multiplier tubes via light guides. Particles collide with the scintillating material creating a shower of optical photons and these particle events in the bars are collected to generate signals that are readout by the data acquisition (DAQ) electronics. NINO ASIC amplifier-discriminator cards output signals from the photo-multiplier tubes into analogue and logic signals, which are sent to analogue-to-digital (ADC) and time-to-digital (TDC) converter data acquisition readout modules. This data is then used for analysis of the detector. The focus of this thesis is the construction, commissioning, calibration, and performance of the BigBite Timing Hodoscope before and during the first of five nucleon electromagnetic form factor experiments at Jefferson Lab Hall A. Before the neutron magnetic form factor, G n M, experiment, cosmic ray data was collected during commissioning to confirm proper operation of the Timing Hodoscope electronics by observing the ADC and TDC data. Commissioning studies for charge normalization, gain matching, and other ADC and TDC detector data variables were performed before moving the detector into Hall A. Following installation in Hall A, several calibration studies were implemented to fine-tune the detector in preparation for use in the experiment. The calibration studies included analysis of timing cuts, TDC alignment, the time-walk effect, time difference offsets, and scintillator velocity corrections. Once the Timing Hodoscope was well-calibrated, data-taking during the experiment commenced and the beam-on-target data was used to characterize the Timing Hodoscope performance during the G n M experiment run-time. The performance analysis included studies observing energy deposit, cluster size, rates, accidentals, pile-up, tracking efficiency, position resolution, and time resolution. After application of physics cuts to ensure a data set comprised of particle tracks corresponding to elastic electrons, which is the main data of interest for measurement of G n M, the Timing Hodoscope is shown on average across all kinematic settings to have a >98% tracking efficiency, a position resolution of 4-6 cm in the non-dispersive plane and 1.5-2 cm in the dispersive plane, and a time resolution of 500-750 ps. These performance results are compared to a GEANT4 based performance simulation of the BigBite Timing Hodoscope for reference, showing to what degree the measured performance values match those taken from the simulation.

Marinaro, Ralph↗

Design and Commission of Solid State Switch Driver in SLAC Subbooster Modulator

The LINAC sub-booster modulator is a pulsed power supply to provide a 30kV pulse to drive a klystron in SLAC LINAC. It has utilized vacuum tetrode as pulse switch for more than 60 years. With the vacuum tetrode availability becoming less and its cost surging, a natural choice is to use solid state switch in this pulsed power modulator. To commission solid state switch in LINAC sub-booster modulator, a driver board is designed to drive a BEHLKE HTS-LC2 series MOSFET based switches. The design concept and some concerns in design will be presented. The driver board is universal for all HTS-LC2 series switches because they share the same driver signals and connections. After the driver is commissioned, two AI systems are introduced to design one core part of the driver, the results are presented here. During the commission of the driver board in the LINAC sub-booster modulators, some problems happened and were addressed.

AI Circuit Design↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recommendations to Improve Nuclear Licensing: Update to INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

In 2023, various stakeholders had asked for BEA’s thoughts and recommendations to improve the U.S. Nuclear Regulatory Commission’s (NRC) licensing review and approval process. This included an April 14, 2023 request from the House Committee on Energy and Commerce on “information and recommendations to improve the licensing review and approval process, . . . as well as the siting, licensing, construction, and oversight of advanced nuclear reactor technologies.” In response to these requests, BEA prepared and published INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process (2023 Report). The 2023 Report included 13 recommendations related to streamlining NRC hearings, expediting NRC safety and environmental reviews, otherwise improving NRC licensing, and providing financial benefits to new reactor projects. Many of these earlier recommendations were addressed through various legislative actions or changes made by the NRC. Section 2 of this report addresses the current status of those earlier recommendations. BEA recently received a new request from the House Committee on Energy and Commerce seeking any suggestions for additional areas to examine or potential reforms “that may assist in modernizing the licensing and regulatory process that affects civil nuclear deployment.” Additionally, the new Secretary of Energy has identified initial DOE actions to support unleashing the golden era of American energy dominance, including “Unleash Commercial Nuclear Power in the United States” and “Streamline Permitting and Identify Undue Burdens on American Energy.” Given these developments, BEA has prepared a new set of updated recommendations in this report. The recommendations include updated versions of recommendations from the 2023 Report which have not been fully adopted, as well as entirely new recommendations. This set of recommendations has a slightly broader focus with some recommendations focused on DOE authorizations and some recommendations related to nuclear licensing beyond new reactors. Each recommendation below also identifies whether the recommendation would require legislative action or could be addressed directly by the respective agency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗