Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The UNO Aviation Monograph Series: Aviation Security: An Annotated Bibliography of Responses to the Gore Commission

This monograph is a companion to UNOAI Monograph 96-2, "The Image of Airport Security: An Annotated Bibliography," compiled in June 1996. The White House Commission on Aviation Safety and Security, headed by Vice President Al Gore, was formed as a result of the TWA Flight 800 crash in August 1996. The Commission's final report included 31 recommendations addressed toward aviation security. The recommendations were cause for security issues to be revisited in the media and by the aviation industry. These developments necessitated the need for an updated bibliography to review the resulting literature. Many of the articles were written in response to the recommendations made by the Gore Commission. "Aviation Security: An Annotated Bibliography of Responses to the Gore Commission" is the result of this need.

Carrico, John S.↗

Solar Dynamics Observatory Launch and Commissioning

The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

O'Donnell, James R., Jr.↗

Commissioning of a 20 K Helium Refrigeration System for NASA-JSC Chamber A

A new 20 K helium refrigerator installed at NASA Johnson Space Center s Space Environment Simulation Laboratory (SESL) was successfully commissioned and tested in 2012. The refrigerator is used to create a deep space environment within SESL s Chamber A to perform ground testing of the James Webb Space Telescope (JWST). The chamber previously and currently still has helium cryo-pumping panels (CPP) and liquid nitrogen shrouds used to create low earth orbit environments. Now with the new refrigerator and new helium shrouds the chamber can create a deep space environment. The process design, system analysis, specification development, and commissioning oversight were performed by the cryogenics department at Jefferson Lab, while the contracts and system installation was performed by the ESC group at JSC. Commissioning data indicate an inverse coefficient of performance better than 70 W/W for a 18 kW load at 20 K (accounting for liquid nitrogen pre-cooling power) that remains essentially constant down to one third of this load. Even at 10 percent of the maximum capacity, the performance is better than 150 W/W at 20 K. The refrigerator exceeded all design goals and demonstrated the ability to support a wide load range from 10 kW at 15 K to 100 kW at 100 K. The refrigerator is capable of operating at any load temperature from 15 K to ambient with tight temperature stability. The new shroud (36 tons of aluminum) can be cooled from room temperature to 20 K in 24 hours. This paper will outline the process design and commissioning results.

Homan, J.↗

Commissioning of the Mu2e tracker DAQ, planning for the Vertical Slice Test and pre-pattern recognition studies

The primary objective of the Mu2e experiment at Fermilab is to search for the neutrino-less coherent $\mu \rightarrow e$ conversion in the field of an aluminum nucleus ($\mu^- \text{Al} \rightarrow e^- \text{Al}$). The signature of this process is a monochromatic Conversion Electron (CE) with an energy of approximately 104.97 MeV \cite{bartoszek2015mu2e}. Within the Standard Model (SM), the branching ratio for this process, including neutrino masses and oscillation, is expected to be less than $\mathcal{O}(10^{-50})$. This value is far beyond current experimental capabilities. However, models of physics beyond the SM predict much higher relative rates, approaching an observable level. The SINDRUM II experiment set an upper limit on muon conversion at $7 \times 10^{-13}$ (90\% CL) on Au target \cite{SINDRUMII:2006dvw}, and the Mu2e collaboration aims to improve this limit by four orders of magnitude. Observing this process would provide a clear evidence of physics beyond the Standard Model. A brief discussion of the theoretical and experimental aspects is provided in Chapter \ref{intr}. Mu2e adopts a sophisticated experimental setup to achieve its goals, further described in Chapter \ref{mu2echapter}. The central part of the Mu2e detector is the tracker, that consists of 18 tracking stations. The tracker must provide excellent momentum resolution, approximately 1 MeV/c, to distinguish the monochromatic CE signal from the background. To minimize the energy losses, a straw tube tracker will be used \cite{bobbb}. Chapter \ref{chaptertrk} provides an overview of the straw tracker design and its working principles. This Thesis presents a comprehensive study of the Mu2e tracker, covering complementary aspects from initial commissioning to optimization and first steps of the calibration processes. My work at Fermilab has been focused on the complete Data Acquisition (DAQ) testing from both hardware and software perspectives. I was involved in the commissioning of the Mu2e DAQ system and the Vertical Slice Test (VST) of the tracker. The VST encompasses the entire testing chain, from the straws to the readout, and to processed data on disk. I was also focused on the offline analysis, especially on pre-pattern recognition studies, to explore the best methods for identifying $\delta$-electrons during the data taking. Chapter \ref{commissioning} details the commissioning of the tracker DAQ system, emphasizing the importance of understanding of the readout process before the data acquisition. This includes validating the readout logic and firmware through Monte Carlo simulations to confirm functionality and buffering, monitoring the quality of the data from the tracker preamplifiers and front-end electronics, and assessing overall DAQ performance to ensure reliability during future calibration and data-taking. Chapter \ref{planning} discusses the initial steps towards the tracker calibration. The ultimate goal is to perform a time calibration of the first assembled station of the tracker using cosmic muons, aiming for a longitudinal hit position resolution better than 4 cm. This involves determining the signal propagation times and channel-to-channel delays. I performed a Monte Carlo study to determine the impact of the station orientation on the quality of the calibration, in particular on the cosmic track reconstruction, focusing on potential biases that could arise. These studies provide essential insights into the operation, optimization, and calibration of the Mu2e tracker system. Given the high data volume expected during Mu2e operations, estimated at approximately 7 PBytes per year, optimizing memory usage and minimizing CPU consumption are critical. A significant challenge lies in effectively flagging $\delta$-electron hits, which are the primary source of hits in the tracker, without compromising the efficiency of CE hit detection and track reconstruction. A detailed study of pre-pattern recognition and a thorough comparison of two $\delta$-electron flagging algorithms is provided in Chapter \ref{delta}. In Chapter \ref{conclusions}, the findings are concisely summarized, offering a comprehensive synthesis of the research and emphasizing the key insights derived from this study.

43 PARTICLE ACCELERATORS↗

Commissioning Guidance for Energy Savings Performance Contracts (ESPCs)

This Commissioning Guidance for Energy Savings Performance Contracts (ESPCs) is DOE’s official guidance for ordering agencies under the current DOE ESPC IDIQ contract. This guidance document explains how commissioning of energy conservation measures (ECMs) and water conservation measures (WCMs) is incorporated into the ESPC process, roles and responsibilities in project commissioning, and key elements of commissioning. This document updates the previous version, released in 2015. This guidance can also be used as applicable in the development of ESPC ENABLE and UESC performance assurance plans.

Walker, Christine↗

Application of radiochromic gel dosimetry to commissioning of a megavoltage research linear accelerator for small–field animal irradiation studies

To develop and implement an efficient and accurate commissioning procedure for small-field static beam animal irradiation studies on an MV research linear accelerator (Linatron-M9) using radiochromic gel dosimetry. The research linear accelerator (Linatron-M9) is a 9 MV linac with a static fixed collimator opening of 5.08 cm diameter. Lead collimators were manually placed to create smaller fields of 2 × 2 cm 2 , 1 × 1 cm 2 , and 0.5 × 0.5 cm 2 . Relative dosimetry measurements were performed, including profiles, percent depth dose (PDD) curves, beam divergence, and relative output factors using various dosimetry tools, including a small volume ionization chamber (A14), GAFCHROMIC™ EBT3 film, and Clearview gel dosimeters. The gel dosimeter was used to provide a 3D volumetric reference of the irradiated fields. The Linatron profiles and relative output factors were extracted at a reference depth of 2 cm with the output factor measured relative to the 2 × 2 cm 2 reference field. Absolute dosimetry was performed using A14 ionization chamber measurements, which were verified using a national standards laboratory remote dosimetry service. Absolute dosimetry measurements were confirmed within 1.4% (k = 2, 95% confidence = 5%). The relative output factor of the small fields measured with films and gels agreed with a maximum relative percent error difference between the two methods of 1.1 % for the 1 × 1 cm 2 field and 4.3 % for the 0.5 × 0.5 cm 2 field. These relative errors were primarily due to the variability in the collimator positioning. The measured beam profiles demonstrated excellent agreement for beam size (measured as FWHM), within approximately 0.8 mm (or less). Film measurements were more accurate in the penumbra region due to the film’s finer resolution compared with the gel dosimeter. Following the van Dyk criteria, the PDD values of the film and gel measurements agree within 11% in the buildup region starting from 0.5 cm depth and within 2.6 % beyond maximum dose and into the fall-off region for depths up to 5 cm. The 2D beam profile isodose lines agree within 0.5 mm in all regions for the 0.5 × 0.5 cm 2 and the 1 × 1 cm 2 fields and within 1 mm for the larger field of 2 × 2 cm 2 . The 2D PDD curves agree within approximately 2% of the maximum in the typical therapy region (1–4 cm) for the 1 × 1 cm 2 and 2 × 2 cm 2 and within 5% for the 0.5 × 0.5 cm 2 field. This work provides a commissioning process to measure the beam characteristics of a fixed beam MV accelerator with detailed dosimetric evaluation for its implementation in megavoltage small animal irradiation studies. Radiochromic gel dosimeters are efficient small-field relative dosimetry tools providing 3D dose measurements allowing for full representation of dose, dosimeter misalignment corrections and high reproducibility with low inter-dosimeter variability. Altogether, radiochromic gels are valuable for fast, full relative dosimetry commissioning in comparison to films for application in high-energy small-field animal irradiation studies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

1.2.4.403 - Pumped Storage Hydropower FAST Commissioning Prize

The Pumped Storage Hydropower (PSH) FAST Commissioning Prize aimed to reduce the time, cost, and risk required to commission PSH projects by crowdsourcing ideas via a three-stage prize. Objectives were to reduce the time to commission PSH projects from 10+ years to less than 5 years and to develop a baseline analysis for PSH.

HYDRO ENERGY↗

Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB

The Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) consists of a newly constructed linear accelerator and fragment separator that are designed for enhanced production rates of rare isotopes for use in research and other societal applications. Recent activities through to August 2022 took place to commission the Advanced Rare Isotope Separator (ARIS) and carry out the first experiments. This followed commissioning of the newly constructed linac that is designed to provide orders of magnitude higher beam power than the previously coupled cyclotrons. This required that more advanced target, beam dump, and collimation systems of the new separator be designed and constructed to sustain unprecedented conditions by heavy ion beams. Commissioning with ~1 kW beams began recently and results from activities that began in late 2021 are reported here. Comparisons between the previous and current facilities are provided.

43 PARTICLE ACCELERATORS↗

First on-line commissioning experiments at the St. Benedict facility

Nuclear beta decays provide an excellent probe of fundamental symmetries due to their mediation by the weak interaction. In particular, precise measurements of these decays provide constraints on the unitarity of the Cabbibo-Kobayashi-Maskawa (CKM) quark-mixing matrix. While superallowed pure Fermi decays currently set the most precise limits, the alternative suite of superallowed mixed mirror decays has been ill-studied. These nuclei can provide an important consistency check of calculation and measurement methods employed for the pure Fermi decays, more critically needed now in the wake of a 2.4σ deviation from unitarity of the CKM matrix. In order to remedy the gap in data for mirror decays, the Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) facility is being commissioned at the University of Notre Dame’s Nuclear Science Laboratory (NSL). In this paper, we present first results of the commissioning of the St. Benedict facility on-line at the TwinSol radioactive beam facility. The results of initial commissioning experiments involving the St. Benedict gas catcher, RF carpet, RFQ ion guide and RFQ cooler-buncher will be presented.

beta decay↗

Commissioning of a replacement subatmospheric cold box for Jefferson Lab’s Central Helium Liquefier

Jefferson Lab’s Cryogenics Department has designed, fabricated, installed, and commissioned a new subatmospheric cold box to replace one of the two existing units within our Central Helium Liquefier (CHL). The replacement cold box, dubbed SC1R, pumps saturated helium vapor at 0.0385 atm from Jefferson Lab’s continuous electron beam accelerator facility (CEBAF) cryomodules to maintain an operating temperature of nominally 2.1 K. This is accomplished using a five-stage cryogenic centrifugal compressor (cold compressor) system and a brazed aluminum plate-fin heat exchanger operating between 2.1 K and 4.5 K. In this paper we will describe our experience commissioning the SC1R cold box. We will discuss pump-down of the system to 2.1 K and steady-state operation at the cold compressor design flow rates of 170, 200, and 250 g/s. Performance of the heat exchanger and cold compressors has been mapped across a range of flow rates and optimized for CEBAF operations. This commissioning data will be used to monitor future performance and adapt to changing load requirements.

Mastracci, B.↗

Commissioning of the large-scale lead tungstate scintillating calorimeter

Here, we report on the installation and initial commissioning of a large-scale lead tungstate (PbWO4) scintillating crystal calorimeter developed for high-rate photon detection and precise energy measurement. The calorimeter comprises 1596 high-granularity, high-resolution scintillating crystals optimized for electromagnetic-shower detection over a wide energy range. Scintillation light from each crystal is read out by Hamamatsu R4125 photomultiplier tubes equipped with a custom voltage divider and front-end amplifier to ensure stable gain at high rates. All calorimeter modules were fabricated and characterized using a light-emitting diode–based optical test system prior to installation to verify uniformity and photodetector performance. After installation, the electromagnetic calorimeter was fully integrated into the experiment data acquisition and energy-based trigger systems. The optical response of the modules was equalized using the light-monitoring system, cosmic-ray muons, and photons from Compton-scattering events. Commissioning results demonstrate a reliably calibrated optical response and stable detector performance during the first run. These results validate the calorimeter design and commissioning methodology for large-scale scintillator-based photonic instrumentation.

Analog to digital converters↗

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25

An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.

Accelerator Physics↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m$^3$ membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

43 PARTICLE ACCELERATORS↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m3 membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

Geynisman, Michael [Fermilab]↗

Sensorium: commissioning abundant sensors with augmented reality and QR codes

In the future, it will be possible to build high-quality models of building interiors based on data from a dense fleet of sensors reporting on air volumes much smaller than a room or zone. To enable such models, we are creating technologies that allow a fleet of sensors to be commissioned quickly at low cost. Our sensor commissioning process builds a 3D model of each building interior that includes sensor positions and sensor networking information such as sensor MAC addresses. It employs multiple technologies, including augmented reality, LiDAR, QR codes, and computer vision. Sensors can be commissioned at more than 10x the speed and at less than one tenth the cost of traditional approaches.

Bier, Eric A.↗

Geothermal research and development program of the US Atomic Energy Commission

Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

Werner, L. B.↗

Report of the Presidential Commission on the Space Shuttle Challenger Accident, Volume 1

The findings of the Commission regarding the circumstances surrounding the Challenger accident are reported and recommendations for corrective action are outlined. All available mission data, subsequent tests, and wreckage analyses were reviewed and specific failure scenarios were developed. The Commission concluded that the cause of the Mission 51-L accident was the failure of the pressure seal in the aft field joint of the right solid rocket motor. The failure was due to a faulty design unacceptably sensitive to a number of factors. These factors were the effects of temperature, physical dimensions, the character of materials, the effects of reuse, processing, and the reaction of the joint to dynamic loading. In addition to analyzing the material causes of the accident, the Commission examined the chain of decisions that culminated in approval of the launch. It concluded that the decision making process was flawed in several ways including (1) failure in communication resulting in a launch decision based on incomplete and misleading information, (2) a conflict between engineering data and management judgements, and (3) a NASA management structure that permitted flight safety problems to bypass key Shuttle managers.

Rogers, W. P.↗