Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commercial service provider”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

Source record↗

Urban Air Mobility (UAM) Vision Concept of Operations (ConOps) UAM Maturity Level (UML)-4 Overview

The Vision ConOps is intended as a foundation to engage members of the UAM community and provide a consensus on the future vision of UAM operations. It provides a concept for more detailed discussion and a basis for the exploration of ideas using a common framework to inform the continued development and integration of UAM as part of the broader transportation system. Advanced Air Mobility (AAM) encompasses a range of innovative aviation technologies (small drones, electric aircraft, automated air traffic management, etc.) that are transforming aviation’s role in everyday life, including the movement of goods and people. Urban Air Mobility (UAM) represents one of the most exciting and complex AAM concepts with highly automated aircraft, providing commercial services to the public over densely populated cities.

Brian Hill↗

Specifying Calibration of Energy-Measuring Equipment

Instruments and standards need to be calibrated periodically to ensure that their use yields accurate measurements. Calibration needs, however, vary in sophistication, based on user expectations. This white paper reviews calibration terminology and standards, and describes best practices that have been developed for a) calibrating measurement equipment to ensure some known level of accuracy, and b) accrediting calibration service providers. Calibration is discussed in the context of metrological traceability, and excerpts from laboratory scopes of accreditation are shared to reveal the diversity of terminology and format among them. In an effort to aid those who currently calibrate measuring equipment or who have new or changing needs for calibrating measuring equipment, rationale is provided for why a specification might be used to request calibration services that meet specific test needs. Given the growing interest in using data to manage the energy consumption of systems, and the increasing number and variety of systems (e.g., building, computing) that can report such information, use cases requiring energy data are used to facilitate further discussion and provide examples. Commercially available service providers who are accredited for energy-measuring equipment calibration are compared and contrasted, and a specification template that might be used for requesting this calibration is presented. The specification template should be tailored to meet each user’s needs. To illustrate, an example set of energy-measuring-equipment test conditions (reflecting the planned usage of the device to be calibrated) is used to develop a customized calibration specification, and commercially available service providers are assessed in terms of their qualifications for calibration to that particular implementation of the specification template.

47 OTHER INSTRUMENTATION↗

The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the established NASA test range and the state-sponsored, commercial launch facility provider, in an attempt to satisfy the needs for flexible, low-cost access to space. Furthermore, the future of the NASA/Wallops Test Range is closely linked with the success of VCSFA in promoting commercial launches from Wallops. This paper will describe the changing paradigm of the federal launch range and the unique aspects of the NASA/Wallops Facility relationship with VCSFA. Discussion will include institutional cost-sharing, business development and marketing, joint educational programs, and strategic planning.

Underwood, Bruce E.↗

NASA's Progress Toward Commercial Space Communications — SATCOM Demonstrations and Wideband Multilingual Terminal Development

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program is continuing to forge a path toward programmatic and operational transformation enabling commercialization of communications and navigation services to the greatest extent possible for near Earth users. U.S. National Space Policy is driving government agencies to incorporate commercial offerings and services to the maximum extent possible. As such, NASA has no plans to build or deploy additional Tracking and Data Relay Satellites (TDRS), but will seek to fill NASA mission space-relay capability needs using commercial satellite communications (SATCOM) providers and services. The goal is to support an approach that is both flexible to commercial service constructs and provides continuity of support with current assets as long as required. Progress toward commercial services is advancing in two key areas: (1) awards have been made for demonstrations of SATCOM services, and (2) development of wideband and multilingual user terminals has advanced to the flight demonstration phase. The Communications Services Project (CSP) at Glenn Research Center (GRC), has awarded Funded Space Act Agreements (FSAA) to six industry vendors. Inmarsat Government Inc., Kuiper Government Solutions (KGS) LLC, SES Government Solutions, Space Exploration Technologies, Telesat U.S. Services LLC, and Viasat Incorporated will receive a combined $278.5 million to complete technology development and in-space demonstrations over the next several years. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. In the current market, industry vendors operate at a range of different frequencies and use variable, sometimes proprietary, coding and modulations schemes. As NASA strives for a network comprised of services provided by multiple distinct suppliers, interoperability is a fitting solution to unify the network. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. This paper provides a discussion of the progress toward NASA’s commercial space communications goals and consideration of key challenges and next steps.

commercialization↗

NASA’s Progress Toward Commercial Space Communications—SATCOM Demonstrations and Wideband Multilingual Terminal Development

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program is continuing to forge a path toward programmatic and operational transformation enabling commercialization of communications and navigation services to the greatest extent possible for near Earth users. National Space Policy is driving government agencies to incorporate commercial offerings and services to the maximum extent possible. As such, NASA has no plans to build or deploy Tracking and Data Relay Satellites, but will seek to fill NASA mission space-relay capability needs using commercial satellite communications (SATCOM) providers and services. The goal is to support an approach that is both flexible to commercial service constructs and provides continuity of support with current assets as long as required. Progress toward commercialization is advancing in two key areas: (1) awards have been made for demonstrations of SATCOM services, and (2) development of wideband and multilingual user terminals has advanced to the flight demonstration phase. The Communications Services Project (CSP) at Glenn Research Center (GRC), has awarded Funded Space Act Agreements (FSAA) to six industry vendors. Inmarsat Government Inc., Kuiper Government Solutions (KGS) LLC, SES Government Solutions, Space Exploration Technologies, Telesat U.S. Services LLC, and Viasat Incorporated received a combined $278.5 million to complete technology development and in-space demonstrations over the next several years. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. In the current market, industry vendors operate at a range of different frequencies and use variable, sometime proprietary, coding and modulations schemes. As NASA strives for a network comprised of services provided by multiple distinct suppliers, interoperability is a fitting solution to unify the network. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. This paper provides a discussion of the progress toward NASA’s commercial space communications goals and consideration of key challenges and next steps.

space communications↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Interoperability and Concepts of Operation Assessment for Space Relay Services and Partnerships

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.

Eric J Knoblock↗

ISS Crew Transportation and Services Requirements Document

Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document with its sister documents, Crew Transportation Technical Management Processes (CCT-PLN-1120), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), and Crew Transportation Operations Standards (CCT-STD-1150), and International Space Station (ISS) to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase of the NASA Commercial Crew Program (CCP).

Commercial Crew Program↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

2015 Annual Report for the Flight Opportunities Program

Welcome to this third edition of the Flight Opportunities program annual report. In this edition, we continue our story of pathfinding NASA's role in the partnership with the U.S. commercial space and space technology R&D communities to advance national space interests and develop technologies critical to NASA's future missions. 2015 was the year in which a planned change to our payload solicitation strategy saw its first tangible result. As you might remember from our 2014 annual report, in 2015 we set out to facilitate a more direct interaction between flight providers and technology developers by providing fixed funding awards to researchers to directly purchase the flight service(s) that best meet their needs. The selection and award of the first six REDDI-F1 flight grants to non-U.S. government researchers was an important milestone in this regard. From now on, using the REDDI-F1 solicitation appendix, the program will enable non-U.S. government researchers to directly purchase flight services on the emerging suborbital market. The same (or similar) commercial flight services will be available to NASA and other U.S. government agencies (OGA) through commercial contracts that NASA has established through our program. For the latter, our program is available to provide campaign management services, similar to the role we play(ed) for technology payloads remaining in our pool from earlier selections. The full impact of this broader strategic change will likely become more visible in the years ahead as our legacy pool gets depleted and we have implemented a new NASA- and OGA-specific call for proposals. One observation that can already be made after two rounds of REDDI-F1 solicitations is that through this change, the list of commercial flight service providers of interest to non-U.S. government researchers has grown from five in 2014 to nine in 2015. On the industry development front, our Announcement of Collaborative Opportunities (ACO) solicitation was promoted to an STMD-wide solicitation and released in 2015 in combination with the Tipping Point solicitation. A total of 22 awards was announced in November 2015, 12 of which are ACO awards, and six of these are funded by Flight Opportunities. Through these ACO awards, the program funds NASA technical expertise and NASA test facilities to aid industry partners in maturing key space technologies, in our case focusing on small launch vehicle technology development. Flight test activity in 2015 saw a steady 13 campaigns with 31 payload-flights (29 unique payloads). Thirteen new payloads were selected into the program in FY2015, and 14 payloads completed flight testing, bringing the total number of completed technology demonstration payloads to 69. Overall, we are pleased with the evolution and growth of the Flight Opportunities program and look forward to continued success in our partnership with the technology R&D community and the commercial space sector.

Flight Testing↗

Commercial building loads providing ancillary services In PJM

The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

MacDonald, Jason↗

Wireless Telemetry and Command (T and C) Program

The Wireless Telemetry and Command (T&C) program is to investigate methods of using commercial telecommunications service providers to support command and telemetry services between a remote user and a base station. While the initial development is based on ground networks, the development is being done with an eye towards future space communications needs. Both NASA and the Air Force have indicated a plan to consider the use of commercial telecommunications providers to support their space missions. To do this, there will need to be an understanding of the requirements and limitations of interfacing with the commercial providers. The eventual payoff will be the reduced operations cost and the ability to tap into commercial services being developed by the commercial networks. This should enable easier realization of EP services to the end points, commercial routing of data, and quicker integration of new services into the space mission operations. Therefore, the ultimate goal of this program is not just to provide wireless radio communications for T&C services but to enhance those services through wireless networking and provider enhancements that come with the networks. In the following chapters, the detailed technical procedure will be showed step by step. Chapter 2 will talk about the general idea of simulation as well as the implementation of data acquisition including sensor array data and GPS data. Chapter 3 will talk about how to use LabVEEW and Component Works to do wireless communication simulation and how to distribute the real-time information over the Internet by using Visual Basic and ActiveX controls. Also talk about the test configuration and validation. Chapter 4 will show the test results both from In-Lab test and Networking Test. Chapter 5 will summarize the whole procedure and give the perspective for the future consideration.

Jiang, Hui↗

Crew Transportation Technical Management Processes

Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.

Summary of the technical management process↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Framework for NASA Space Relay Satellite Services over the Next Decade: “Development and Demonstration of the Commercial Successors to TDRS “

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the Agency has no plans to replenish the Tracking and Data Relay Satellite System (TDRSS) fleet operated by the Space Communication and Navigation Program (SCaN) and will instead pursue commercial services for communications with spacecraft in near-Earth orbit. The Communication Services Project (CSP) at GRC is leading this commercialization effort and in May 2022 it awarded six contracts to commercial SATCOM companies to demonstrate and validate commercial SATCOM capabilities for future NASA missions. The responses from the vendors indicated a strong interest in providing commercial services to NASA’s missions, and included a wide range of proposed architectures and demonstrations ideas. Overall, the responses indicated that a mature and healthy competitive environment exists with traditional satellite operators and constellation developers to provide NASA with commercial communication services in the next five years. This paper will present an overview of the proposed capability coverages, risk spread and US domestic market stimulation along with common themes and conclusions. The result of these demonstrations will serve as the basis for acquisition and provision of operational SATCOM services for NASA missions.

George F Haddad↗