Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cleaning performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Excerpt from Oxygen Monitor Clean Testing Report Performed in 2010

The Rosemount X-STREAM Series X2GP is a paramagnetic oxygen analyzer with a 0-25% oxygen measurement range. It claims a drift less than 2% of span (0.10% volume oxygen) per week, and a response time of less than 5 seconds (for the analyzer to report 90% of a step change). Our test equipment was set-up such that the same gas was running through each oxygen analyzer at the same time. This allowed Calibration Error, Calibration Drift, and Loss of Power Testing to be run on all monitors at the same time, eliminating any variability between the analyzers from tolerances in the gas cylinder, ambient temperature, ambient pressure, test duration, etc. An APTech pressure regulator was placed on the gas cylinder manifold and a 23 psia Paroscientific pressure transducer measured the regulator’s outlet pressure. This did not give the inlet pressure on any one analyzer but outlet pressure from the manifold before the stream was split. The APTech pressure regulator was used to keep operating conditions consistent. A DWYER rotameter was installed on each oxygen monitor’s outlet piping. With the exception of Variation of Flow Rate Testing, the rotameter was left fully open for all testing. The flow rate through each oxygen monitor was controlled by a Swagelok needle valve that was installed on each analyzer’s inlet piping. Additionally, a filter was installed in the each monitor’s inlet piping to keep particles from the measurement cells and a Swagelok ball valve was installed on each monitor’s outlet piping to isolate each monitor between tests. No pumps were installed. Each of the cylinders used was at a pressure greater than ambient room barometric pressure. This pressure differential was used to move gas through the testing equipment. The flow rate through each analyzer was controlled by the Swagelok needle valve installed on each analyzer’s inlet piping. Finally, for all tests, a Paroscientific Digiquartz Barometer was used to measure ambient room barometric pressure and a Fluke Thermo-hygrometer was used to measure ambient room temperature.

47 OTHER INSTRUMENTATION↗

Filtration of Hanford Tank 241-AN-107 Supernatant at 16 °C

Approximately 9 liters of supernatant from Hanford waste tank 241-AN-107 was delivered by Washington River Protection Solutions to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory. The thirty-six AN-107 sample bottles consisted of six sets of six samples, with each set pulled from a unique tank sampling level. Prior to testing, samples from each level were composited to provide nominally level-independent feed for dead end filtration and ion exchange testing. The composited 241-AN-107 supernatant was chilled to 16 °C for 1 week prior to testing. Filtration testing was then conducted using a backpulse dead-end filter (BDEF) system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the RPL. The purpose of this testing is to a) demonstrate dead-end filtration (DEF) of AN-107 feed at reduced temperature to obtain prototypic tank side cesium removal (TSCR) flux rates and identify issues that may impact filtration after dilution to 5.5M Na, and b) provide feed for a follow on ion exchange unit operation. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 . During filtration the differential pressure required to effect filtration at 0.065 gpm/ft 2 was slow to increase for most of the filtration campaign. After all the feed bottles had been pumped into the slurry reservoir, the bottoms of the bottles were added to the reservoir and transmembrane pressure (TMP) reached 2.0 psid (the TSCR action limit). The prototypic filter cleaning process was unable to effectively restore filter performance, and cleaning with oxalic acid was required before flow through the filter could be restored. This indicates that the Media Grade 5 filter may require an alternative cleaning protocol when processing AN-107 supernatant. After completing filtration of the AN-107 feed, the filter was cleaned. Solids concentrated from the backpulse solutions were composed of natrophosphate, Mn-Fe phases, and fluoro-natrophosphate that occurred as particle agglomerates. The individual particles were in some cases 100s of micrometers across which is consistent with prior observations from AN-107 supernate waste characterizations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical determination of propeller performance degradation due to ice accretion

A computer code capable of computing the propeller performance for clean, glaze, or rime ice propeller configurations to determine the performance degradation resulting from a given icing encounter has been developed. The inviscid, incompressible flowfield at each specified propeller radial location is first computed using the Theodorsen method. A droplet trajectory computation then calculates the droplet impingement points and airfoil collection efficiency for each radial location. User-selectable empirical correlations are available for determining the aerodynamic penalties due to ice accretion. Propeller performance is finally computed using strip analysis for either the clean or iced propeller. In the iced mode, the thrust and torque coefficient equations are modified by the drag and lift coefficient increments due to ice to obtain the appropriate iced values. Comparison with available experimental propeller icing data shows generally good agreement. The code's capability of properly predicting the thrust coefficient, power coefficient, and propeller efficiency of an iced propeller is shown to be dependent on the choice of empirical correlation employed as well as on the proper specification of the radial icing extent and propeller blade angle.

Miller, T. L.↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

Optics↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

James Webb Space Telescope↗

Advanced Manufacturing of Alpha Double Prime Iron Nitride (ADPIN): An Innovative Rare Earth Element (REE) Free Ultra-High Performance Permanent Magnet for Clean Energy Applications

Iron nitride magnets offer the potential for large magnetic remanence magnets absent any rare earth materials [1]. This project was submitted in response to the funding opportunity announcement (FOA) from the Advanced Manufacturing Office (AMO) of the Office of Energy Efficiency & Renewable Energy (EERE) of the Department of Energy (DOE): DE-FOA-0001465: Advanced Manufacturing Projects for Emerging Research Exploration; Topic Area 1: Advanced Materials; Subtopic 1.1: Innovative Advanced Materials Manufacturing for Clean Energy to explore nitriding iron powder using a fluidized bed technique which if successful would accomplish nitriding the iron powder with reduce industrial energy intensity. Of particular concern when using metal powders at high temperatures in a fluidized bed reactor is the defluidization temperature of the bed, also known as the ‘bed collapse’ temperature. Above the defluidization temperature the metal powders can no longer fluidize and instead become an undesirable packed powder bed. Using the published results from the Institute of Process Engineering at the Chinese Academy of Sciences in Beijing, China, FeNix Magnetics was able to develop a spreadsheet calculation that allowed predictive guidelines for the defluidization temperature of iron powder based on the type of carrier gas, flow rate of the carrier gas, and the iron powder diameter. FeNix Magnetics was not able to conclude whether the temperatures to avoid bed defluidization that were achievable in a fluidized bed reactor actually resulted in nitriding the iron powder to the required level. In order to measure the amount of nitrogen in the iron powder, FeNix Magnetics contracted with the DOE sponsored Advanced Photon Source (APS) at Argonne National Laboratory to conduct X-Ray diffraction measurements. Unfortunately, due to COVID-19 restrictions, the DOE sponsored APS was closed and unable to provide X-Ray Diffraction measurements during this program.

36 MATERIALS SCIENCE↗

Origins of wear-induced tungsten corrosion defects in semiconductor manufacturing during tungsten chemical mechanical polishing

During chemical mechanical polishing (CMP) process optimization, a unique corrosion defect was identified in the tungsten (W) contact plugs, which were investigated to develop practical solutions to improve CMP mass productivity. The corrosion defect occurred in the absence of external incident energy and was observed to occur only at the W plugs connected to the P + /n-well close to the wafer edge. To examine the root cause of the corrosion, a series of experiments was carried out at each W CMP step, using in-line defect inspection. Additional experiments were conducted using on-line inductively coupled plasma mass spectrometry (ICP-MS) to understand pH- and potential-dependent electrochemical dissolution behaviors of W. Experimentally, W corrosion was confirmed to be exacerbated if the surface oxide of the W plugs is removed by the deionized water (DIW) rinsing step under wafer pressurization, then exposed to DIW and alkaline cleaning solution. Although the DIW rinsing step is commonly performed to clean polishing pads right after the main polishing, a small amount of applied pressure (0.5 psi) without slurry supply can lead to corrosion defects. Finally, this wear-induced corrosion of the W plugs can be prevented by removing the applied pressure during the post DIW rinsing step of W CMP.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Metal-assisted etch combined with regularizing etch

In an aspect of the disclosure, a process for forming nanostructuring on a silicon-containing substrate is provided. The process comprises (a) performing metal-assisted chemical etching on the substrate, (b) performing a clean, including partial or total removal of the metal used to assist the chemical etch, and (c) performing an isotropic or substantially isotropic chemical etch subsequently to the metal-assisted chemical etch of step (a). In an alternative aspect of the disclosure, the process comprises (a) performing metal-assisted chemical etching on the substrate, (b) cleaning the substrate, including removal of some or all of the assisting metal, and (c) performing a chemical etch which results in regularized openings in the silicon substrate.

36 MATERIALS SCIENCE↗

Wiltech Component Cleaning and Refurbishment Facility CFC Elimination Plan at NASA Kennedy Space Center

The Wiltech Component Cleaning & Refurbishment Facility (WT-CCRF) at NASA Kennedy Space Center performs precision cleaning on approximately 200,000 metallic and non metallic components every year. WT-CCRF has developed a CFC elimination plan consisting of aqueous cleaning and verification and an economical dual solvent strategy for alternative solvent solution. Aqueous Verification Methodologies were implemented two years ago on a variety of Ground Support Equipment (GSE) components and sampling equipment. Today, 50% of the current workload is verified using aqueous methods and 90% of the total workload is degreased aqueously using, Zonyl and Brulin surfactants in ultrasonic baths. An additional estimated 20% solvent savings could be achieved if the proposed expanded use of aqueous methods are approved. Aqueous cleaning has shown to be effective, environmentally friendly and economical (i.e.. cost of materials, equipment, facilities and labor).

Williamson, Steve↗

Cleaning verification by air/water impingement

This paper will discuss how the Kennedy Space Center intends to perform precision cleaning verification by Air/Water Impingement in lieu of chlorofluorocarbon-113 gravimetric nonvolatile residue analysis (NVR). Test results will be given that demonstrate the effectiveness of the Air/Water system. A brief discussion of the Total Carbon method via the use of a high temperature combustion analyzer will also be given. The necessary equipment for impingement will be shown along with other possible applications of this technology.

Jones, Lisa L.↗

Analytical determination of propeller performance degradation due to ice accretion

A computer code has been developed which is capable of computing propeller performance for clean, glaze, or rime iced propeller configurations, thereby providing a mechanism for determining the degree of performance degradation which results from a given icing encounter. The inviscid, incompressible flow field at each specified propeller radial location is first computed using the Theodorsen transformation method of conformal mapping. A droplet trajectory computation then calculates droplet impingement points and airfoil collection efficiency for each radial location, at which point several user-selectable empirical correlations are available for determining the aerodynamic penalities which arise due to the ice accretion. Propeller performance is finally computed using strip analysis for either the clean or iced propeller. In the iced mode, the differential thrust and torque coefficient equations are modified by the drag and lift coefficient increments due to ice to obtain the appropriate iced values. Comparison with available experimental propeller icing data shows good agreement in several cases. The code's capability to properly predict iced thrust coefficient, power coefficient, and propeller efficiency is shown to be dependent on the choice of empirical correlation employed as well as proper specification of radial icing extent.

Miller, T. L.↗

An Investigation on the Pollen-Induced Soiling Losses in Utility-Scale PV Plants

Here in this study, the impact of pollen as a PV soiling agent is investigated. The performance data of five utility-scale PV plants in North Carolina, USA, was collected and analyzed using two soiling extraction methods. Satellite and environmental data, including pollen counts, cropland, and vegetation, was also collected and analyzed to identify impacts to soiling losses. During the spring peak pollen season, performance losses of >15% were observed at all five sites. Partial performance recoveries following the pollen season were slow, with lack of correlation with rainfall. This means that the statistical soiling estimation methods that assume abrupt performance recovery from rain are not appropriate for pollen-impacted solar sites. When manual cleanings were performed on site the performance recovery ranged from 5% to 11% indicating persistent soiling impacts are present in this region. The results of this work provide new insights into the phenomenon of pollen deposition on PV systems, demonstrating that 1) soiling can also affect systems located in rainy locations and 2) that its effects cannot be determined using the current estimation methodologies.

14 SOLAR ENERGY↗

Verifying Dissolution Of Wax From Hardware Surfaces

Wax removed by cleaning solvent revealed by cooling solution with liquid nitrogen. Such improved procedure and test needed in case of hardware that must be protected by wax during machining or plating but required to be free of wax during subsequent use. Improved cleaning procedure and test take less than 5 minutes. Does not require special skill or equipment and performs at cleaning site. In addition, enables recovery of all cleaning solvent.

Montoya, Benjamina G.↗

Analytical prediction of the performance and stability of a J85-13 compressor with distorted inlet flow

The parallel compressor concept was studied using a compressor model based on the overall clean-inlet performance map obtained from experimental tests in an altitude chamber using a General Electric J85-13 turbojet engine. The model, which includes a static-pressure balance calculation at compressor discharge, was exercised at conditions corresponding to 10 different screen-induced distortion patterns included in the experimental data base. The spoiled area of these patterns ranged from 30 deg to 180 deg, and the distortion screen density, or the area blocked by the screen wire per unit area of screen, varied from 26 to 69 percent. The study indicates that at the higher corrected speeds, the analytical surge lines obtained are good representations of the corresponding experimental surge lines and are independent of distortion angle or distortion angle or distortion level.

Milner, E. J.↗

Ariane 5 Fairing Preparations for James JWST Space Telescope

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The Ariane 5 payload faring (PLF), as shown in Figure 1, interior and Vehicle Equipment Bay membranes received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. Investigation of PLF cleanliness began early in the JWST program to test the Fairing Acoustic Protection (FAP) panels. Initial PLF cleaning was performed at RUAG in Switzerland prior to shipment to the launch site in collaboration with NASA and ESA. The cleaning procedure used at RUAG premises was based on heritage of the PLF cleaning procedure for ESA/Herschel-Planck and NASA/Mars2020 missions on an Atlas V launcher. The Ariane 5 fairing was packaged in a clean manner and inspected and cleaned upon arrival to CSG. Silicon wafers and particle fall out (PFO) plates were used to monitor the internal fairing cleanliness prior to encapsulation. Just after encapsulation, PFO plates and calcium fluoride (CaF2) crystals were placed inside the fairing on a specific tool door for monitoring the cleanliness inside the fairing during the ventilation phase. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. Fairing cleanliness was achieved and mitigated contamination distribution upon launch.

James Webb Space Telescope↗

Blade row dynamic digital compressor program. Volume 1: J85 clean inlet flow and parallel compressor models

The results are presented of a one-dimensional dynamic digital blade row compressor model study of a J85-13 engine operating with uniform and with circumferentially distorted inlet flow. Details of the geometry and the derived blade row characteristics used to simulate the clean inlet performance are given. A stability criterion based upon the self developing unsteady internal flows near surge provided an accurate determination of the clean inlet surge line. The basic model was modified to include an arbitrary extent multi-sector parallel compressor configuration for investigating 180 deg 1/rev total pressure, total temperature, and combined total pressure and total temperature distortions. The combined distortions included opposed, coincident, and 90 deg overlapped patterns. The predicted losses in surge pressure ratio matched the measured data trends at all speeds and gave accurate predictions at high corrected speeds where the slope of the speed lines approached the vertical.

Tesch, W. A.↗

Conditioning flat conductors for flat conductor cable production

Apparatus can straighten, anneal, clean, and a tension to stretch a cable one percent to assure uniform cross-sectional area. A conductor passes through temperature controlled distilled water and through a toroid coil. As The conductor enters the water, steam performs the cleaning action. Quenching and annealing also take place.

Source record↗