Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “checklists”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Equipment Self-Assessment Guide Checklist

This Equipment Self-Assessment Checklist is designed for asset owners and operators (AOOs) responsible for the deployment, operation, maintenance, or cybersecurity oversight of grid systems and digital energy technologies. It provides a structured inspection checklist for evaluating the security, integrity, and operational trustworthiness of equipment across substations, generation sites, distributed energy resources (DERs), and control environments.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Preparing Solar Photovoltaic Systems Against Storms. Pre-Storm Solar PV Checklist: Distributed Roof-Mounted Systems

Through funding provided by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has used subject matter experts to compile a set of checklists to help Puerto Rico and other communities prepare for storms. Renewable energy and distributed energy systems have the potential to provide power to neighborhoods, vulnerable residents, and certain facilities within a community, if those systems are designed to provide power during a grid disruption. The storm-hardening checklists provide storm preparation actions that can increase the chances that solar photovoltaic (PV) systems are available when communities need them most. This resource was translated from English to Spanish for greater acessibility.

disaster preparedness↗

Preparing Solar Photovoltaic Systems Against Storms. Pre-Storm Solar PV Checklist: Utility-Scale Ground-Mounted Systems

Through funding provided by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has used subject matter experts to compile a set of checklists to help Puerto Rico and other communities prepare for storms. Renewable energy and distributed energy systems have the potential to provide power to neighborhoods, vulnerable residents, and certain facilities within a community, if those systems are designed to provide power during a grid disruption. The storm-hardening checklists provide storm preparation actions that can increase the chances that solar photovoltaic (PV) systems are available when communities need them most. This resource was translated from English to Spanish for greater accessibility.

POWER TRANSMISSION AND DISTRIBUTION,SOLAR ENERGY↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Home Owners Association Checklist

The following checklist is to assist in determining if a Solar Installation can be prohibited or forced to relocate in accordance with Texas House Bill Number 362.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GHG Emissions Reduction Audit: A Checklist for Owners

This guidance and accompanying checklist detail recommended services and deliverables for a building-level greenhouse gas (GHG) emissions reduction audit focused on Scope 1 and 2 GHG emissions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Checklist for managing a general program evaluation study

This checklist for managing a general program evaluation study provides action items covering the following topics: initial planning; evaluation design and procurement; implementation of study; and using evaluation results.

Checklist↗

Draft Guidance: Response, Remediation, and Recovery Checklist for Chemically Contaminated Facilities

A key part of preparedness in the event of a chemical warfare agent (CWA) or toxic industrial chemical (TIC) release at a large facility, such as an airport or subway, is to develop a concept of operations that allows for an effective incident response and recovery. This document is intended as a component of the concept of operations and will be used in the Emergency Operations Center (EOC) as a decision tool for the Unified Command (UC). The Checklist for Facility Response, Remediation, and Recovery presented in this document is principally focused on the Consequence Management Phase (see Figure 1; LLNL 2007a and 2007b) of a chemical release. Information in this document conforms to the National Response Plan (NRP) (DHS 2004) and the National Incident Management System (NIMS 2004). Under these two guidance documents, personnel responsible for managing chemical response and recovery efforts--that is, the decision-makers--are members of an Incident Command (IC), which is likely to transition to a UC in the event of a CWA or TIC attack. A UC is created when more than one agency has incident jurisdiction or when incidents cross political jurisdictions. The location for primary, tactical-level command and management is referred to as the Incident Command Post (ICP), as described in the NRP. Thus, regardless of whether an IC or a UC is used, the responsible entities are located at an ICP. Agencies work together through designated members of the UC to establish their designated Incident Commanders at a single ICP and to establish a common set of objectives and strategies and a single Incident Action Plan. Initially during the Crisis Management Phase (see Figure 1), the Incident Commander is likely to be the Chief of the fire department that serves the affected facility. As life-safety issues are resolved and the Crisis Management Phase shifts to the Consequence Management Phase, the work of characterization, decontamination, and facility clearance begins. There will likely be a coincident transition in organizational structure as well, and new remediation-focused groups, units, and personnel will be added as remediation needs are anticipated. In most cases, a UC would be formed, if not formed already, to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The UC would likely include the Transportation Facility Manager or Emergency Operations Manager; representatives from state and local public health, environmental, and emergency management agencies; and Federal agencies, such as the U.S. Environmental Protection Agency.

54 ENVIRONMENTAL SCIENCES↗

Public EV Charging Station Site Selection Checklist

The Joint Office of Energy and Transportation (Joint Office) provides technical assistance on planning and implementation of a national network of electric vehicle (EV) chargers and zero-emission fueling infrastructure, as well as zero-emission transit and school buses. There are several considerations that should be addressed when selecting a site for EV charging stations. The following is a checklist to assist with site selection for publicly available EV charging stations.

ADVANCED PROPULSION SYSTEMS↗