Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “capital”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Capitalize on the benefits of OAB - looking beyond the standard setup

Going beyond the initial setup of OAB, how to customize and maintain OAB to fit your current business process. There are many challenges in mapping data from outside sources into OAB and interfacing it to Payroll. Also, life events and fast formulas play a critical role in the customization of OAB.

Oracle validation↗

Managing Capital Investments and Resources for Large, Complex Satellite Development Efforts

Once the schedule was baselined and the primary, secondary, and tertiary critical paths (at least) were established: Identified what entity control which portion of the schedule reserve Dollarized the time associated with the schedule reserve and segregated it off from other budget reserves authorization to spend only came when authorization to utilize the time was given Created a process to manage the control of these resources This process was above and beyond the typical schedule controls used to monitor and maintain the day-to-day schedules Webb telescope will be the premier space observatory for astronomers worldwide,extending the tantalizing discoveries of the Hubble Space telescope• An international collaboration among NASA, the European Space Agency, and theCanadian Space Agency• The largest telescope ever placed in space, Webb will be ~100 times more powerful thanHubble• It is so big it has to fold origami-style to fit in the rocket and will unfold like a transformeronce in space• The 5-layer sunshield protects the telescope from the Sun, Earth, and Moon’s infraredradiation. It’s like having sun protection of SPF 1 million• Unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see thefirst galaxies born after the Big Bang• Hubble orbits ~350 miles above the Earth; Webb will orbit the sun ~1 million miles fromEarth• Launch from French Guiana in 2018

Ryan, Richard M.↗

Development of TID Hardness Assurance Methodologies to Capitalize on Statistical Radiation Environment Models

We develop methods for bounding part-to-part variation in TID data. When used in conjunction with statistical radiation environment models, these methods allow development of RHA that deliver estimated piece part reliability for any desired confidence level, moving beyond risk avoidance methodologies based on radiation design margin. Two methods are developed, and their results compared for realistic data.

Total Ionizing Dose↗

Development of TID Hardness Assurance Methodologies to Capitalize on Statistical Radiation Environment Models

We develop methods for bounding part-to-part variation in TID data. When used in conjunction with statistical radiation environment models, these methods allow development of RHA that deliver estimated piece part reliability for any desired confidence level, moving beyond risk avoidance methodologies based on radiation design margin. Two methods are developed, and their results compared for realistic data.

Total ionizing dose↗

SPS salvage and disposal alternatives

A wide range of salvage options exist for the satellite power system (SPS) satellite, ranging from use in and beyond geosynchronous orbit to use in low Earth orbit to return and use on Earth. The satellite might be used intact to provide for various purposes, it might be cannibalized, or it might be melted down to supply materials for space- or ground-based products. The use of SPS beyond its nominal lifetime provides value that can be deducted from the SPS capital investment cost. It is shown that the present value of the salvage value of the SPS satellites, referenced to the system initial operation data, is likely to be on the order of five to ten percent of its on-orbit capital cost. (Given a 30 year satellite lifetime and a four percent discount rate, the theoretical maximum salvage value is 30.8 percent of the initial capital cost). The SPS demonstration satellite is available some 30 years earlier than the first full-scale SPS satellite and has a likely salvage value on the order of 80 percent of its on site capital cost. In the event that it becomes desirable to dispose of either the demonstration or full-scale SPS satellite, a number of disposal options appear to exist for which intact disposal costs are less than one percent of capital costs.

Source record↗

Satellite power system salvage and disposal alternatives

A wide range of salvage options for the SPS satellite, ranging from use in and beyond geosynchronous orbit to use in low Earth orbit in return and use on Earth are presented. The satellite can be used intact to provide power for various purposes, it can be cannibalized or it can be melted down to supply materials for space or ground based products. The use of SPS beyond its nominal lifetime provides value that can be deducted from the SPS capital investment cost. The present value of the salvage value of the SPS satellites, referenced to the system initial operation data, is on the order of five to ten percent of its on-orbit capital cost. (Given a 30 year satellite lifetime and a four percent discount rate, the theoretical maximum salvage value is 30.8 percent of the capital cost.) The SPS demonstration satellite is available some 30 years earlier than the first full scale SPS satellite and has a salvage value on the order of 80 percent of its on-orbit capital cost. In the event that it becomes desirable to dispose of either the demonstration of full scale SPS satellite, a number of disposal options is presented for which intact disposal costs are less than one percent of capital costs.

Source record↗

Constant-Elasticity-of-Substitution Simulation

Program simulates constant elasticity-of-substitution (CES) production function. CES function used by economic analysts to examine production costs as well as uncertainties in production. User provides such input parameters as price of labor, price of capital, and dispersion levels. CES minimizes expected cost to produce capital-uncertainty pair. By varying capital-value input, one obtains series of capital-uncertainty pairs. Capital-uncertainty pairs then used to generate several cost curves. CES program menu driven and features specific print menu for examining selected output curves. Program written in BASIC for interactive execution and implemented on IBM PC-series computer.

Reiter, G.↗

Assessment of the potential of solar thermal small power systems in small utilities

The potential economic benefit of small solar thermal electric power systems to small municipal and rural electric utilities is assessed. Five different solar thermal small power system configurations were considered in three different solar thermal technologies. The configurations included: (1) 1 MW, 2 MW, and 10 MW parabolic dish concentrators with a 15 kW heat engine mounted at the focal point of each dish, these systems utilized advanced battery energy storage; (2) a 10 MW system with variable slat concentrators and central steam Rankine energy conversion, this system utilized sensible thermal energy storage; and (3) a 50 MW central receiver system consisting of a field of heliostats concentrating energy on a tower-mounted receiver and a central steam Rankine conversion system, this system also utilized sensible thermal storage. The results are summarized in terms of break-even capital costs. The break-even capital cost was defined as the solar thermal plant capital cost which would have to be achieved in order for the solar thermal plants to penetrate 10 percent of the reference small utility generation mix by the year 2000. The calculated break-even capital costs are presented.

Steitz, P.↗

Comparative evaluation of three alternative power cycles for waste heat recovery from the exhaust of adiabatic diesel engines

Three alternative power cycles were compared in application as an exhaust-gas heat-recovery system for use with advanced adiabatic diesel engines. The power cycle alternatives considered were steam Rankine, organic Rankine with RC-1 as the working fluid, and variations of an air Brayton cycle. The comparison was made in terms of fuel economy and economic payback potential for heavy-duty trucks operating in line-haul service. The results indicate that, in terms of engine rated specific fuel consumption, a diesel/alternative-power-cycle engine offers a significant improvement over the turbocompound diesel used as the baseline for comparison. The maximum imporvement resulted from the use of a Rankine cycle heat-recovery system in series with turbocompounding. The air Brayton cycle alternatives studied, which included both simple-cycle and compression-intercooled configurations, were less effective and provided about half the fuel consumption improvement of the Rankine cycle alternatives under the same conditions. Capital and maintenance cost estimates were also developed for each of the heat-recovery power cycle systems. These costs were integrated with the fuel savings to identify the time required for net annual savings to pay back the initial capital investment. The sensitivity of capital payback time to arbitrary increases in fuel price, not accompanied by corresponding hardware cost inflation, was also examined. The results indicate that a fuel price increase is required for the alternative power cycles to pay back capital within an acceptable time period.

Bailey, M. M.↗

Two Decades of Land Cover Change and Forest Fragmentation in Liberia: Consequences for the Contribution of Nature to People

The Guinean forests of West Africa have been identified as a global biodiversity hotspot due to its exceptional concentrations of endemic species and exceptional loss of habitats. The majority of what remains of the Guinean forests lies within Liberia, a country whose share of total wealth is nearly equally distributed into human and natural capital. The Liberian government seeks a more inclusive development agenda that forges a path for improved human capital while sustainably managing its natural capital wealth, which requires consistent data on land cover change and forest disturbance over time. To address this need, Landsat data were used to map and quantify land cover change and forest fragmentation in Liberia between 2000 and 2018. In addition, LiDAR data from the Global Ecosystem Dynamics Investigation (GEDI) mission were applied to assess the integrity of forest remnants. Between 2000 and 2018, only 1% of all forest cover classes (i.e., dense/primary, open/secondary and sparse/degraded) were converted into non-forest classes, with the most observed change being between these three forest classes. During the study period, 27% of the dense/primary forest class transitioned to either the open/secondary or sparse/degraded canopy classes through consistent fragmentation along the edges of the last large remaining blocks of dense/primary forest located in the north-west and south-east of Liberia and more than 14% of dense/primary forest areas identified in previous studies as “essential natural capital” for either biodiversity, forest carbon storage or provision of freshwater ecosystem services were degraded. The 2018 GEDI-based measurements show that the overall average height of dense/primary forest decreases by 24% and 48%, and canopy closure decreases by 33% and 59%, when transitioned to the open/secondary and sparse/degraded classes, respectively. The information derived from this analysis will be critical for informing the development of new policies and actions, leading to more sustainable forest management in Liberia.

Celio De Sousa↗

Cost and size estimates for an electrochemical bulk energy storage concept

Preliminary capital cost and size estimates were made for an electrochemical bulk energy storage concept. The electrochemical system considered was an electrically rechargeable flow cell with a redox couple. On the basis of preliminary capital cost estimates, size estimates, and several other important considerations, the redox-flow-cell system emerges as having great promise as a bulk energy storage system for power load leveling. The size of this system would be less than 2 percent of that of a comparable pumped hydroelectric plant. The capital cost of a 10-megawatt, 60- and 85-megawatt-hour redox system is estimated to be $190 to $330 per kilowatt. The other important features of the redox system contributing to its load leveling application are its low adverse environmental impact, its high efficiency, its apparent absence of electrochemically-related cycle life limitations, and its fast response.

Warshay, M.↗

Analysis of GaAs and Si solar energy hybrid systems

Various silicon hybrid systems are modeled and compared with a gallium arsenide hybrid system. The hybrid systems modeled produce electric power and also thermal power which can be used for heating or air conditioning. Various performance indices are defined and used to compare the system performance: capital cost per electric power out; capital cost per total power out; capital cost per electric power plus mechanical power; annual cost per annual electric energy; and annual cost per annual electric energy plus annual mechanical work. These performance indices indicate that concentrator hybrid systems can be cost effective when compared with present day energy costs.

Heinbockel, J. H.↗

Satellite Power Systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis

The economic and programmatic requirements for a recommended SPS solar photovoltaic baseline concept were analyzed. Costs are determined for the DDT&E; initial capital investment (covers initial procurement and emplacement of each SPS plant and equipment); replacement capital investment (capital asset replacement over the SPS operating life); operations and maintenance (expendables, minor maintenance, repair crews); and taxes/insurance.

Hanley, G.↗

Market assessment of photovoltaic power systems for agricultural applications worldwide

Agricultural sector PV market assessments conducted in the Phillippines, Nigeria, Mexico, Morocco, and Colombia are extrapolated worldwide. The types of applications evaluated are those requiring less than 15 kW of power and operate in a stand alone mode. The major conclusions were as follows: PV will be competitive in applications requiring 2 to 3 kW of power prior to 1983; by 1986 PV system competitiveness will extend to applications requiring 4 to 6 kW of power, due to capital constraints, the private sector market may be restricted to applications requiring less than about 2 kW of power; the ultimate purchase of larger systems will be governments, either through direct purchase or loans from development banks. Though fragmented, a significant agriculture sector market for PV exists; however, the market for PV in telecommunications, signalling, rural services, and TV will be larger. Major market related factors influencing the potential for U.S. PV Sales are: lack of awareness; high first costs; shortage of long term capital; competition from German, French and Japanese companies who have government support; and low fuel prices in capital surplus countries. Strategies that may aid in overcoming some of these problems are: setting up of a trade association aimed at overcoming problems due to lack of awareness, innovative financing schemes such as lease arrangements, and designing products to match current user needs as opposed to attempting to change consumer behavior.

Cabraal, A.↗

Comparative economics of space resource utilization

Physical economic factors such as mass payback ratio, total payback ratio, and capital payback time are discussed and used to compare the economics of using resources from the Moon, Mars and its moons, and near Earth asteroids to serve certain near term markets such as propellant in low Earth orbit or launched mass reduction for lunar and Martian exploration. Methods for accounting for the time cost of money in simple figures of merit such as MPRs are explored and applied to comparisons such as those between lunar, Martian, and asteroidal resources. Methods for trading off capital and operating costs to compare schemes with substantially different capital to operating cost ratio are presented and discussed. Areas where further research or engineering would be extremely useful in reducing economic uncertainty are identified, as are areas where economic merit is highly sensitive to engineering performance - as well as areas where such sensitivity is surprisingly low.

Cutler, Andrew Hall↗

Leasing as a Source of Finance by the Major US Airlines: Hidden Debt and its Changes Over Time

This paper updates prior research on aircraft leasing and contrasts the findings of current data with prior results. Usage of leases by air carriers is a means to lessen the impact of financial obligations from fleet purchases. The study revisits two previous studies, one in 1969 and one in 1991, which is analyzed the incidence of leases by major air carriers. The current study updates these past studies to consider air carriers current usage of leases. Additionally, since operating leases are not reflected in the balance sheets of airlines, operating lease information was capitalized using a present value of future operating lease payments. Then, financial debt burden ratios were computed to determine the impact from the capitalization of lease information. The usage of operating leases increased, significantly from the first study to the 1991 study, and this trend continues. The incidence of leasing, the classification of leases as operating, and the percentage of operating leases to total fleet have all increased for the majority of the airlines reviewed. When operating lease data were capitalized, debt ratios weakened, providing further evidence of deterioration in the financial health of air carriers.

Gritta, Richard D.↗