Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “bcc”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Structure and optical properties of evaporated films of the Cr- and V-group metals

Thin films of Cr, Mo, and W rapidly evaporated in high vacuum (5 x 10 to the -7th torr) onto room-temperature substrates show anomalously low reflectance (compared to bulk samples). From electron and X-ray diffraction and electron microscopy, the normal bcc crystal structure is found, but with very fine grains. Columnar grains about 100 A in diameter were separated by a less dense grain-boundary network about 10-A wide. The measured optical conductivity agrees with an inhomogeneous-medium model that assumes the normal crystalline conductivity for the grain interiors, with model parameters that correlate to the observed columnar grain size. In contrast, V and Nb films rapidly evaporated onto room-temperature substrates have the reflectance of bulk crystalline material. On liquid-nitrogen temperature substrates, however, V and Nb have normal bcc crystal structure but with small flat-plate grains, and the same model, with appropriate parameters, accounts for the optical conductivity. The difference between these two groups apparently depends on residual gases segregated at the grain boundaries in the Cr-group films.

Nestell, J. E., Jr.↗

Microwave dielectric properties of dry rocks

A combination of techniques was used to measure the dielectric properties of 80 rock samples in the microwave region. The real part (RP) of the relative dielectric constant was measured in 0.1-GHz steps from 0.5 to 18 GHz, and the imaginary part (IP) was measured at five frequencies between 1.6 and 16 GHz. The bulk density rho(b) was also measured for all the samples, and the bulk chemical composition (BCC) was determined for 56 of the samples. RP is found to be frequency-independent at 0.5-18 GHz for all samples, and rho(b) accounts for about 50 percent of the observed variance. For silicate rocks, as much as 78 percent of the variance is explained by the combination of rho(b) and the fractional contents of oxides when the silicates are subgrouped by genesis. In contrast, IP decreases with increasing frequency for most rock samples, and no statistically significant relationships are found between IP and rho(b). For subgrouped silicate rocks, 60 percent of the variance in IP can be explained by BCC.

Ulaby, Fawwaz T.↗

The shear modulus of the neutron star crust and nonradial oscillations of neutron stars

Shear moduli are calculated for bcc crystalline and rapidly quenched Coulomb solids produced by the Monte Carlo simulation method. The shear moduli are calculated up to the transition temperature and include the effects of thermal fluctuations. An effective shear modulus appropriate to an approximate 'isotropic' body is introduced. It is found that the values of the 'average shear modulus' for the quenched solids remain about the same as those for the corresponding bcc crystals, although the individual shear moduli of the former, disordered solids deviate considerably from the cubic symmetry of the latter. These results are applied to analyses of neutron star oscillations. It is found that the periods of the two interfacial modes are increased by about 10 percent compared to previous results, and that s-mode periods are increased by about 30 percent. The periods of the f and p modes are hardly affected at all. The surface g-mode periods are not greatly affected, while the t-mode periods are increased by 20-25 percent.

Strohmayer, T.↗

Role of Hf on Phase Formation in Ti45Zr(38-x)Hf(x)Ni17 Liquids and Solids

Hafnium and zirconium are very similar, with almost identical sizes and chemical bonding characteristics. However, they behave differently when alloyed with Ti and Ni. A sharp phase formation boundary near 18-21 at.% Hf is observed in rapidly-quenched and as-cast Ti45Zr38-xHfxNi17 alloys. Rapidly-quenched samples that contain less than 18 at.% Hf form the icosahedral quasicrystal phase, whiles samples containing more than 21 at.% form the 3/2 rational approximant phase. In cast alloys, a C14 structure is observed for alloys with Hf lower than the boundary concentration, while a large-cell (11.93 ) FCC Ti2Ni-type structure is found in alloys with Hf concentrations above the boundary. To better understand the role of Hf on phase formation, the structural evolution with supercooling and the solidification behavior of liquid Ti45Zr38-xHfxNi17 alloys (x=0, 12, 18, 21, 38) were studied using the Beamline Electrostatic Levitation (BESL) technique using 125keV x-rays on the 6ID-D beamline at the Advanced Photon Source, Argonne National Laboratory. For all liquids primary crystallization was to a BCC solid solution phase; interestly, an increase in Hf concentration leads to a decrease in the BCC lattice parameter in spite of the chemical similarity between Zr and Hf. A Reitveld analysis confirmed that as in the cast alloys, the secondary phase that formed was the C14 below the phase formation boundary and a Ti2Ni-type structure at higher Hf concentrations. Both the liquidus temperature and the reduced undercooling change sharply on traversing the phase formation boundary concentration, suggesting a change in the liquid structure. Structural information from a Honeycutt-Anderson index analysis of reverse Monte Carlo fits to the S(q) liquid data will be presented to address this issue.

Wessels, V.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Nanostructure and compositional segregation of soft magnetic FeNi-based nanocomposites with multiple nanocrystalline phases

Soft magnetic metal amorphous nanocomposite alloys are produced through rapid solidification and thermal annealing yielding nanocrystals embedded within an amorphous precursor. Similar free energies in Co-rich and FeNi-based alloy systems result in multiple nanocrystalline phases being formed during devitrification. Studies of multi-phase crystallization processes have been reported for Co-rich alloys but relatively few have investigated FeNi-based systems. A detailed characterization of compositional partitioning and microstructure of an optimally annealed FeNi-based MANC (Fe70Ni30)80Nb4Si2B14 alloy is presented through complementary high-resolution transmission electron microscopy (HRTEM) and atom probe tomography (APT). HRTEM demonstrates orientation relationships between FCC and BCC nanocrystals, suggesting heterogeneous nucleation of nanocrystals in the amorphous matrix or a cooperative mechanism of nucleation between BCC and FCC nanocrystallites. APT results show evidence for (i) the segregation of Fe and Ni between nanocrystals of different phases, (ii) B partitioning to the amorphous phase, and (iii) an Nb-enriched shell surrounding nanocrystals.

soft magnetic materials↗

Scalability in SLA lattice through lattice orientation and hybrid frame and plate architectures

Lightweighting has been a key goal for engineers and designers, with lattice structures widely explored as the building blocks for structural components. Cellular structure-inspired lattice truss frame designs made of struts, have been extensively studied. All plate-based lattice designs have superior mechanical performance. Limits in scalability occur from formation of closed pockets limiting uv curing in processes like stereolithography (SLA). We examine hybrid frame and plate body-centered cubic-simply cubic (BCC-SC) lattices under compression. Unit cells and scaled up lattice exhibit an increase in yield stress and modulus with the addition of plates. The loading direction on the hybrid frame and plate unit cells affected the magnitude of improvement. Simulations and measurements indicated that the optimal lightweight lattice was determined to be when two plates were placed opposite each other with plates buttressing the struts, inhibiting buckling of the struts aligned with the loading direction. This lattice resulted in 63% improvement in specific modulus, a 137% improvement in specific yield point, and a 360% improvement in specific energy absorption (SEA) and the scaled up 4 × 4 × 4 scaled-up structures, showed a 107%, 148%, and 297% in specific modulus, specific yield point, and SEA, respectively A combined stretching-bending behavior was identified in optimal orientations reflecting the delayed buckling mechanism paired to a rising stress-strain curve past the elastic yield indicating bending resistance. The mass moment of inertia was found to be a key parameter correlating optimum orientation for the same number of plates added to the BCC-SC frame.

Mahan Ghosh↗

Vacancy relaxations in b.c.c. crystals.

Vacancy relaxations in bcc crystals using energy dependence on radial displacements from defect of nearest neighbor sets, discussing crystal size and shape

Grimes, H. H.↗