Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Assessment of Baseline Monitoring Data for the Remote-Handled Low-Level Waste Disposal Facility at Idaho National Laboratory

The purpose of this document is to summarize environmental monitoring data collected at the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility during the first four years of facility operations (FY 2019 through FY 2022). This summary provides a “baseline” condition for the facility, which can be used to distinguish contaminant releases from the RHLLW Disposal Facility from pre existing contamination as well as potential future releases from other sources (i.e., upgradient aquifer sources), as specified in the facility monitoring plan. Sufficient data has been collected over the first four years of operation of the RHLLW Disposal Facility to establish baseline conditions for future compliance monitoring of aquifer wells and performance monitoring of vadose zone lysimeters. Except for seven elevated tritium measurements from lysimeter HFEF-South believed to have been impacted by waste disposals, all data was deemed appropriate for establishing baseline concentrations. Monitoring of the aquifer detected indicator analytes gross alpha and gross beta and target analytes tritium and C-14. There were a few C-14 detections prior to an increase in the required detection level (RDL) after the first round of sampling. I-129 and Tc-99 were not detected above RDLs in aquifer samples. Lysimeter samples detected indicator analytes gross alpha and gross beta and target analyte tritium. Target analytes C-14, I-129, and Tc-99 were not detected above RDLs in lysimeter samples. Except for tritium, baseline concentrations of indicator and target analytes measured during the first four years of RHLLW facility operations are expected to represent conditions through the expected 20 year operating period of the facility. Elevated tritium in the aquifer, a result of past discharges of tritium at upgradient facilities, showed a decline over the first four years of operations, and levels are expected to continue to decline with time as a result of dilution and decay. Current tritium levels in lysimeter samples may be elevated due to tritium in the water applied during construction and infiltration testing of the facility. As a result, tritium concentrations in lysimeters may decline with time as a result of dilution and decay. Statistical measures (i.e., mean, standard deviation, and 99% upper confidence level [UCL]) were calculated for all detected analytes using the four years of concentration data. These measures will be used to evaluate future monitoring results and to demonstrate the facility is performing, or not performing, as established in the facility performance assessment (PA). Future monitoring results will also be combined with the baseline data in this report to further establish temporal trends and natural variability in the measurements. Based on the data collected during the baseline period, it is recommended the gross alpha action level for performance monitoring increase from 10 to 20 pCi/L due to several baseline measurements exceeding the preliminary action level of 10. An action level of 20 pCi/L is slightly greater than the 99% UCL, is protective of the aquifer, and would reduce unnecessary sampling. It is also recommended that tritium be added to the lysimeter analyte list for post-baseline period monitoring. Tritium, while not a dose concern, is a good tracer that can provide valuable information on water flow in and around the RHLLW Disposal Facility. Recommendations for a tritium action level are provided if considered necessary.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Short baseline phase delay interferometry

The high precision of the phase delay data type allows angular navigation accuracy on relatively short baselines to compete with the angular accuracy achieved with long baseline group delay measurements. Differential phase delay observations of close quasar pairs on both a 5.9-km baseline (DSS 12-DSS 13) and a 253-km baseline (DSS 13-Owens Valley Radio Observatory) have been performed to study the potential navigational precision and accuracy of the short baseline interferometry. As a first step toward demonstration of a connected element system at Goldstone, the DSS 12-DSS 13 baseline was operated coherently, distributing a common frequency reference via a recently installed fiber optic cable. The observed phase delay residuals of about 10 psec or less on both baselines appear to be dominated by short term troposphere fluctuations, and correspond to navigational accuracies of well below 50 nrad for the 253-km baseline. Additional experiments will be required to probe the full range of systematic errors.

Edwards, C. D.↗

The Spring 1985 high precision baseline test of the JPL GPS-based geodetic system

The Spring 1985 High Precision Baseline Test (HPBT) was conducted. The HPBT was designed to meet a number of objectives. Foremost among these was the demonstration of a level of accuracy of 1 to 2:10 to the 7th power, or better, for baselines ranging in length up to several hundred kilometers. These objectives were all met with a high degree of success, with respect to the demonstration of system accuracy in particular. The results from six baselines ranging in length from 70 to 729 km were examined for repeatability and, in the case of three baselines, were compared to results from colocated VLBI systems. Repeatability was found to be 5:10 to the 8th power (RMS) for the north baseline coordinate, independent of baseline length, while for the east coordinate RMS repeatability was found to be larger than this by factors of 2 to 4. The GPS-based results were found to be in agreement with those from colocated VLBI measurements, when corrected for the physical separations of the VLBI and CPG antennas, at the level of 1 to 2:10 to the 7th power in all coordinates, independent of baseline length. The results for baseline repeatability are consistent with the current GPA error budget, but the GPS-VLBI intercomparisons disagree at a somewhat larger level than expected. It is hypothesized that these differences may result from errors in the local survey measurements used to correct for the separations of the GPS and VLBI antenna reference centers.

Davidson, John M.↗

Evaluation of current tropospheric mapping functions by Deep Space Network very long baseline interferometry

To compare the validity of current algorithms that map zenith tropospheric delay to arbitrary elevation angles, 10 different tropospheric mapping functions are used to analyze the current data base of Deep Space Network Mark 3 intercontinental very long baseline interferometric (VLBI) data. This analysis serves as a stringent test because of the high proportion of low-elevation observations necessitated by the extremely long baselines. Postfit delay and delay-rate residuals are examined, as well as the scatter of baseline lengths about the time-linear model that characterizes tectonic motion. Among the functions that utilize surface meteorological data as input parameters, the Lanyi 1984 mapping shows the best performance both for residuals and baselines, through the 1985 Davis function is statistically nearly identical. The next best performance is shown by the recent function of Niell, which is based on an examination of global atmospheric characteristics as a function of season and uses no weather data at the time of the measurements. The Niell function shows a slight improvement in residuals relative to Lanyi, but also an increase in baseline scatter that is significant for the California-Spain baseline. Two variants of the Chao mapping function, as well as the Chao tables used with the interpolation algorithm employed in the Orbit Determination Program software, show substandard behavior for both VLBI residuals and baseline scatter. The length of the California-Australia baseline (10,600 km) in the VLBI solution can vary by as much as 5 to 10 cm for the 10 mapping functions.

Sovers, O. J.↗

Evaluation of the KOKEE12M/ONSA13NE Baseline as a KOKEE12M/WETTZ13S Backup

USNO's IERS Rapid Service/Prediction Center (RS/PC) uses the KOKEE12M/WETTZ13S (K2/Ws) baseline for its combination solutions. It would be useful for the RS/PC to be able to use backup baselines in case K2 or Ws is not available. While Ws was undergoing repair in late 2022 through early 2023, ONSA13NE (Oe) replaced Ws to provide immediate UT1 for IVS Analysis Center products but also to begin building a data set for the RS/PC to eventually use to ``characterize'' (assess and approve) the K2/Oe baseline for use in its solutions. The RS/PC needs 60 sessions to be able to characterize a baseline, and the data from the repair period provided 58 sessions, with three additional sessions being observed later. Here we evaluate the K2/Oe baseline to see if it is a viable candidate for submission to the RS/PC for characterization. We evaluate the K2/Oe baseline itself and also compare the K2/Oe baseline to the K2/Ws baseline.

VLBI↗

Detection of atmospheric pressure loading using very long baseline interferometry measurements

Loading of the Earth by the temporal redistribution of global atmospheric mass is likely to displace the positions of geodetic monuments by tens of millimeters both vertically and horizontally. Estimates of these displacements are determined by convolving National Meteorological Center (NMC) global values of atmospheric surface pressure with Farrell's elastic Green's functions. An analysis of the distances between radio telescopes determined by very long baseline interferometry (VLBI) between 1984 and 1992 reveals that in many of the cases studied there is a significant contribution to baseline length change due to atmospheric pressure loading. Our analysis covers intersite distances of between 1000 and 10,000 km and is restricted to those baselines measured more than 100 times. Accounting for the load effects (after first removing a best fit slope) reduces the weighted root-mean-square (WRMS) scatter of the baseline length residuals on 11 of the 22 baselines investigated. The slight degradation observed in the WRMS scatter on the remaining baselines is largely consistent with the expected statistical fluctuations when a small correction is applied to a data set having a much larger random noise. The results from all baselines are consistent with approximately 60% of the computed pressure contribution being present in the VLBI length determinations. Site dependent coefficients determined by fitting local pressure to the theoretical radial displacement are found to reproduce the deformation caused by the regional pressure to within 25% for most inland sites. The coefficients are less reliable at near coastal and island stations.

Vandam, T. M.↗

Baseline Calibration of the GeoSAR Interferometric Mapping Instrument

GeoSAR is a dual frequency, X-Band and P-Band, interferometric mapping radar flown on a Gulfstream II with a nominal flying altitude of 10000 and a swath width of 10 km on both left and right sides of the aircraft. The radar is designed to generate high resolution and high accuracy digital elevation maps both above and below the vegetation canopy. In order to generate the high accuracy digital elevations models it is necessary to have extremely precise knowledge of the interferometric baseline, approximately .1 mm for the X-band system and 3 mm for the P-band system. Baseline knowledge to this level of accuracy is achieved through a combination of active baseline measurement using a Laser Baseline Metrology System (LBMS) and baseline calibration using an accurately surveyed array of corner reflectors. In this paper, we describe the LBMS system used to measure the dynamic component of the interferometric baseline and the least squares procedure used to estimate all three components of the interferometric baseline based on differences between calculated and surveyed corner reflector locations.

Hensley, Scott↗

Testing Explanations of Short Baseline Neutrino Anomalies

The experimental observation of neutrino oscillations profoundly impacted the physics of neutrinos, from being well understood theoretically to requiring new physics beyond the standard model of particle physics. Indeed, the mystery of neutrino masses implies the presence of new particles never observed before, often called sterile neutrinos, as they would not undergo standard weak interactions. And while neutrino oscillation measurements entered the precision era, reaching percent-level precision, many experimental results show significant discrepancies with the standard model, at baselines much shorter than typical oscillation baselines, like LSND, MiniBooNE, gallium experiments, and reactor antineutrino measurements. These short baseline anomalies could be explained by the addition of a light sterile neutrino, with mass in the $1-10~\text{eV}$ range, however, in strong tension with many null experimental observations. Other explanations that rely on sterile neutrinos with masses in the $1-500~\text{MeV}$ could resolve the tension. Here we test both classes of models. On the one hand, we look for datasets collected at a short baseline which can constrain heavy sterile neutrino models. We find that the minimal model is fully constrained, but several extensions of this model could weaken the current constraint and be tested with current and future datasets. On the other hand, we test the presence of neutrino oscillations at short baselines, induced by a light sterile state, with the data collected by the MicroBooNE experiment, a liquid argon time projection chamber specifically designed to resolve the details of each neutrino interaction. We report null results from both analyses, further constraining the space of possible explanations for the short baseline anomalies. If new physics lies behind the short baseline anomaly puzzle, it is definitely not described by a simple model.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Using Visual Systems Mapping to Improve Transparency and Comparability of Life Cycle Assessment Baseline Scenarios

Visual systems mapping is a systems engineering approach used to represent complex processes and interactions. This study evaluates its application for documenting assumptions in life cycle assessment (LCA) baseline scenarios. In LCA, the baseline or reference case represents the business as usual system against which changes in impacts (e.g., emissions) are assessed. These baseline assumptions are particularly influential in biomass LCAs, yet they often vary across studies due to regional context, system boundaries, and simplifying assumptions that are not consistently or transparently documented. As a result, key feedbacks, omitted processes, and boundary choices may remain unclear, limiting comparability across studies and weakening their usefulness for decision-making. This study examines whether visual systems mapping can improve the transparency and comparability of biomass LCA baseline scenarios. A case study of five published biomass-related LCAs were reviewed, and their baseline scenarios were translated into visual system maps to identify included processes, omitted components, and underlying assumptions. The analysis demonstrates that visual systems mapping can make baseline assumptions more explicit, highlight excluded dynamics, and improve documentation of system boundaries. Based on these findings, the study recommends the use of visual systems mapping alongside open data repositories and reproducible workflows to support greater transparency, reproducibility, and comparability in LCAs. These improvements can strengthen the role of LCAs in informing decisions related to sustainable biomass systems.

Davis, Maggie [ORNL] (ORCID:0000000181319328)↗

Coriolis force compensation and laser beam delivery for 100-m baseline atom interferometry

The Coriolis force is a significant source of systematic phase errors and dephasing in atom interferometry and is often compensated by counter-rotating the interferometry laser beam against Earth's rotation. We present a novel method for performing Coriolis force compensation for long-baseline atom interferometry, which mitigates atom-beam misalignment due to beam rotation, an effect which is magnified by the long lever arm of the baseline length. The method involves adjustment of the angle of the interferometer beam prior to a magnifying telescope, enabling the beam to pivot around a tunable position along the interferometer baseline. By tuning the initial atom kinematics and adjusting the angle with which the interferometer beam pivots about this point, we can ensure that the atoms align with the center of the beam during the atom optics laser pulses. This approach will be used in the MAGIS-100 atom interferometer and could also be applied to other long-baseline atom interferometers. An additional challenge associated with long baseline interferometry is that since long-baseline atom interferometers are often located outside of typical laboratory environments, facilities constraints may require lasers to be housed in a climate-controlled room a significant distance away from the main experiment. Nonlinear effects in optical fibers restrict the use of fiber-based transport of the high-power interferometry beam from the laser room to the experiment. We present the design of and prototype data from a laser transport system for MAGIS-100 that maintains robustness against alignment drifts despite the absence of a long fiber.

Glick, Jonah↗

Baseline [ 18 F]GTP1 tau PET imaging is associated with subsequent cognitive decline in Alzheimer’s disease

Background: The role and implementation of tau PET imaging for predicting subsequent cognitive decline in Alzheimer’s disease (AD) remains uncertain. This study was designed to evaluate the relationship between baseline [ 18 F]GTP1 tau PET and subsequent longitudinal change across multiple cognitive measures over 18 months. Methods: Our analyses incorporated data from 67 participants, including cognitively normal controls (n = 10) and β-amyloid (Aβ)-positive individuals ([ 18 F] florbetapir Aβ PET) with prodromal (n = 26), mild (n = 16), or moderate (n = 15) AD. Baseline measurements included cortical volume (MRI), tau burden ([ 18 F]GTP1 tau PET), and cognitive assessments [Mini-Mental State Examination (MMSE), Clinical Dementia Rating (CDR), 13-item version of the Alzheimer’s Disease Assessment Scale-Cognitive Subscale (ADAS-Cog13), and Repeatable Battery for the Assessment of Neuropsychological Status (RBANS)]. Cognitive assessments were repeated at 6-month intervals over an 18-month period. Associations between baseline [ 18 F]GTP1 tau PET indices and longitudinal cognitive performance were assessed via univariate (Spearman correlations) and multivariate (linear mixed effects models) approaches. The utility of potential prognostic tau PET cut points was assessed with ROC curves. Results: Univariate analyses indicated that greater baseline [ 18 F]GTP1 tau PET signal was associated with faster rates of subsequent decline on the MMSE, CDR, and ADAS-Cog13 across regions of interest (ROIs). In multivariate analyses adjusted for baseline age, cognitive performance, cortical volume, and Aβ PET SUVR, the prognostic performance of [ 18 F]GTP1 SUVR was most robust in the whole cortical gray ROI. When AD participants were dichotomized into low versus high tau subgroups based on baseline [ 18 F]GTP1 PET standardized uptake value ratios (SUVR) in the temporal (cutoff = 1.325) or whole cortical gray (cutoff = 1.245) ROIs, high tau subgroups demonstrated significantly more decline on the MMSE, CDR, and ADAS-Cog13. Conclusions: Our results suggest that [ 18 F]GTP1 tau PET represents a prognostic biomarker in AD and are consistent with data from other tau PET tracers. Tau PET imaging may have utility for identifying AD patients at risk for more rapid cognitive decline and for stratification and/or enrichment of participant selection in AD clinical trials.

60 APPLIED LIFE SCIENCES↗

An approach to software baseline generation

A current Data & Analysis Center for Software (DACS) effort to develop software baselines is summarized. This baseline effort is an on-going activity; that is, the baselines are meant to be updated as new software data becomes available. The information presented and processed was organized to make periodic updating a much simpler task. A baseline, for this effort, consists of an estimation of any characteristic of a software project that is helpful to a developer, manager, or monitor to manage, control, or influence a software product. The objective of these baselines is to provide a tool for aiding software developers in their daily work. Baselines were synthesized from an empirical dataset provided by the Software Engineering Laboratory at NASA Goddard Space Flight Center (NASA/SEL). These data were selected because the data collection effort developed at the NASA/SEL is the most thorough and complete available.

Romeu, J. L.↗

Angular navigation capabilities of short baseline phase delay interferometry

Short baseline phase delay interferometry can provide angular navigation capabilities which are competitive with current accuracies for group delay Very Long Baseline Interferometry (VLBI) on intercontinental baselines. In addition, a number of operational considerations make short baseline interferometry attractive, including enhanced mutual visibility, ability to observe at higher elevation angles, and the possibility of processing data in realtime. To make use of the higher precision phase delay datatype, however, the cycle ambiguity associated with the observed interferometric phase must be resolved. Results are presented for two experiments, on baselines of 5.9 and 253 km, for which RF phase connection appears to have been reliably achieved for several groups of angularly close radio sources. The dependence of the resulting phase delay residuals on elevation suggests that temporal fluctuations in the line-of-sight troposphere delay are a dominant error source. The observed RMS phase delay residuals of 10 psec or less suggest that baselines of order 100 km could provide high-efficiency angular navigation with accuracies well below 50 nrad. Plans for further work at the Goldstone Deep Space Communication Complex are reviewed.

Edwards, C. D.↗

Carrier phase ambiguity resolution for the Global Positioning System applied to geodetic baselines up to 2000 km

A technique for resolving the ambiguities in the GPS carrier phase data (which are biased by an integer number of cycles) is described which can be applied to geodetic baselines up to 2000 km in length and can be used with dual-frequency P code receivers. The results of such application demonstrated that a factor of 3 improvement in baseline accuracy could be obtained, giving centimeter-level agreement with coordinates inferred by very-long-baseline interferometry in the western United States. It was found that a method using pseudorange data is more reliable than one using ionospheric constraints for baselines longer than 200 km. It is recommended that future GPS networks have a wide spectrum of baseline lengths (ranging from baselines shorter than 100 km to those longer than 1000 km) and that GPS receivers be used which can acquire dual-frequency P code data.

Blewitt, Geoffrey↗

Information content of a single pass of phase-delay data from a short baseline connected element interferometer

An analytic development of the information array obtained with a single tracking pass of phase-delay measurements made from a short baseline interferometer is presented. Phase-delay observations can be made with great precision from two antennas using a single, common distributed frequency standard, hence the name connected element. With the information array, closed-form expressions are developed for the error covariance in declination and right ascension. These equations serve as useful tools for analyzing the relative merits of candidate station locations for connected element interferometry (CEI). The navigation performance of a short baseline interferometer located at the Deep Space Network's (DSN's) Goldstone intracomplex is compared with that which is presently achievable using Very Long Baseline Interferometry (VLBI) over intercontinental baselines. The performance of an intracomplex pair of short baselines formed by three stations is also investigated, along with the use of a single baseline in conjunction with conventional two-way Doppler data. The phase-delay measurement accuracy and data rate used in the analysis are based on the expected performance of an experimental connected element system presently under construction at Goldstone. The results indicate that the VLBI system that will be used during the Galileo mission can determine the declination and right ascension of a distant spacecraft to an accuracy of 20 to 25 nrad, while the CEI triad system and the combination of CEI-Doppler system are both capable of 30 to 70 nrad performance.

Thurman, S. W.↗

An evaluation of water vapor radiometer data for calibration of the wet path delay in very long baseline interferometry experiments

The internal consistency of the baseline-length measurements derived from analysis of several independent VLBI experiments is an estimate of the measurement precision. The paper investigates whether the inclusion of water vapor radiometer (WVR) data as an absolute calibration of the propagation delay due to water vapor improves the precision of VLBI baseline-length measurements. The paper analyzes 28 International Radio Interferometric Surveying runs between June 1988 and January 1989; WVR measurements were made during each session. The addition of WVR data decreased the scatter of the length measurements of the baselines by 5-10 percent. The observed reduction in the scatter of the baseline lengths is less than what is expected from the behavior of the formal errors, which suggest that the baseline-length measurement precision should improve 10-20 percent if WVR data are included in the analysis. The discrepancy between the formal errors and the baseline-length results can be explained as the consequence of systematic errors in the dry-mapping function parameters, instrumental biases in the WVR and the barometer, or both.

Kuehn, C. E.↗

Baseline Medical System Translation for the Impact Medical Database

NASA has developed a new evidence-based data-driven probabilistic risk assessment and tradespace analysis tool as a successor to the Integrated Medical Model (IMM). This updated decision support tool is known as IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces). Whereas IMM focuses on the resources and risks associated with International Space Station (ISS) and Low Earth Orbit (LEO) missions, IMPACT estimates the frequency and consequences of medical conditions that might arise during exploration missions. One of the services offered by IMM is a series of generic or baseline medical systems associated with typical mission types or DRMs (Design Reference Missions), such that requestors may prioritize questions pertaining to the mission itself over the medical supplies indicated by the model outputs for that DRM. In a mission focused request, the appropriate baseline medical system is used in place of a prepared or optimized medical kit. In preparation, an effort was undertaken to create baseline systems of medical resources within IMPACT suitable for typical DRMs. Using an existing baseline medical system within IMM’s Integrated Medical Evidence Database (iMED) as a starting point, the resources found within the medical kit were compared to and substituted for equivalent resources available within the IMPACT MD (Medical Database). In consultation with clinicians with knowledge of IMPACT’s MD, each resource was matched as closely as possible to a similarly purposed resource in IMPACT, seeking to preserve the treatment capabilities and procedures offered by the IMM medical system while reconciling the differences in modeled resources and medical conditions between the models. To demonstrate the efficacy of this work, a prototype ISS medical system in IMPACT was translated from the baseline used in the IMM. The appropriate medical system was then run through its associated medical model to compare and validate the resultant risks and risk mitigation provided by each baseline ISS medical kit.

S Schwartz↗

Baseline Graphite Characterization

Presentation will include baseline graphite characterization information, such as purpose and results, baseline property measurements, baseline graphite characterization method, baseline progress, split disc tensile strength: ASTM Tensile Strength Alternative, Identification of proper split disk fracture, baseline graphite ASTM D8289, horizontal orientation, digital image correlation, and DIC Analyzation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗