Engineering PapersSearch

SEARCH · Engineering Papers

Results for “availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Estimating the Contributions to Human Error Probability from the Convolution of the Distribution of Time Available and Time Required

As part of their duties, Human Reliability Analysis must often evaluate if crews in nuclear power plants (NPPs) can complete tasks associated with a human-failure event within time limits. For example, the time required in NPP scenarios is determined by systematic and structured walkthroughs, feasibility studies, recorded times from training exercises, and interviews with experienced operators and experts. Typically, a point estimate is derived for the estimate (mean, maximum, or 95th percentile of time required). Using point-estimate values can mask the risk associated with variability among crews, plant conditions and set-up, environmental conditions, and other impact factors under which these actions are executed. While point estimates for time required and time available have served the industry well, without considering the uncertainty they could lead to biased understanding about the risk. The Integrated Human Event Analysis System - General Methodology (IDHEAS-G) model (developed by the US Nuclear Regulatory Commission, NRC) for human error probability calculates human error probability by summing two probabilities: insufficient time and cognitive error. As such, the model takes a more holistic approach by considering the full distributions for time required and time available to calculate the human error probability because the time available to complete the task is insufficient. In this study, we expand on the work of the NRC and discuss methods for estimating these time considerations. For example, for the time required, the impact of Performance Influencing Factors (PIFs) on the distribution was divided into impacts that are aleatory in nature, such as crew-to-crew variability, and those that are epistemic (i.e., the PIFs). Starting with the factors that introduce aleatory uncertainty, a first-order distribution was developed from a large set of time required (i.e., NPP task completion times) data for the range of operator actions that occur in the NPP control room under simulated accident conditions. The first-order distribution can then be adjusted to account for epistemic uncertainty using research associated with the impact of applicable PIFs on the time required. We also develop guidance for analysts to address the probability distributions for the time available. The guidance we developed on how to estimate time required and time available distributions is based on the identification of pertinent research and data, data analyses, and expert knowledge elicitation.

human error probability, human performance, time e

Conus-Wide Mapping of Water Availability and Cost

Background: New demands for water can be satisfied through a variety of source options. In some basins surface and/or groundwater may be available through permitting with the state water management agency (termed unappropriated water), alternatively water might be purchased and transferred out of its current use to another (termed appropriated water), or non-traditional water sources can be captured and treated (e.g., wastewater). The relative availability and cost of each source are key factors in the development decision. Unfortunately, these measures are location dependent with no consistent or comparable set of data available for evaluating competing water sources. With the help of water managers, water availability was mapped for over 2500 watersheds throughout CONUS. These values are unique in that they account for institutional factors (i.e., water rights, compacts, treaties, instream flows) that locally limit water use. Five water sources were individually examined, including unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Associated costs to acquire, convey and treat the water, as necessary, for each of the five sources were estimated. These metrics were developed to support regional water planning and policy analysis with initial application to electric transmission planning in the western US. Problem: These data were originally developed in 20141 and updated in 20182. New datasets on which these data depend have been published. As such, there is need to update the water availability and cost data. There is also need to map this same data to a county resolution and to publish the data in a more accessible place. Organization of the dataset: Data are organized according to five primary water sources: • Unappropriated fresh surface water • Unappropriated fresh groundwater • Appropriated water • Recycled wastewater, and • Brackish water

Tidwell, Vincent [Pacific Northwest National Labor

NASCOM network ground communications availability report

A performance analysis of NASCOM Network circuits is presented. An objective of 99.80 percent availability has been established for all network circuits and an acceptable level of 99.50. A network narrative summary for the current month includes changes in network configurations, current month's totals for modes of service and trouble category losses, a discussion of trends, and significant losses that affected the performance indexes of individual or groups of circuits. A table and narrative summary of those circuits that failed to meet the objective of 99.80% availability for all network circuits and an acceptable level of 99.50. Lost time and interruption tables showing all circuits affected by outages, by trouble category, with their total time and events, scheduled operating hours, and individual availability indexes also are included. Selected circuits whose availabilities have or continue to affect the overall network availability are also analyzed.

Source record

Estimation of surface moisture availability from remote temperature measurements

Analysis of moisture availability, determined from GOES IR surface temperature measurements and a boundary layer model, and antecedent precipitation are presented for data taken over Texas and Argentina. Correlations between antecedent precipitation and moisture availability are high where the spatial variation in moisture availability is much larger than an inherent uncertainty in the method, which is judged to be about + or - 0.2 for the moisture availability parameter. In regions where there are large gradients of precipitation, the IR method can provide useful information on variations in soil moisture availability and, by implication, in precipitation.

Flores, Alberto L.

ETARA PC version 3.3 user's guide: Reliability, availability, maintainability simulation model

A user's manual describing an interactive, menu-driven, personal computer based Monte Carlo reliability, availability, and maintainability simulation program called event time availability reliability (ETARA) is discussed. Given a reliability block diagram representation of a system, ETARA simulates the behavior of the system over a specified period of time using Monte Carlo methods to generate block failure and repair intervals as a function of exponential and/or Weibull distributions. Availability parameters such as equivalent availability, state availability (percentage of time as a particular output state capability), continuous state duration and number of state occurrences can be calculated. Initial spares allotment and spares replenishment on a resupply cycle can be simulated. The number of block failures are tabulated both individually and by block type, as well as total downtime, repair time, and time waiting for spares. Also, maintenance man-hours per year and system reliability, with or without repair, at or above a particular output capability can be calculated over a cumulative period of time or at specific points in time.

Hoffman, David J.

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, within a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability, and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation, testing results, and other information. Where appropriate, actual performance history was used to calculate failure rates for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to assess compliance with requirements and to highlight design or performance shortcomings for further decision making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability, and maintainability analysis, and present findings and observation based on analysis leading to the Ground Operations Project Preliminary Design Review milestone.

Gernand, Jeffrey L.

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, in a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation; testing results, and other information. Where appropriate, actual performance history was used for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to verify compliance with requirements and to highlight design or performance shortcomings for further decision-making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability and maintainability analysis, and present findings and observation based on analysis leading to the Ground Systems Preliminary Design Review milestone.

Gernand, Jeffrey L.

Understanding Changes in Water Availability in the Rio Grande/Rio Bravo del Norte Basin Under the Influence of Large-Scale Circulation Indices Using the Noah Land Surface Model

Water availability plays an important role in the socio-economic development of a region. It is however, subject to the influence of large-scale circulation indices, resulting in periodic excesses and deficits. An assessment of the degree of correlation between climate indices and water availability, and the quantification of changes with respect to major climate events is important for long-term water resources planning and management, especially in transboundary basins as it can help in conflict avoidance. In this study we first establish the correlation of the Pacific Decadal Oscillation (PDO) and El Nino-Southern Oscillation (ENSO) with gauged precipitation in the Rio Grande basin, and quantify the changes in water availability using runoff generated from the Noah land surface model. Both spatial and temporal variations are noted, with winter and spring being most influenced by conditions in the Pacific Ocean. Negative correlation is observed at the headwaters and positive correlation across the rest of the basin. The influence of individual ENSO events, classified using four different criteria, is also examined. El Ninos (La Ninas) generally cause an increase (decrease) in runoff, but the pattern is not consistent; percentage change in water availability varies across events. Further, positive PDO enhances the effect of El Nino and dampens that of La Nina, but during neutral/transitioning PDO, La Nina dominates meteorological conditions. Long El Ninos have more influence on water availability than short duration high intensity events. We also note that the percentage increase during El Ninos significantly offsets the drought-causing effect of La Ninas.

Khedun, C. Prakash

Space Transportation System Availability Requirement and Its Influencing Attributes Relationships

It is important that engineering and management accept the need for an availability requirement that is derived with its influencing attributes. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability. Also important to provide bounds of the variables providing engineering the insight required to control the system's engineering solution, e.g., these influencing attributes become design requirements also. These variables will drive the need to provide integration of similar discipline functions or technology selection to allow control of the total parts count. The relationship of selecting a reliability requirement will place a constraint on parts count to achieve a given availability requirement or if allowed to increase the parts count will drive the system reliability requirement higher. They also provide the understanding for the relationship of mean repair time (or mean down time) to maintainability, e.g., accessibility for repair, and both the mean time between failure, e.g., reliability of hardware and availability. The concerns and importance of achieving a strong availability requirement is driven by the need for affordability, the choice of using the two launch solution for the single space application, or the need to control the spare parts count needed to support the long stay in either orbit or on the surface of the moon. Understanding the requirements before starting the architectural design concept will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russell E.

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is important that engineering and management accept the need for an availability requirement that is derived with its influencing attributes. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability. Also important to provide bounds of the variables providing engineering the insight required to control the system's engineering solution, e.g., these influencing attributes become design requirements also. These variables will drive the need to provide integration of similar discipline functions or technology selection to allow control of the total parts count. The relationship of selecting a reliability requirement will place a constraint on parts count to achieve a given availability requirement or if allowed to increase the parts count will drive the system reliability requirement higher. They also provide the understanding for the relationship of mean repair time (or mean down time) to maintainability, e.g., accessibility for repair, and both the mean time between failure, e.g., reliability of hardware and availability. The concerns and importance of achieving a strong availability requirement is driven by the need for affordability, the choice of using the two launch solution for the single space application, or the need to control the spare parts count needed to support the long stay in either orbit or on the surface of the moon. Understanding the requirements before starting the architectural design concept will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russell E.

GPM Data Products, Their Availability, and Production Status

On February 28, 2014, Japan Standard Time, the Global Precipitation Measurement (GPM) mission was launched in a picture-perfect launch activity. On March 4, 2014, the GPM Microwave Imager (GMI) was put into science observation mode. The Dual-Frequency Radar (DPR) was put in science observation mode on March 8, 2014. The Precipitation Processing System (PPS) produced products immediately upon receiving the data. Both regular science products and Near-realtime (NRT) products were produced. These were made immediately available to a group of early adopters. In mid-June 2014, GMI level-1 brightness temperature products were made publicly available. In mid-July 2014, GMI and partner-radiometer precipitation retrievals were made public. GMI public availability was several months ahead of the planned release. The DPR products became publicly available on the planned release date of September 2, 2014. Data continues to be available to any user desiring it.

Data Products

Space Transportation System Availability Requirement and Its Influencing Attributes Relationships

It is important that engineering and management accept the need for an availability requirement that is derived with its influencing attributes. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability. Also important to provide bounds of the variables providing engineering the insight required to control the system's engineering solution, e.g., these influencing attributes become design requirements also. These variables will drive the need to provide integration of similar discipline functions or technology selection to allow control of the total parts count. The relationship of selecting a reliability requirement will place a constraint on parts count to achieve a given availability requirement or if allowed to increase the parts count will drive the system reliability requirement higher. They also provide the understanding for the relationship of mean repair time (or mean down time) to maintainability, e.g., accessibility for repair, and both the mean time between failure, e.g., reliability of hardware and availability. The concerns and importance of achieving a strong availability requirement is driven by the need for affordability, the choice of using the two launch solution for the single space application, or the need to control the spare parts count needed to support the long stay in either orbit or on the surface of the moon. Understanding the requirements before starting the architectural design concept will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

reliability

Water availability modulates maximum canopy heights of low-elevation Amazonian second-growth forests

Tropical second-growth forests of the Amazon sequester large amounts of carbon and are important carbon sinks, contributing substantially to climate change mitigation, biodiversity conservation, and providing crucial ecosystem services. Deforestation due to selective logging and shifting cultivation is expanding second-growth forest areas in tropical forest regions, which if well managed, regenerate rapidly over time. Maximum forest canopy height is an important metric of biomass and carbon accumulation in second-growth forests and is strongly influenced by water availability. The water limitation hypothesis explains the positive influence of water availability on maximum tree heights and has been examined and demonstrated at a small-scale using field data, and at a global scale, with limited accuracy, using remote sensing data in tropical ecosystems. However, this hypothesis concerning maximum canopy height has not been much studied at regional and national scales for tropical second-growth forests. In this study, we leveraged NASA GEDI spaceborne lidar data across the Brazilian Amazon and derived second-growth forest relative height metrics for delineating the influence of water availability, second-growth forest age, and topographic elevation on maximum canopy height. Water availability was found to significantly influence the maximum canopy height of second-growth forest trees, of age range from 30 to 35 years, at elevations less than 500 m and maximum precipitation thresholds of 1500 mm. Our results indicate that changing precipitation patterns or increased drought conditions under different climate change regimes could impact forest structure, plant communities, ecosystem functioning, and carbon sequestration capabilities of tropical second-growth forests in the Amazon.

Carbon sequestration

Potential Availability of Alternative Fuel to Supply Maritime Activities in Pacific Northwest Ports

The international shipping sector represented 3% of global greenhouse gas emissions in 2023 (Office of Energy Efficiency & Renewable Energy 2024). International shipping has been classified as a difficult-to-decarbonize industry (IRENA 2024). In an effort to drive decarbonization, the U.S. Department of Energy has partnered with Mission Innovation to co-lead the Zero-Emission Shipping Mission, which launched in 2021(Office of Energy Efficiency & Renewable Energy 2021). In addition, the U.S. Department of State partnered with Norway to launch the Green Shipping Challenge in 2022 (Office of the Spokesperson 2022b). As part of the ZESM and Green Shipping Challenge, the United States is collaborating with the Republic of Korea (ROK) to develop a green shipping corridor (U.S. Mission Korea 2023). The United States and ROK have conducted a pre-feasibility study as the first step in developing a green shipping corridor between the countries. The ports included in the study are Seattle, Tacoma, and Everette in the U.S. Pacific Northwest (PNW) and Busan, Ulsan, and Masan in ROK. The National Renewable Energy Laboratory's role in the study was to analyze the availability and technical potential of alternative marine fuels in proximity to U.S. PNW ports. The findings show most of the existing alternative fuel capacity within the region is from renewable diesel, biodiesel, and sustainable aviation fuel facilities. The largest growth in fuel capacity in the region by 2030 is projected to be in renewable diesel and hydrogen. The overall technical readiness of non-drop-in alternative fuel production and conversion technologies is more developed than alternative-fueled ships and associated fueling infrastructure. However, much of the fuel capacity in the region is comprised of drop-in fuels, making it technically possible to use existing infrastructure for transporting and bunkering to the existing fleet. Data to inform regional alternative fuel quantity estimations were collected from an extensive review of databases, reports, announcements, and other publicly available resources. A maturity index and sector competition factor were applied to announced fuel projects to determine the quantity of alternative fuel available to the marine sector in the region by 2030. Demand data were collected from fuel bunkering logs covering the PNW seaports (State of Washington 2021). Both supply and demand data were converted to very-low sulfur fuel oil gallon equivalents (VLSFO-GE) for better comparison. Qualitative data were gathered through interviews with stakeholders, project developers, and industry experts. Total alternative fuel capacity available to the marine sector in the region is estimated to be 824 million VLSFO-GE per year by 2030. This is sufficient to cover the requirements of a green shipping corridor between the United States and ROK. The findings from this report are being used to inform detailed feasibility studies for several U.S. PNW -ROK green shipping corridors. Updates from the U.S. PNW - ROK feasibility studies will continue to be published on Mission Innovation's green corridor tracking website (Zero Emission Shipping Mission, n.d.). In addition, this report has helped to inform further work on shipping decarbonization in the U.S. PNW, including the Pacific Northwest to Alaska Green Corridor focused on cruise vessels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Status and availability of FCC hardware

The source availability of FCC and/or FCC connectors was surveyed. The results for the following areas are presented: (1) cost of FCC versus standard round cable, (2) qualification status, (3) size of wire available in FCC, (4) availability of hermetic connectors for FCC, (5) conversion from flat cable to round cable and visa versa, (6) availability of shielded flat cable for RF usage, (7) termination techniques, and (8) repair techniques.

Romriell, G. K.

Availability of the DSN Telemetry Data System and Its Major Elements, Including the TWM Assemblies

The DSN discrepancy report system which records all outages of DSN data systems that occur during mission support operations is described. The recorded outages of the telemetry data system for 1981 through 1983 were tabulated and availability characteristics of the telemetry data system and several of its major elements, including the traveling wave maser (TWM) Assemblies were developed. Availability characteristics of the TWM assemblies are compared with those of other DSN subsystems and assemblies. It is found that for a three year period, the availability of the telemetry data system is 99.0%, and its mean time to restore service is 0.9 hours; the availability of the TWM assemblies is 99.83%, and their mean time to restore service is 2.5 hours.

Stevens, R.

A terrain-dependent reference atmosphere determination method for available potential energy calculations

An iterative technique that determines the reference atmosphere which incorporates the effects of uneven surface topography is presented. This method has been successfully applied in several available potential energy studies. An alternative method due to Taylor is also evaluated. While Taylor presented excellent continuous formulations of the available potential energy that include topography, his method for determining the reference atmosphere distributions failed to provide the accuracy needed to produce reliable available potential energy estimates. Since topography has a significant influence on the general circulation, it is important to employ techniques that incorporate its effects in the determination of available potential energy.

Koehler, T. L.

Stochastic availability analysis of operational data systems in the Deep Space Network

Existing availability models of standby redundant systems consider only an operator's performance and its interaction with the hardware performance. In the case of operational data systems in the Deep Space Network (DSN), in addition to an operator system interface, a controller reconfigures the system and links a standby unit into the network data path upon failure of the operating unit. A stochastic (Markovian) process technique is used to model and analyze the availability performance and occurrence of degradation due to partial failures are quantitatively incorporated into the model. Exact expressions of the steady state availability and proportion degraded performance measures are derived for the systems under study. The interaction among the hardware, operator, and controller performance parameters and that interaction's effect on data availability are evaluated and illustrated for an operational data processing system.

Issa, T. N.