Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “assets”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Use of Hardware-in-the-Loop to De-Risk Field Deployment of Hydrogen Assets

Grid-forming assets are required in microgrids to act as voltage-frequency masters. These grid-forming assets can operate in two modes of operation: grid-following mode and grid-forming mode. In grid-following mode of operation, these assets will follow real power and reactive power setpoints and in grid-forming mode of operation these assets will follow voltage and frequency setpoints. Traditionally, diesel generators or natural gas-based generators are widely used to act as a voltage-frequency master. However, many utilities are aiming to replace generators with grid forming-inverters supplied by solar photovoltaics (PV), batteries or fuel cells. Since grid-forming assets need a long-term reliable energy source, fuel cells are a reasonable and viable choice to supply the grid-forming inverters, but some of the challenges facing the wide deployment of grid-forming fuel cell inverters need to be addressed. Specifically, in our proposed work, we aim to focus on the interconnection and interoperability requirements of grid-forming fuel cell inverters. Currently, state-of-the-art fuel cell inverters follow the general interconnection requirements of distributed energy resources (DERs) and general interoperability requirements of DERs, but these requirements were built with PV and battery systems in mind. Fuel cells have different operational requirements, and therefore these requirements need to be appropriately modified for the grid operators to use. These additional steps add to the investment and operational cost to the grid operators. Through the ARIES platform, this proposed project aims to bridge this gap and use power hardware-in-the-loop (PHIL) and controller hardware-in-the-loop (CHIL) experiments to inform the creation of open-source interconnection and interoperability information that can aid in faster and cheaper installation and operation of grid-forming fuel cell inverters.

08 HYDROGEN↗

A proposed change to the NASA strategy for servicing space assets

Given the limitations of the present Shuttle manifest, it is necessary for NASA to consider revision of its previous strategy for servicing satellites. This is particularly important in a period of tight budgets, when space assets will be difficult to replace. Therefore on-orbit assets take on additional value and keeping these assets operational will take on added importance. The key to maintaining these assets will be the long term strategy of developing a remote servicing capability which is space based and has a minimum reliance on the Shuttle. Such a strategy will require that the users of this servicing system design serviceable spacecraft at a high level and that these assets be located in or be capable of reaching orbits that are accessible to or compatible with the proposed servicing infrastructure. The infrastructure required to support this type of remote servicing architecture and the development of the necessary systems, tools, and procedures required to support a remote servicing architecture of this type are addressed.

Levin, George C.↗

Asset surveillance system: apparatus and method

System and method for providing surveillance of an asset comprised of numerically fitting at least one mathematical model to obtained residual data correlative to asset operation; storing at least one mathematical model in a memory; obtaining a current set of signal data from the asset; retrieving at least one mathematical model from the memory, using the retrieved mathematical model in a sequential hypothesis test for determining if the current set of signal data is indicative of a fault condition; determining an asset fault cause correlative to a determined indication of a fault condition; providing an indication correlative to a determined fault cause, and an action when warranted. The residual data can be mode partitioned, a current mode of operation can be determined from the asset, and at least one mathematical model can be retrieved from the memory as a function of the determined mode of operation.

Bickford, Randall L.↗

Systems and methods for controlling an industrial asset in the presence of a cyber-attack

Systems and methods are provided for the control of an industrial asset, such as a power generating asset. Accordingly, a cyber-attack model predicts a plurality of operational impacts on the industrial asset resulting from a plurality of potential cyber-attacks. The cyber-attack model also predicts a corresponding plurality of potential mitigation responses. In operation, a cyber-attack impacting at least one component of the industrial asset is detected via the cyber-attack neutralization module and a protected operational impact of the cyber-attack is identified based on the cyber-attack model. The cyber-attack neutralization module selects at least one mitigation response of the plurality of mitigation responses based on the predicted operational impact and an operating state of the industrial asset is altered based on the selected mitigation response.

D'Amato, Fernando Javier↗

A Knowledge Graph Approach to Analyze Systems and Assets Health

Nuclear power plants collect large amounts of equipment reliability data elements that contain information on the statuses of component, assets, and systems. All these data elements precisely record asset and system performance and health throughout the lifecycle of those assets and systems. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers or databases), others are conceptual in nature (i.e., data elements come in different formats, numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). This paper directly focuses on the integration of numeric and textual data elements in order to assist plant system engineers in analyzing equipment reliability data. This task begins with preprocessing the data by extracting knowledge from textual data via natural language processing methods and quantifying system, asset, and component health based on numeric data. We then employed model-based system engineering (MBSE) models of systems and assets to identify their architecture and functional (i.e., cause and effect) relations. Data elements were then associated with a single MBSE graph element, based on their nature. This bonding of MBSE models and data elements constitutes a first-of-its-kind knowledge graph of a nuclear power plants system, with data elements being organized in a structured manner that enables system engineers to identify cause-effect trends in data elements and carry out appropriate actions in response.

97 - MATHEMATICS AND COMPUTING↗

Quantifying the regional stranded asset risks from new coal plants under 1.5 °C

Momentum to phase out unabated coal use is growing globally. This transition is critical to meeting the Paris climate goals but can potentially lead to large amounts of stranded assets, especially in regions with newer and growing coal fleets. Here we combine plant-level data with a global integrated assessment model to quantify changes in global stranded asset risks from coal-fired power plants across regions and over time. With new plant proposals, cancellations, and retirements over the past five years, global net committed emissions in 2030 from existing and planned coal plants declined by 3.3 GtCO 2 (25%). While these emissions are now roughly in line with initial Nationally Determined Contributions (NDCs) to the Paris Agreement, they remain far off track from longer-term climate goals. Progress made in 2021 towards no new coal can potentially avoid a 24% (503 GW) increase in capacity and a 55% ($520 billion) increase in stranded assets under 1.5 °C. Stranded asset risks fall disproportionately on emerging Asian economies with newer and growing coal fleets. Recent no new coal commitments from major coal financers can potentially reduce stranding of international investments by over 50%.

54 ENVIRONMENTAL SCIENCES↗

Grid Utility Asset Vulnerability Assessment (GUAVA) Software Tool

Increasing demand and changes in generation portfolios is pushing power grid to operate towards the limit. However, due to lack of analytical tools for understanding various scales of impact on grid, it is becoming more vulnerable to wide scale power outages and blackouts. A vulnerable grid operating at its limit can be easily disrupted by asset failures caused by devastating hurricanes which has been known to damage transmission and distribution lines along its track. In this direction, researchers have focused on determining these assets by conducting Monte Carlo simulations of hurricanes with uncertainties and collected a large set of simulation data. To determine the infrastructure updates necessary for mitigating wide scale impact of hurricanes on the grid, we propose a software tool named “Grid Utility Asset Vulnerability Analysis” (GUAVA) framework. GUAVA presents a novel data-driven probabilistic analytical approach to (1) post-process hurricane failure scenarios, (2) identify/rank assets that are most vulnerable and critical to failing and are associated with highest impact/risk, and (3) to inform system upgrade decisions & prioritization. Based on the observed results and employed data-driven methodology, it is expected GUAVA can be adapted to provide power system planners with a recommendation engine for making informed decisions to improve resilience of grid.

Mahapatra, Kaveri↗

Enabling Principles for Dual Participation by Energy Storage as a Transmission and Market Asset

Because the electric transmission system is sized to meet the highest levels of customer demand, much of its designed capacity goes unused during average operating conditions. As a uniquely flexible and scalable asset capable of providing multiple grid services, energy storage can be deployed to support the transmission system and then also provide services to energy markets when not needed for transmission. This paper reviews the technical barriers in transmission planning practices and energy market design that prevent the realization of dual-use energy storage projects that provide both regulated transmission and competitive market services. Current practices create barriers against the identification of energy storage in the transmission planning process and against the participation of a regulated transmission asset in competitive energy markets. A review of regional transmission plans identifies best practices for including energy storage in the planning process by directing planners to proactively identify such projects or by providing clear mechanisms for stakeholders to propose them. Creating a market participation model for dual-use energy storage assets requires establishing when an asset will be allowed to participate in the market, how it will participate in the market, and where it will recover its costs. In answering these questions, key principles must be satisfied, such as prioritizing reliability, incrementally building on existing market design, and balancing competing objectives. Several policy options exist for satisfying those principles, giving grid operators and stakeholders significant flexibility in developing a dual-use participation model in accordance with regional policies and conditions. By objectively framing the issue and identifying policy options, this paper may inform subsequent proceedings on dual-use energy storage and be a resource to regional market operators, utilities, developers, regulators, policymakers, and other stakeholders as they collectively work on this complex issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Storage as a Transmission Asset: Initial Considerations for an Emerging Use Case

Deploying energy storage as an electric transmission system asset is a unique use case that, despite a body of policy and regulatory support, has received little attention or investment in the United States. The benefits of using storage on the transmission system—and the remaining barriers to that use—have been explored elsewhere. This paper complements that body of research by exploring the finance implications of using energy storage as a transmission asset (SATA). Because transmission infrastructure in the U.S. is generally subject to rate-of-return regulation, in which asset owners receive both a return of their invested capital and a return on that capital, storage assets deployed for that use are not subject to market volatility and have a much lower risk profile overall. That lower risk profile would, in theory, correspond to lower interest rates and other more favorable financing terms relative to a storage project deployed in a market setting. This paper draws from corollaries in other markets to estimate the expected finance impacts of SATA projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges and Opportunities for Electric Utility Modeling and Asset Valuation Frameworks: Case Study on Valuing New Pumped Storage Hydropower

Asset valuation by electric utilities is becoming increasingly difficult in the rapidly changing electric sector. Rapid deployment of variable generation and inverter-based storage systems along with uncertain demand growth, climate, policies, and other factors create a challenging environment for understanding the value proposition of a new potential asset. This report describes an effort between the Tennessee Valley Authority (TVA) and three U.S. Department of Energy laboratories to perform a detailed review of utility modeling and analysis practices for asset valuation and identify challenges and opportunities for advancing its methods into the future. It focuses on a case study of new potential pumped storage hydropower (PSH) because of growing interest in new PSH capacity to provide energy balancing, firm capacity, and a range of ancillary services. Staff from the DOE labs conducted systematic interviews about current practices in capacity expansion modeling, production-cost modeling, hydrological modeling, and transmission stability modeling while also discussing how scenario analysis is conducted and how models and data are integrated. The effort resulted in a set of model, integration, and scenario recommendations that could be valuable to TVA, other utilities, system operators, and other stakeholders conducting integrated grid analysis. Individual model recommendations suggest exploring computational tradeoffs with detail and resolution across spatiotemporal structure, supply- and demand-side details, transmission overlays, market interactions, and ancillary services. Automated processes to pass data between models and conduct larger scenario suites could also enhance valuation practices by enabling a more consistent study of asset value across a broader range of uncertain future grid conditions where PSH could be particularly valuable. TVA and other industry stakeholders can learn from and adapt applied research-grade methods developed by DOE laboratories and other research institutions to improve decision making and accelerate progress towards a reliable, economic, sustainable energy system.

13 HYDRO ENERGY↗

Solar Tower Experiments for Radiometric Calibration and Validation of Infrared Imaging Assets and Analysis Tools for Entry Aero-Heating Measurements

The NASA Engineering and Safety Center sponsored Hypersonic Thermodynamic Infrared Measurements assessment team has a task to perform radiometric calibration and validation of land-based and airborne infrared imaging assets and tools for remote thermographic imaging. The IR assets and tools will be used for thermographic imaging of the Space Shuttle Orbiter during entry aero-heating to provide flight boundary layer transition thermography data that could be utilized for calibration and validation of empirical and theoretical aero-heating tools. A series of tests at the Sandia National Laboratories National Solar Thermal Test Facility were designed for this task where reflected solar radiation from a field of heliostats was used to heat a 4 foot by 4 foot test panel consisting of LI 900 ceramic tiles located on top of the 200 foot tall Solar Tower. The test panel provided an Orbiter-like entry temperature for the purposes of radiometric calibration and validation. The Solar Tower provided an ideal test bed for this series of radiometric calibration and validation tests because it had the potential to rapidly heat the large test panel to spatially uniform and non-uniform elevated temperatures. Also, the unsheltered-open-air environment of the Solar Tower was conducive to obtaining unobstructed radiometric data by land-based and airborne IR imaging assets. Various thermocouples installed on the test panel and an infrared imager located in close proximity to the test panel were used to obtain surface temperature measurements for evaluation and calibration of the radiometric data from the infrared imaging assets. The overall test environment, test article, test approach, and typical test results are discussed.

Splinter, Scott C.↗

MaROS: Web Visualization of Mars Orbiting and Landed Assets

Mars Relay operations currently involve several e-mails and phone calls between lander and orbiter teams in order to settle on an agreed time for performing a communication pass between the landed asset (i.e. rover or lander) and orbiter, then back to Earth. This new application aims to reduce this complexity by presenting a visualization of the overpass time ranges and elevation angle, as well as other information. The user is able to select a specific overflight opportunity to receive further information about that particular pass. This software presents a unified view of the potential communication passes available between orbiting and landed assets on Mars. Each asset is presented to the user in a graphical view showing overpass opportunities, elevation angle, requested and acknowledged communication windows, forward and back latencies, warnings, conflicts, relative planetary times, ACE Schedules, and DSN information. This software is unique in that it is the first of its kind to visually display the information regarding communication opportunities between landed and orbiting Mars assets. The software is written using ActionScript/FLEX, a Web language, meaning that this information may be accessed over the Internet from anywhere in the world.

Wallick, Michael N.↗

RAPID: Collaboration Results from Three NASA Centers in Commanding/Monitoring Lunar Assets

Three NASA centers are working together to address the challenge of operating robotic assets in support of human exploration of the Moon. This paper describes the combined work to date of the Ames Research Center (ARC), Jet Propulsion Laboratory (JPL) and Johnson Space Center (JSC) on a common support framework to control and monitor lunar robotic assets. We discuss how we have addressed specific challenges including time-delayed operations, and geographically distributed collaborative monitoring and control, to build an effective architecture for integrating a heterogeneous collection of robotic assets into a common work. We describe the design of the Robot Application Programming Interface Delegate (RAPID) architecture that effectively addresses the problem of interfacing a family of robots including the JSC Chariot, ARC K-10 and JPL ATHLETE rovers. We report on lessons learned from the June 2008 field test in which RAPID was used to monitor and control all of these assets. We conclude by discussing some future directions to extend the RAPID architecture to add further support for NASA's lunar exploration program.

Torres, R. Jay↗

Lunar Asset Messaging and On Orbit Navigation

NASA has titled its 2020 thrust for the Moon, Artemis. The increased focus on the Moon as a destination for future human and robotic expeditions necessitates general purpose navigational and communications infrastructure reducing their complexity to help establish a sustained presence. A framework through which Lunar missions can relay communications and localize their positions shifts the burden from the individual mission and enables resource allocation tailored to mission-specific goals. During the summer of 2020, student interns under the Innovation to Flight (i2F) program at the National Aeronautics and Space Administration’s (NASA) Jet Propulsion Laboratory (JPL) in collaboration with the University of Colorado Boulder designed, built, and tested a prototype framework capable of providing surface assets with communication and positioning services. The team utilized the existing i2F CubeSat bus in addition to developing several CubeSat engineering development units (EDUs), a ground vehicle, and a ground station to simulate a scenario in which a lunar surface mission is supported by these services. A primary goal of the summer was to develop a method for localizing the ground vehicle through trilateration. Distances are inferred from the round-trip time of flight (ToF) of radio signals between an asset and several elements. Signals were sent and received using LimeSDR software defined radios on-board both the ground vehicle and the EDUs; ToF and trilateration were calculated on a Qualcomm Snapdragon development board located within the LA MOON payload data system. The ModalAI chipset on the Qualcomm was instrumental in executing visual based position estimation. Communications was facilitated through a bent-pipe approach addressing the NASA requirement to provide solutions for in communication denied locations. The ground vehicle relayed information to other surface assets in addition to its ground station through the supporting constellation. This project demonstrates the feasibility of a lunar CubeSat constellation for the support of surface assets and explores packaging and operations of the components critical to trilateration and bent-pipe communication into a standard CubeSat form factor. When implemented, this framework will open a door for new surface missions designed with lower power requirements and increased operational access.

Huang, Calvin↗

Interconnection and Interoperability Requirements of Hydrogen Assets to Enable Grid Integration

Traditionally, the inverters used for distributed energy resources (DERs) including solar, energy storage and hydrogen fuel cells are grid following assets. Grid following assets track real power and reactive power setpoints decided by either a local autonomous controller or a remote controller like a microgrid controller. In the past five years, multiple challenges have increased the need for grid forming inverters that can interface to a wide variety of energy resources. These grid forming inverters are becoming critical assets for power systems to enable the replacement of existing rotational machines and provide grid services such as grid resiliency services and black-start. Hydrogen assets (fuel cells) have the potential to successfully replace rotating machines and act as voltage and frequency master by leveraging the long-duration and seasonal energy storage capabilities of hydrogen technologies. This poster presents the progress made in budget period 1 of the proposed work. We will leverage an existing ARIES platform experimental setup to run power-hardware-in-the-loop and controller-hardware-in-the-loop experiments with grid forming fuel cell inverters to develop and document the standardization requirements.

electrolyzer↗

Energy Assets Transformation Web Mapping Application

This submission contains the link and geospatial materials used in the Energy Assets Transformation Web Mapping Application. The zip file contains 19 geospatial layers in a file geodatabase called EAT.gdb to be grouped in the following categories. 1. Industrial Assets: Coal Generation Units Retirements 2012-2040 (EIA); Examples of Repurposing Projects (32 projects in total); Abandoned Coal Mines (CORD, SkyTruth); Abandoned or Orphaned Wells (for ten states only). 2. Energy Transition Communities: 48C (e) Tax Credits - Designated Energy Communities (IRA); Index of Deep Disadvantage; Local Energy Action Program (LEAP); EJ Index for Proximity to Hazardous Waste (EPA). 3. Regional Landscape: State-Level Funding Programs (relevant to repurposing projects, for 2022 and 2023 only); Coal Flows from Mine to Plant 2021 (EIA), Variable Renewable Energy Shares (Wind and Solar, 2021, EIA). 4. Supporting Infrastructure: Railroads (HIFLD), Electric Power Transmission Lines (HIFLD), Major Highways (NHPN, DOT), Major Ports (National Atlas of the U.S.); Independent System Operators (HIFLD), NERC Regions and Subregions (HIFLD).

abandoned coal mines↗

Evolution of Programmatic Asset Lifecycle Planning at MESA

Early on in 2018 Sandia recognized the Microsystems Engineering, Science and Applications (MESA) Programmatic Asset Lifecycle Planning capability to be unpredictable, inconsistent, reactive, and unable to provide strong linkage to the sponsor's needs. The impetus for this report is to share learnings from MESA's journey towards maturing this capability. This report describes re-building the foundational elements of MESA's Programmatic Asset Lifecycle Planning capability using a risk-based, Multi-Criteria Decision Analysis (MCDA) approach. To begin, MESA's decades-old Piano Chart + Ad Hoc Hybrid Methodology is described with a narrative of its strengths and weaknesses. Then its replacement, the MCDA /Analytical Hierarchy Process, is introduced with a discussion of its strengths and weaknesses. To generate a realistic Programmatic Asset Lifecycle Planning budget outlook, MESA used its rolling 20-year Extended Life Program Plan (MELPP) as a baseline. The new MCDA risk-based prioritization methodology implements DOE/NNSA guidelines for prioritization of DOE activities and provides a reliable, structured framework for combining expert judgement and stakeholder preferences according to an established scientific technique. An in-house Hybrid Decision Support System (HDSS) software application was developed to facilitate production of several key deliverables. The application enables analysis of the prioritization decisions with charts to display and provide linkage of MESA's funding requests to the stakeholders' priorities, strategic objectives, nuclear deterrence programs, MESA priorities, and much more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗