AI-Based Faster-Than-Real-Time Stability Assessment of Large Power Systems with Applications on WECC System

Achieving clean energy goals will require significant advances in regard to addressing the computational needs for next-generation renewable-dominated power grids. One critical obstacle that lies in the way of transitioning today’s power grid to a renewable-dominated power grid is the lack of a faster-than-real-time stability assessment technology for operating a fast-changing power grid. This paper proposes an artificial intelligence (AI) -based method that predicts the system’s stability margin information (e.g., the frequency nadir in the frequency stability assessment and the critical clearing time (CCT) value in the transient stability assessment) directly from the system operating conditions without performing the conventional time-consuming time-domain simulations over detailed dynamic models. Since the AI method shifts the majority of the computational burden to offline training, the online evaluation is extremely fast. This paper has tested the AI-based stability assessment method using multiple dispatch cases that are converted and tuned from actual dispatch cases of the Western Electricity Coordinating Council (WECC) system model with more than 20,000 buses. The results show that the AI-based method could accurately predict the stability margin of such a large power system in less than 0.2 milliseconds using the offline-trained AI agent. Therefore, the proposed method has great potential to achieve faster-than-real-time stability assessment for practical large power systems while preserving sufficient accuracy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spatiotemporal Pattern Recognition in the PMU Signals in the WECC system

Phasor measurement unit (PMU) data has been used by multiple power system applications, including state estimation, post event analysis, oscillation detection, model validation, and many others. Still, due to its big data nature and availability to general research institutions, comprehensive understanding of the spatiotemporal patterns and underlying mechanisms are incomplete. This study applies a set of signal processing and machine learning approaches aiming at deciphering the characteristic behaviors of multiple phasor measurement units (PMUs) attributes (e.g., voltage, frequency, rate of change of frequency, phase angle), including their auto-correlation, cross-dependence, similarities and discrepancies across units and temporal scales, and distributions of anomalies and their linkages to potential external factors such as weather events. Data analytics are applied to PMUs from the U.S. Western Electricity Coordinating Council (WECC) system. The PMU measurements, recorded events, outages, and weather extremes are all from real world datasets. The findings from the study and mechanistic understanding of the PMU dynamics help provide guidance on system control or preventing blackouts. The derived metrics can be directly used for adjusting or filtering simulated PMU data used for advanced algorithm development.

Hou, Zhangshuan↗

Simulating Distributed Energy Resource Responses to Transmission System-Level Faults Considering IEEE 1547 Performance Categories on Three Major WECC Transmission Paths

This study performs a large quantity of transmission and distribution simulations for three regions in the Western Interconnection along with final transmission simulations informed by distribution simulation results. Results find that the type of ride-through implemented by distributed energy resources (DERs) is a significant factor to the overall power system response to transmission-level faults. This impact is particularly high for transmission-level faults that depress voltage levels for high numbers of substations (i.e., for cases that experience large regional voltage sags). Because of the programmed nature of the ride-through of IEEE 1547-compliant DERs, the potential for large reductions in real power injection is possible based on IEEE 1547 interpretation and specific implementation. In this study, we made a first attempt to determine the quantity of DERs affected by a variety of transmission-level faults as well as a granular response of distribution-simulated DERs to a few types of IEEE 1547-2003 interpretations and IEEE 1547-2018 voltage ride-through categories. The distribution-informed transmission studies show that the category of IEEE 1547 adherence, particularly with the new 2018 standard, can have a significant impact on the amount of DER-based generation lost following transmission-level fault events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Parameter Reduction of Composite Load Model Using Active Subspace Method

Over the past decades, the increasing penetration of distributed energy resources (DERs) has dramatically changed the power load composition in the distribution networks. The traditional static and dynamic load models can hardly capture the dynamic behavior of modern loads especially for fault-induced delayed voltage recovery (FIDVR) events. Thus, a more comprehensive composite load model with combination of static load, different types of induction motors, single-phase A/C motor, electronic load and DERs has been proposed by Western Electricity Coordinating Council (WECC). However, due to the large number of parameters and model complexity, the WECC composite load model (WECC CMLD) raises new challenges to power system studies. To overcome these challenges, in this paper, a cutting-edge parameter reduction (PR) approach for WECC CMLD based on active subspace method (ASM) is proposed. Firstly, the WECC CMLD is parameterized in a discrete-time manner for the application of the proposed method. Then, parameter sensitivities are calculated by discovering the active subspace, which is a lower-dimensional linear subspace of the parameter space of WECC CMLD in which the dynamic response is most sensitive. The interdependency among parameters can be taken into consideration by our approach. Finally, the numerical experiments validate the effectiveness and advantages of the proposed approach for WECC CMLD model.

active subspace↗

Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: • Federal land jurisdiction, • Existing Section 368 corridors, • Existing transmission lines, • Previously studied corridor locations, and • Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: • The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. • Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. • Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing High PV Penetration Cases for Frequency Response Study of U.S. Western Interconnection

Recent large penetrations of solar photovoltaic (PV) generation and the inertial characteristics of inverter-based generation technologies have caught the attention of those in the electric power industry in the United States. This paper presents a systematic approach to developing test cases of high penetrations of PV for the Western Interconnection. First, to examine the accuracy of the base case model, the Western Electricity Coordinating Council (WECC) model is validated by using measurement data from synchronized phasor measurement units. Based on the 2022 Light Spring case, we developed four high PV penetration cases for the WECC system that are of interest to the industry: 5% PV+15 % wind, 25% PV+15% wind, 45% PV+15% wind, 65% PV+15% wind). Additionally, a method to project PV is proposed that is based on collected, realistic PV distribution information, including the current and future PV power plant locations and penetrations in the WECC system. Both the utility-scale PV plant and residential rooftop PV are included in this study.

14 SOLAR ENERGY↗

Analysis of Benefits of an Energy Imbalance Market in the NWPP

The Northwest Power Pool (NWPP) Market Assessment Committee (MC) Initiative, which was officially launched on March 19, 2012, set out to explore a range of alternatives that could help the Balancing Authorities and scheduling utilities in the NWPP area address growing operational and commercial challenges affecting the regional power system. The MC formed an Analytical Team with technical representatives from each of the member Balancing Areas in the NWPP and with staff of Pacific Northwest National Laboratory (PNNL). This Analytical Team was instructed to conduct extensive studies of intra-hour operation of the NWPP system in the year 2020 and of the NWPP region with 14,671 MW of wind penetration. The effort utilized a sub-hourly production cost model (the PLEXOS® computer model) that inputs data from the Western Electricity Coordinating Council (WECC)-wide Production Cost Model (PCM) to evaluate potential production cost savings. The Analytical Team was given two general options to evaluate: •Energy Imbalance Market (EIM): establishment of an automated, organized NWPP area market for economically supplying energy imbalance within the hour. •Enhanced Market-Operational Tools (EMT) that might augment or replace an EIM. The Analytical The Analytical Team built on the WECC-wide PCM data from prior work done in the WECC and carried forward the evolution of the original WECC Transmission Expansion Planning Policy Committee (TEPPC) 2020 PC0 data base. A large number of modifications and improvements were made to this case and the data were subjected to extensive review by the team members to improve the model representation of the Northwest (NW). MC meetings that were open to the public were held for interested parties to review and provide input to the study. Results for the test, base, and sensitivity case studies performed by the MC Initiative Analytical Team indicate that there are a wide range of benefits that could be obtained from the operation of an EIM in the NWPP depending on what assumptions are made. The instructions from the MC were to determine a "minimum high confidence" range of potential benefits. The results for the Base Case indicate that the EIM benefits ranged from approximately $40 million to $70 million in annual savings from the operation of an EIM in the NWPP footprint. A number of additional relevant sensitivity cases were performed, including low and high water conditions, low and high natural gas prices, and various flex reserve requirements, resource operations, and amounts of resource capability held back during the preschedule period. Along with the results for the Base Case, the results for these studies yielded EIM benefits that clustered within the range of $70 to $80 million dollars per year with potential benefits ranging from approximately $125 million to as little as $17 million per year. Because the design and operation of an EIM could enable participating Balancing Authorities (BAs) to collectively lower the quantity of resources they must carry to meet within-hour balancing needs, a sensitivity case was also performed to analyze the impact that such reductions might have on the benefits from an EIM. The results for this sensitivity case indicate that such reductions could increase the benefits from the operation of an EIM in the NWPP into the range of approximately $130 million to $160 million per year. Also, a sensitivity case for a WECC-wide EIM was performed with the results indicating that the potential benefits to the NWPP could increase into the range of $197 million to $233 million per year. While there may be potential reliability benefits from the coordinated dispatch process underlying the operation of an EIM, reliability benefits from an EIM were out of the scope of this study. The EIM benefit analyses that were performed by the Analytical Team are provided in this report.

Power markets, NWPP, Energy Imbalance, EIM, Renewa↗

Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Consolidating Balancing Authorities and Sharing Balancing Reserves

The study described in this chapter demonstrates the benefits of BA consolidation with the help of a detailed WECC system model and advanced methodology, which is also described in this chapter. The study aims to determine the potential savings in production cost and reduction in balancing reserve requirements in the WECC system. The study has found that effective use of the diversity in load and variable generation over a wide area can indeed help to achieve significant savings. The implementation cost for the consolidation was beyond the scope of this study. The analysis was performed for two different scenarios of VG penetration: 11% (8% wind and 3% solar) and 33% (24% wind and 9% solar) of WECC projected energy demand in 2020. In analysis of balancing reserves, the objective was to determine the reduction in balancing reserve requirements due to BA consolidation, in terms of required capacity and ramp-rates. Hour-ahead and 10-minute ahead forecast errors for load, wind, and solar were simulated. In addition, 1-minute resolution load, wind and solar data were used to derive balancing reserve requirements i.e. load-following and regulation requirements for each individual BA and for the consolidated BA (CBA). The reduction in balancing reserves was determined by calculating the difference between total reserve requirements that need to be carried by different BAs if they operate individually, and reserve requirements that need to be carried by the CBA. The study results show that the consolidated WECC system would have about a 50% overall reduction in balancing reserves for the 11% penetration scenario and a 65% reduction for the 33% penetration scenario in comparison with total reserve requirements that need to be carried by different BAs if they operate individually.

balancing authorities consolidation↗

Renewable Generation Effect on Net Regional Energy Interchange: Preprint

Using production-cost model (PLEXOS), we simulate the Western Interchange (WECC) at several levels of the yearly renewable energy (RE) generation, between 13% and 40% of the total load for the year. We look at the overall energy exchange between a region and the rest of the system (net interchange, NI), and find it useful to examine separately (i) (time-)variable and (ii) year-average components of the NI. Both contribute to inter-regional energy exchange, and are affected by wind and PV generation in the system. We find that net load variability (in relatively large portions of WECC) is the leading factor affecting the variable component of inter-regional energy exchange, and the effect is quantifiable: higher regional net load correlation with the rest of the WECC lowers net interchange variability. Further, as the power mix significantly varies between WECC regions, effects of ‘flexibility import’ (regions ‘borrow’ ramping capability) are also observed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Balancing authorities, hurdle rates, economic disp↗

Adaptive RAS/SPS System Settings for Improving Grid Reliability and Asset Utilization through Predictive Simulation and Controls

Remedial Action Schemes (RAS) or Special Protection Schemes (SPS) are used throughout the bulk transmission system as a non-wires method of increasing transmission transfer capability. However, as the population grows within the Western Interconnection, more power needs to be transferred with less ability to build lines. This leads to a greater number of RAS, and the subsequent interaction between these disparate schemes can have unintended consequences. While the large number of RAS within the Western Electricity Coordinating Council (WECC) protect for different things, which can range from the violation of thermal limitations to transient stability issues, they can be described by common methods of operation. In order to understand these methods, a survey was sent out to members of the WECC Modeling & Validation Working Group (MVWG). The response received provides a necessary base in which to understand and build models that can be used within WECC. This report provides information on the survey results regarding RAS/SPS modeling practices for planning and operational studies within the WECC footprint, which is foundational for on-going and future work on RAS. Pacific Northwest National Laboratory (PNNL) and its industry partners are developing innovative methods for adaptively setting RAS parameters based on realistic and near real-time operational conditions to improve power grid reliability and grid asset utilization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-Water Impacts on Interconnection-Scale Electricity System Planning

A growing literature emphasizes the importance of integrating climate change impacts into electricity system planning. Rising average temperatures can increase and shift electricity demand while reducing generator and transmission efficiency. Changes to water availability and quality can reduce the output of thermally cooled generators and hydropower. Electric power grids across the US and globally are undergoing transformational changes that present new opportunities and challenges to reliability assurance. However, electric utilities and system operators have limited internal capabilities to incorporate these effects into planning practices. This work addresses gaps in utility and system planner practices by integrating climate-water-electricity expertise from universities and U.S. Department of Energy National Laboratories with electricity system planners and stakeholders in the Western Electricity Coordinating Council (WECC). Using a highly collaborative approach, global climate model data, high-resolution hydrology models, and long-term electric sector capacity expansion tools are employed to analyze a range of climate outcomes for future electricity scenarios aligned with recent WECC planning studies. Doing so allows WECC to expand its climate-agnostic planning assessments to consider how future temperature and precipitation patterns could influence generation and transmission planning. We explore how changes to climate-water conditions can affect power plant investment and operation, system economics, and environmental impacts, providing an expanded perspective on interconnection-wide decision making under climate uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Opportunities for Joint Water–Energy Management: Sensitivity of the 2010 Western U.S. Electricity Grid Operations to Climate Oscillations

The 2016 SECURE Water Act report’s natural water availability benchmark, combined with the 2010 level of water demand from an integrated assessment model, is used as input to drive a large-scale water management model. The regulated flow at hydropower plants and thermoelectric plants in the Western U.S. electricity grid (WECC) is translated into potential hydropower generation and generation capacity constraints. The impact on reliability (unserved energy, reserve margin) and cost (production cost, carbon emissions) of water constraints on 2010-level WECC power system operations is assessed using an electricity production cost model (PCM). Use of the PCM reveals the changes in generation dispatch that reflect the inter-regional interdependencies in water-constrained generation and the ability to use other generation resources to meet all electricity loads in the WECC. August grid operational benchmarks show a range of sensitivity in production cost (-8 to +11%) and carbon emissions (-7 to 11%). The reference reserve margin threshold of 15% above peak load is maintained in the scenarios analyzed, but in 5 out of 55 years unserved energy is observed when normal operations are maintained. There is 1 chance in 10 that a year will demonstrate unserved energy in August, which defines the system’s historical performance threshold to support impact, vulnerability, and adaptation analysis. For seasonal and longer term planning, i.e., multi-year drought, we demonstrate how the Water Scarcity Grid Impact Factor and climate oscillations (ENSO, PDO) can be used to plan for joint water-electricity management to maintain grid reliability.

adaptation↗