Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uranium waste”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Effects of Mineral Impurities and Heat on Uranium(VI) Sorption onto Bentonite (Final Report)

Most nuclear waste disposal options include compacted bentonite, consisting of montmorillonite clay, as part of a barrier system to minimize contaminant mobility. Uranium (U) is the primary element in spent nuclear fuel, and from an environmental perspective, a potential contaminant of water resources. Furthermore, uranium may control nuclear fuel degradation rates and the consequent release of other radioactive contaminants based on its diffusive transport away from waste canisters. Uranium sorption onto clay and other mineral surfaces is expected to limit U(VI) mobility in these systems. However, at this point a prediction of U(VI) sorption and transport behavior in performance assessment (PA) models is complicated by a series of factors, such as: (1) the presence of various U(VI) solution species with different charges and sorption characteristics; (2) the complex microstructure of montmorillonite clay resulting in two types of clay porosities and multiple sorption sites; (3) the largely unknown effects of bentonite mineral impurities on pore water chemistry, U(VI) sorption and diffusion behavior; and (4) the potential impacts of heat, generated by the decay of spent fuel, on mineralogical and microstructural transformations, and any subsequent effects on radionuclide sorption and mobility. In this project, we investigated the effects of calcite impurities on U(VI) sorption and diffusion onto montmorillonite before and after mineral exposure to heat. Overall, our main goals were to: 1. Gain a mechanistic understanding of the effects of calcite impurities on U(VI) sorption and diffusion in montmorillonite/bentonite at variable chemical conditions, and before and after mineral exposure to heat; and to 2. Work towards the development of new surface complexation and diffusion models to predict U(VI) sorption and mobility in montmorillonite/bentonite while accounting for the impacts of calcite impurities and heat. In order to achieve these goals, we pursued the following research objectives and tasks: 1. Characterize the effects of calcite impurities on U(VI) sorption onto Na-montmorillonite, and evaluate if and how these effects change due to solids’ exposure to heat (Task 1). 2. Characterize U(VI) surface speciation in solid samples from Task 1, with a particular focus on U(VI) precipitates and co-precipitates (Task 2). 3. Test the relevance of observed changes in U(VI) sorption characteristics for U(VI) diffusive transport behavior in bentonite barriers (Task 3). 4. Evaluate the exclusion of anionic U(VI) solution complexes from clay nanopores (Task 4). 5. Building on Tasks 1-4, start the development of new surface complexation and reactive transport models that can simulate and predict U(VI) sorption and diffusion in complex bentonite systems (Task 5). A detailed description of all tasks, and their specific results and conclusions is provided in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Borate and Organics on U(VI) Solubility in WIPP Brine

The solubility of uranium (VI) in Waste Isolation Pilot Plant (WIPP)-relevant brine was determined to support ongoing WIPP recertification activities. This research was performed by the Los Alamos National Laboratory Carlsbad Operations (LANL-CO) Actinide Chemistry and Repository Science Program (ACRSP). The WIPP Actinide Source Term Program (ASTP) did not develop a model for the solubility of actinides in the VI oxidation state. The solubility of UO 2 2+ , in the absence of WIPP specific data, is presently set to be equal to a conservatively high 1 mM within the WIPP Performance Assessment (PA) for all expected WIPP conditions (SOTERM, 2019) as selected at the recommendation of the Environment Protection Agency (EPA) (EPA, 2005). According to the current WIPP chemistry model assumptions and conditions, the expected pC H+ is about 9.5 and controlled by MgO buffering CO 3 2- . The goal of this study is to perform screening experiments that account for the contributions of organics and borate on uranium solubility. In this report, the solubility of U(VI) was determined at pC H+ 9 WIPP brine in the absence or presence of borate and organics at under-saturation approach. Experiments were equilibrated for about 135 days. Organic compounds present in WIPP waste can form strong complexes with actinides and can affect the oxidation states of actinides. The organic compounds addressed in WIPP performance assessment include EDTA (Ethylenediaminetetraacetic Acid), oxalate, citrate, and acetate (SOTERM, 2019). These data quantify the effects of WIPP-relevant concentrations of borate and organics effects on the solubility of U(VI) to challenge the predictions of the WIPP actinide model and inform decisions and recommendations made in the upcoming recertification of the WIPP (CRA-2024). The experiments performed were done according to the U.S. Department of Energy (DOE) approved Test Plan entitled “Experimental Strategy to Challenge Actinide Solubility Predictions” and designated LCO-ACP-26. All data reported were obtained under the LANL-CO Quality Assurance Program, which is compliant with the DOE Carlsbad Field Office, Quality Assurance Program Document (CBFO/QAPD) (QAPD, 2017).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Structural Changes in Molten Salt Fuel and/or Waste Stream Compounds Cs 2 UCl 6 and Cs 2 UO 2 Cl 4 from Room Temperature to Melting and Related Materials [Slides]

Perovskite phases have been explored in recent literature as waste forms for long term storage of radioactive waste from molten salt reactors specifically. Synthesis of new halide perovskite phases can inform these efforts as well as molten salt reactor chemistry in general. Inorganic perovskites have also shown promise as new scintillating materials for detection of X-rays and gamma rays. Modifying the structure and chemistry of these compounds, perhaps with organic components, could be used to synthesize new scintillating compounds or modify the properties of existing ones. Both U 6+ and U 4+ readily form compounds with a striking similarity to vacancy ordered perovskites (Cs 2 UO 2 Cl 4 and Cs 2 UCl 6 ). Each of these compounds is relevant to molten salt reactor chemistry and/or waste streams. These phases could from in uranium chloride salt systems or waste streams: Cs being a fission product.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biosorption of Uranium by Bone Meal

The treatment of aqueous solution waste containing organic compounds and radionuclides has always been a great concern since the processes available are usually expensive and unfeasible for the low volume of radioactive liquid waste recovered. In view of a more efficient and low cost treatment, biosorption-based technologies for the removal of this hazardous radionuclides, heavy metals, and organic substances from contaminated matrices have been studied as an alternative process. In this context, bone meal is the material of choice, and contains calcium phosphate in the form of hydroxyapatite. Previous studies with hydroxyapatite showed that this material is efficient in removing heavy metals from polluted soils due to its adsorbing ability. In this context, uranium biosorption capacity by using bone meal was evaluated by different experimental conditions. This study aims at analyzing the capacity of bone meal to remove uranium from aqueous solution through biosorption process, considering that this nuclide is radiotoxic and may cause serious environmental problems and risks to human life if not correctly disposed. The biosorption capacity of U by bone meal was evaluated under different experimental conditions. The results suggested that adsorption with this material can be applied in the treatment of aqueous solutions as a low-cost and highly efficient alternative to remove U. Therefore, we believe that our results are useful for other investigators dealing with similar problems. Further work is required to evaluate this material as a potential adsorbent concerning the treatment of liquid organic radioactive waste containing uranium. Next studies are crucial to ascertain the biosorption efficiency, by analyzing other variables, such as adsorbent dosage, pH and temperature.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium carbonate complexes demonstrate drastic decrease in stability at elevated temperatures

Quantitative understanding of uranium transport by high temperature fluids is crucial for confident assessment of its migration in a number of natural and artificially induced contexts, such as hydrothermal uranium ore deposits and nuclear waste stored in geological repositories. An additional recent and atypical context would be the seawater inundated fuel of the Fukushima Daiichi Nuclear Power Plant. Given its wide applicability, understanding uranium transport will be useful regardless of whether nuclear power finds increased or decreased adoption in the future. The amount of uranium that can be carried by geofluids is enhanced by the formation of complexes with inorganic ligands. Carbonate has long been touted as a critical transporting ligand for uranium in both ore deposit and waste repository contexts. However, this paradigm has only been supported by experiments conducted at ambient conditions. We have experimentally evaluated the ability of carbonate-bearing fluids to dissolve (and therefore transport) uranium at high temperature, and discovered that in fact, at temperatures above 100 °C, carbonate becomes almost completely irrelevant as a transporting ligand. This demands a re-evaluation of a number of hydrothermal uranium transport models, as carbonate can no longer be considered key to the formation of uranium ore deposits or as an enabler of uranium transport from nuclear waste repositories at elevated temperatures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Literature Review of Documented Persistent Secondary Uranium Sources at DOE LM Sites

The U.S. Department of Energy Office of Legacy Management (LM) has the responsibility to protect human health and the environment at 101 legacy uranium sites across the nation by implementing long-term surveillance and maintenance requirements. Included in these responsibilities is to provide for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public at 21 Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I sites; 6 UMTRCA Title II sites; and 9 Comprehensive Environmental Response, Compensation, and Liability Act/Resource Conservation and Recovery Act sites. These sites are former uranium mills (processing sites), or sites with wastes from processing sites encapsulated in engineered disposal cells (disposal sites), or sites where components of atomic weapons were manufactured. During site characterization, groundwater contamination was often discovered and evaluated or modeled for future movement with the inclusion of uranium sorption in the groundwater plume. Much of this original work did identify uranium processing wastes as the original contaminant source. However, more recent work has identified the existence and influence of persistent secondary uranium sources that may prevent uranium in groundwater from attenuating as quickly as initial evaluations or modeling indicated. By understanding these processes, better decisions can be made to choose the appropriate remediation and closure strategies, identify long-term surveillance and maintenance activities, and more accurately estimate life-cycle costs. The purpose of this report is to summarize the literature available on documented persistence secondary uranium sources at LM sites as part of the Applied Studies and Technology Persistent Secondary Contaminant Sources Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 90: US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes

This panel focused on generation and management of low level and mixed low-level radioactive wastes, challenges for disposition, innovative solutions applied at DOE sites, and collaboration among sites to ensure that waste disposition pathways are understood. In addition, potential policy initiatives were discussed including depleted uranium, elemental mercury, and treatment of legacy mixed waste components. As part of the introduction, Theresa Kliczewski provided an overview of why this panel is relevant: problematic mixed waste streams still exist across the DOE cleanup complex. Theresa noted that the DOE EM Headquarters Office of Waste and Materials Management (EM-4.2), for which she is employed with, continues to work with the DOE cleanup sites on a path forward for these problematic mixed waste streams. As part of this effort, EM-4.2 requested that the Energy Facility Contractors Group (EFCOG) perform a review of all the DOE sites problematic mixed waste streams. Panelists with presentations: Challenging Waste Streams: Disposition of Depleted Uranium Oxide Conversion Product (Douglas Tonkay); EFCOG WMWG Challenging Waste Subgroup (Tammy Monday); Mercury Waste Challenges (John Wrapp); Legacy Large Mixed Waste Components (Kalli Shupe)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY24 Task 4: Studies of Phosphate and Fluoride Solubility for Dissolution of High Phosphate Tank Waste

Knowledge gaps have been identified in phosphate solubility in almost every single- and multi-component system, and particularly for aluminate in phosphate/hydroxide, where uncertainties in predicted values of aluminum solubility are greater than 50%. Solubility data of multicomponent, aqueous electrolytes containing sodium hydroxide, sodium fluoride, sodium phosphate, sodium nitrite, sodium nitrate, and dissolved gibbsite are also sparse. For example, for solutions of (i) sodium nitrate and sodium phosphate, data are only available at 30 and 50 °C, and for (ii) dissolved gibbsite in sodium hydroxide and sodium phosphate, only two data points are available at 20 and 40 °C. There is no data available on mixtures of sodium hydroxide, sodium phosphate, sodium fluoride, and dissolved gibbsite. These knowledge gaps were identified in a technical review of waste solubility data and the impact of dilution on solution stabilities and will be addressed in this work to predict aluminum hydroxide and sodium phosphate solubility in multicomponent electrolytes upon dilution, and upon variation of temperature. Results will provide the technical basis to develop accurate models for (i) gibbsite solubility and mass transfer of aluminum between solid and liquid forms following the sluicing of sludge and saltcake with water; and (ii) further blending of these suspensions with bismuth from bismuth phosphate waste, and zirconium and uranium left from the fuel decladding. This work will be essential to developing a disposition path for retrieval solutions from bismuth phosphate wastes. This effort would also support sludge washing to further reduce phosphate concentration if that process were to be added back to the flowsheet in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium In Situ Electrolytic Deposition with a Reusable Functional Graphene-Foam Electrode

Nuclear fission produces 400 GWe which represents 11% of the global electricity output. Uranium is the essential element as both fission fuel and radioactive waste. Therefore, the recovery of uranium is of great importance. In this study, an in situ electrolytic deposition method to extract uranium from aqueous solution is reported. A functionalized reduced graphene oxide foam (3D-FrGOF) is used as the working electrode, which acts as both a hydrogen evolution reaction catalyst and a uranium deposition substrate. The specific electrolytic deposition capacity for U(VI) ions with the 3D-FrGOF is 4560 mg g –1 without reaching saturation, and the Coulombic efficiency can reach 54%. Moreover, reduction of the uranium concentration in spiked seawater from 3 ppm to 19.9 ppb is achieved, which is lower than the US Environmental Protection Agency uranium limits for drinking water (30 ppb). Furthermore, the collection electrode can be efficiently regenerated and recycled at least nine times without much efficiency fading, by ejecting into 2000 ppm concentrated uranium solution in a second bath with reverse voltage bias. All these findings open new opportunities in using free-standing 3D-FrGOF electrode as an advanced separation technique for water treatment.

36 MATERIALS SCIENCE↗

Automated Particle Analysis of Hanford Tank Wastes 241-AN-106, 241-AN-101, and 241-AW-105

This effort is involved in developing particle size and density distribution (PSDD) for the major phases within Hanford tank waste sludge. The object of this work has been to use automated particle analysis (APA) methods on the Scanning Electron Microscope (SEM) to provide PSDDs. The PSDD can be used to quantify the proportion of gibbsite particles likely to settle quickly and enable blending of wastes that may be prone to pipeline plugging such as the uranium phase, clarkeite with other wastes. The Hanford tank waste solids were analyzed with SEM combined with x-ray Energy Dispersive Spectroscopy (EDS) using APA. This method can allow thousands of individual particles to be characterized and so may provide a more representative view of the samples and information PSDDs. We characterized several as-received sludge samples and developed PSDD with APA. Sample preparation methods were found to impact the collected results, as it was more difficult to collect representative samples of the larger particles. Much of the material was also dried and cemented together that further impacted results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Neutronic analysis of a PWR-type SMR core using duplex ThO{sub 2}-UO{sub 2} in TRISO fuel particles

Currently, studies on small modular reactors (SMRs) present an important development due to the potential they represent in terms of safety, operational flexibility, economy, and non-energy applications. Furthermore, there is increasing interest in studying the use of thorium as fuel, as an effective way to solve problems such as the shortage of uranium reserves, reduction of nuclear waste and nuclear proliferation. Also, the use of thorium combined with highly enriched uranium TRISO particles has been studied, showing proper performance. In this work, the concept of ThO{sub 2}-UO{sub 2} duplex fuel is used, for the core configuration of a PWR type SMR that uses TRISO fuel, designed to achieve extended fuel cycles. Three distribution cases of ThO{sub 2} and UO{sub 2} in TRISO particles inside the fuel rods are compared. First, particles composed by a homogeneous mixture of ThO{sub 2} and UO{sub 2} are distributed inside of fuel elements. Second, the fuel zone of the fuel elements is divided into two radially, an internal one where the TRISO particles composed of ThO{sub 2} are distributed and the external one where the TRISO particles composed of UO{sub 2} are distributed. The third case is like the previous one, except that the particles that contain UO{sub 2} are distributed in the inner zone and those that contain ThO{sub 2} in the outer zone of the fuel elements. The comparison of the cases is carried out in terms of cycle main isotopes' mass transmutation, power distribution and temperature reactivity coefficients. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Panel Session 116: Waste Management from Remediation of Legacy Sites or Unplanned Releases

Past experiences have shown that there is often a disconnect between Indigenous societies and Western society. This disconnect can be attributed to different value systems between these two group and is not limited to the USA and Canada but also extends into Australia, New Zealand, and the Central Asia Republics (the 'five Stans'). The intent of this Panel Session to give voice to representatives from Indigenous communities, the challenges presented in remediation processes, and potential solutions. Standard risk assessment assumptions developed for Western societies often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. This panel focused on the perspectives of Indigenous societies (e.g., Indian Tribes (US), First Nations (Canada)) related to risk assessment of environmental remediation challenges, including deep geological disposal of HLW and ILW, near-surface disposal of LLW and in-situ entombment of nuclear reactor components, and environmental remediation of abandoned uranium mines and historic wastes. Standard risk assessment assumptions often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. Factoring those into a risk assessment that still meets regulatory requirements and policies such as reasonably anticipated land use at US EPA CERCLA sites can be challenging but has the potential to lead to a site or facility approach that is more accepted. Panelists with presentations: The U.S. Nuclear Regulatory Commission Regulatory Process - A Path for Indigenous Knowledge? (Francis Cameron); Local Community Perceptions and Remediation Projects (Michelle Roberts); Indigenous Perspectives on Risk Assessment (Bob Watts); Navajo Superfund Program: Fundamental Law and Traditional Ecological Knowledge (Dariel Yazzie); Risk Assessment: Two Indigenous Approaches (Whitney Fraser)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and resource development needs to support a significant expansion of US nuclear capacity

In December 2023, the United States pledged at a United Nations conference to triple nuclear energy by 2050. In May of 2025 a new administration announced plans to quadruple nuclear energy by 2025, setting a new target that requires understanding the key infrastructure and resources needed to achieve large-scale deployment. This study attempts to quantify “what it takes” to deploy an additional 200 GWe of nuclear capacity. It projects demand levels for workforce, fuel, uranium mining and enrichment, waste management, supply chain, land, licensing, and water. Demand growth is also contextualized. For example, the peak number of construction workers required is approximately 215,000, a 37 % increase in the current US utility construction workforce. Up to 80,000 MT/year of mined uranium will be needed, necessitating a 60-fold increase in US mining production or a doubling of global mining if sourced externally. Advanced reactor fuels, uranium mining, and nuclear-grade equipment production would need substantial expansion. Operational workforce, enrichment needs, and licensing submissions also face significant increases. Although water consumption may see relatively lower increases, securing water rights poses unique challenges. This study consolidates various demand metrics in a broad context, highlighting the necessity of early preparations, such as workforce training, to support a tripling of nuclear energy. While it outlines the demand-side requirements, it does not assess the difficulties of ramping up or other supply-side issues. The findings also shed light on the impact of reactor size and reactor technology on various demand metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synthesis and Characterization of Silicon Carbide Ceramic Composites with CeO 2 Powder

This study pioneers the fabrication and characterization of silicon carbide (SiC) containing cerium dioxide (CeO 2 ). CeO 2 powder was tested as a surrogate for actinide oxide waste forms such as uranium dioxide (UO 2 ) and plutonium dioxide (PuO 2 ). Several syntheses were evaluated with varying amounts of preceramic polymer (SMP-10 resin) and CeO 2 containing either SiC fiber, carbon fiber, or no fibers. Scanning electron microscopy (SEM) was used to characterize morphology and compositional differences, and energy-dispersive x-ray spectroscopy (EDS) was used to provide semiquantitative elemental analysis. In addition, each sample was characterized by density, powder x-ray diffraction (pXRD), and Raman spectroscopy. Samples containing nearly more than four times CeO 2 powder than SMP-10 resin by mass had the best properties. This research establishes a unique synthesis for SiC containing high concentrations of CeO 2 powder to illustrate how it may be managed as a potential waste form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗