Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uncertainty management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Managing Uncertainty in Preliminary Aeroshell Design Analysis

An analysis tool to aid in preliminary design of re-entry aeroshells for interplanetary exploration is presented. The computational tool addresses a common feature of design analysis, the need to make use of results from several analysis regimes and from several sources.

Design Methods and Models Design Representations C↗

Adaptive Computing for Scale-Up Problems

Adaptive Computing is an application-agnostic outer loop framework to strategically deploy simulations and experiments to guide decision making for scale-up analysis. Resources are allocated over successive batches, which makes the allocation adaptive to some objective such as optimization or model training. The framework enables the characterization and management of uncertainties associated with predictive models of complex systems when scale-up questions lead to significant model extrapolation. A key advancement of this framework is its integration of multi-fidelity surrogate modeling, uncertainty management, and automated orchestration of various computing and experimentation resources into a single integrated software package. This enables efficient multi-fidelity modeling across multiple computing resources by incorporating real-world constraints such as relative queue times and throughput on individual machines into the multi-fidelity sampling decision. We discuss applications of this framework to problems in the renewable energy space, including biofuels production, material synthesis, perovskite crystal growth, and building electrical loads.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modular supply chain optimization considering demand uncertainty to manage risk

Supply chain under demand uncertainty has been a challenging problem due to increased competition and market volatility in modern markets. Flexibility in planning decisions makes modular manufacturing a promising way to address this problem. We report the problem of multiperiod process and supply chain network design is considered under demand uncertainty. A mixed integer two-stage stochastic programming problem is formulated with integer variables indicating the process design and continuous variables to represent the material flow in the supply chain. The problem is solved using a rolling horizon approach. Benders decomposition is used to reduce the computational complexity of the optimization problem. To promote risk-averse decisions, a downside risk measure is incorporated in the model. The results demonstrate the several advantages of modular designs in meeting product demands. A pareto-optimal curve for minimizing the objectives of expected cost and downside risk is obtained.

42 ENGINEERING↗

An interval-parameter stochastic robust optimization model for supporting municipal solid waste management under uncertainty

A stochastic robust interval linear programming model (IPRO) was developed for supporting municipal solid waste management under uncertainty. The model improves upon the existing stochastic robust optimization (SRO) and interval linear programming (ILP) methods by allowing evaluations of trade-offs among expected costs, cost variability, and risk of violating relax constraints simultaneously, as well as reflections of complex uncertainties through both interval and stochastic theories. A long-term waste management problem was used to demonstrate the applicability of IPRO model. The results indicated that IPRO normally led to interval solutions, where waste-management alternatives could be generated by adjusting the decision-variable values within their intervals. The model could also help waste managers to identify desired policies that under various environmental, economic, system-feasibility and system-reliability constraints.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Implications of Simulation Conceptual Model Development for Simulation Management and Uncertainty Assessment

A simulation conceptual model is a simulation developers way of translating modeling requirements (i. e., what is to be represented by the simulation or its modification) into a detailed design framework (i. e., how it is to be done), from which the software, hardware, networks (in the case of distributed simulation), and systems/equipment that will make up the simulation can be built or modified. A conceptual model is the collection of information which describes a simulation developers concept about the simulation and its pieces. That information consists of assumptions, algorithms, characteristics, relationships, and data. Taken together, these describe how the simulation developer understands what is to be represented by the simulation (entities, actions, tasks, processes, interactions, etc.) and how that representation will satisfy the requirements to which the simulation responds. Thus the conceptual model is the basis for judgment about simulation fidelity and validity for any condition that is not specifically tested. The more perspicuous and precise the conceptual model, the more likely it is that the simulation development will both fully satisfy requirements and allow demonstration that the requirements are satisfied (i. e., validation). Methods used in simulation conceptual model development have significant implications for simulation management and for assessment of simulation uncertainty. This paper suggests how to develop and document a simulation conceptual model so that the simulation fidelity and validity can be most effectively determined. These ideas for conceptual model development apply to all simulation varieties. The paper relates these ideas to uncertainty assessments as they relate to simulation fidelity and validity. The paper also explores implications for simulation management from conceptual model development methods, especially relative to reuse of simulation components.

Pace, Dale K.↗

Dynamic Adjustment of Simulation Parameters for Efficient Vehicle Prognostics

Model-based diagnostics and prognostics rely on state estimation and uncertainty management algorithms to produce useful information for system operators and maintainers. This information enables more informed operational decisions, condition-based maintenance, and overall mission safety assurance. Typically, uncertainty is associated with vehicle state-of-health estimation and prediction results because of modeling errors, internal or external sources of noise, and sensor inaccuracy. Probabilistic uncertainty management methods including Sequential Monte Carlo simulation are commonly used to reason about state-of-health estimates and predictions in the presence of these sources of uncertainty. However, such algorithms can be computationally expensive as they require a very large number of samples to obtain a sufficiently accurate quantification of the end of life probability distribution. As a result, highly mobile autonomous systems that leverage the prognostic results for mission-level replanning are often constrained in their processing capability because of these computationally expensive simulation approaches. Therefore, in this paper, we investigate algorithmic methods for dynamically adjusting simulation time step as well as number of samples to achieve highly efficient prognostic results while maintaining results accuracy. Results obtained from simulated flight experiments of an electric unmanned aerial vehicle are presented to verify the efficacy of such algorithms.

Prognostics↗

Coping with uncertainty in environmental impact assessments: Open techniques

Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take place within an EIA setting. More specifically, we have identified uncertainties involved in each decision-making step and discussed the extent to which these can be treated and managed in the context of an activity or project that may have environmental impacts. To further demonstrate the relevance of the techniques identified, we have examined the extent to which the EIA guidelines currently used in Colombia consider and provide guidance on managing the uncertainty involved in these assessments. Some points that should be considered in order to provide greater robustness in impact assessments in Colombia have been identified. These include the management of stakeholder values, the systematic generation of project options, and their associated impacts as well as the associated management actions, and the evaluation of uncertainties and assumptions. We believe that the relevant and specific techniques reported here can be a reference for future evaluations of other EIA guidelines in different countries. - Highlights: • uncertainty is unavoidable in environmental impact assessments, EIAs; • we have identified some open techniques to EIAs for treating and managing uncertainty in these assessments; • points for improvement that should be considered in order to provide greater robustness in EIAs in Colombia have been identified; • the paper provides substantiated a reference for possible examinations of EIAs guidelines in other countries.

54 ENVIRONMENTAL SCIENCES↗

Health Management and Prognostics for Electric Aircraft Powertrain

W and c Any air borne vehicle needs incorporating safety as key parameter of measure, and inclusion of autonomy raises the critical need for safety under autonomous operations. Management of faults and component degradation is key as complexity in autonomous operations grow over the period of time. Therefore, in addition to basic operational requirements, an autonomous electric vehicle should be able to make accurate estimates of its current system health and take the correct decisions to complete its mission successfully. Real-time safety and state-awareness tools are therefore essential for the vehicle to be able to reach its destination in a safe and successful manner. The need for safety assurance and health management capabilities is particularly relevant for aircraft electric propulsion systems, which are relatively new and with limited historical to learn. They are critical systems requiring high power density along with reliability, resilience, efficient management of weight, and operational costs. A model- based fault diagnosis and prognostics approach of complex critical systems can successfully accomplish the safety and state awareness goal for such electric propulsion systems, enabling autonomous decision making capability for safe and efficient operation. To identify critical components in the system a Qualitative Bayesian approach using FMECA is implemented. This requires the assessment of some quantities representing the state of the electric unmanned aerial systems (e-UAS), as well as look-ahead forecasts of such states during the entire flight, presented in form of safety metrics (SM). In-service data and performance data gathered from degraded components sup- ports diagnostic and prognostic methods for these systems, but this data can be difficult to obtain as weight and packaging restrictions reduce redundancy and instrumentation on-board the vehicle. Therefore, an model-based framework should be capable or operating with limited data. In addition to data scarcity, the variability of such complex critical systems re- quires the model-based framework to reason in the presence of uncertainty, such as sensor noise, and modeling imperfections. Quantification of errors and uncertainties in the measured states and quantities is therefore a fundamental step for a precise estimation of such SMs; un-modeled uncertainty may result in erroneous state assessment and un- reliable predictions of future states of e-UAVs. Typical, centralized model-based schemes suffer from inherent disadvantages such as computational complexity, single point of failure, and scalability issues, and therefore may fail in such a complex scenario. This paper presents a methodology for developing a system level diagnostics and prognostics approach using a Qualitative Bayesian FMECA approach along with a formal uncertainty management framework for an e-UAS. In this work we demonstrate the efficacy of the framework to predict effects of sub-system level degradation on vehicle operation incorporating uncertainty management to predict future behavior under different operating conditions.

Kulkarni, Chetan↗

Towards a Decision Support System for Space Flight Operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The discrepancy of the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the three increments of this vision. These increments include (1) hardware and software system components and interfaces with the NASA ground system, (2) uncertainty management and (3) re-planning and automated execution. Each of these increments provide value independently; but some may also enable building of a subsequent increment.

Meshkat, Leila↗

Towards a decision support system for space flight operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The differences between the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the four increments of this vision. These increments include (1) the existing capabilities (2) hardware and software system components and interfaces with the NASA ground system, (3) uncertainty management and (4) re-planning and automated execution. Each of these increments provides value independently; but some may also enable building of a subsequent increment.

Ruszkowski, James↗

APIS: Honeybee Foraging Task Assignment for Use in Uncertain and Unreliable Environments

Multiagent Cyber-Physical-Human (CPH) systems in realistic environments operate under uncertain conditions. Communication among agents, aimed at reducing the uncertainty, is itself subject to uncertainty. We propose to manage uncertainties in autonomous, long-duration operations of multiagent systems via a modified Honeybee Foraging (HBF) behavioral scheme. The resulting system, Autonomous Persistent Intelligent Swarm (APIS),incorporates two new behaviors to ameliorate informational uncertainty. When “scouting”, agents are tasked based on informational quality and reliability rather than solely on priorities. When “dancing”, agents are tasked to rendezvous with other dancing agents to exchange information at close range, where successful communication is guaranteed. When coupled with uncertainty-aware modeling across agents, these behaviors improve situational awareness and resilience of the system, enabling it to function under more uncertain conditions arising during long-duration missions.

Autonomous systems↗