Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “US SUPERFUND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

JV Task 92 - Alcoa/Retec SFE and SPME

This report summarizes the work performed by the Energy & Environmental Research Center (EERC) under the U.S. Department of Energy Jointly Sponsored Research Program JV Task 92, which is a continuation of JV9. Successful studies performed in 1999 through the end of 2008 demonstrated the potential for using selective supercritical fluid extraction (SFE) and a solid-phase microextraction (SPME) method for measuring sediment pore water polycyclic aromatic hydrocarbons (PAHs) to mimic the bioavailability of PAHs from manufactured gas plant and aluminum smelter soils and sediments both in freshwater and saltwater locations. The studies that the EERC has performed with the commercial partners have continued to generate increased interest in both the regulatory communities and in the industries that have historically produced or utilized coal tar products. Both ASTM International and the U.S. Environmental Protection Agency (EPA) have accepted the pore water method developed at the EERC as standard methods. The studies have demonstrated the effectiveness of our techniques in predicting bioavailability of PAHs from ca. 250 impacted and background field sediments and soils. The field demonstrations from the final years of the project continued to build the foundation data for acceptance of our methods by the regulatory communities. The JV92 studies provide the single largest database in the world that includes measures of PAH bioavailability along with biological end points. These studies clearly demonstrated that present regulatory paradigms based on equilibrium partitioning greatly overpredict bioavailability. These investigations also laid the foundation for present (non-JV) studies being applied to PAHs and polychlorinated biphenyls (PCBs) at EPA Superfund sites, investigations into PAH and PCB bioavailability at U.S Department of Defense sites, and the application of the techniques to investigating the bioavailability of chlorinated dioxins and furans from impacted sediments.

01 COAL, LIGNITE, AND PEAT↗

Using Superfund Guidance and Tools for the Remediation of Uranium Mine sites - 19056

The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) has primary responsibility for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup of contaminated sites: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund.' The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on the guidance and tools for addressing radioactively contaminated sites by the Superfund program that are most important when remediating uranium mine sites. This presentation will also discuss some of the key features of these tools that may have more utility at a uranium mine site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations and Recent Upgrades to a Tritium Recycling Facility - 20375

Nuclear Sources and Services Inc. (NSSI) is a waste handling treatment company that has been operating since 1971. In 2000, NSSI began building a 1,000 m{sup 2} (∼10,000 sqft) tritium recycling facility on the Houston, Texas premises to address a growing need in the waste disposal market. Over the years, the capability of the facility grew to address many different waste streams with the goal of recycling > 99.9% of all tritium activity back into the fusion community. This is achieved by maintaining an effluent stack release well below the 150 GBq/year (C Ci/year) operating limit and maintaining all liquid and solid waste disposal below the low-level radioactive release limit of 0.C MBq/kg (10 μCi/kg). The unique processing systems in the facility attracts many challenging contracts. Within the past two years, NSSI has engaged with customers to treat; organic mixed wastes that simultaneously contain tritium and carbon-14, safely extract tritium from large quantities of exit sign lights, and remove tritium from uncharacterised legacy depleted uranium beds from a superfund site. This paper will outline the initial testing, the system upgrades to treat these varied streams, and the progress in processing the feedstocks provided by these projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 80: Interagency Community of Practice in Risk and Performance Assessment

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provided feedback on building the P and RA COP to support risk-informed environmental decision making. Panelists with presentations: Understanding Mechanisms to Manage Uncertainty and Risk in Waste Containment Systems (Craig Benson, University of Virginia - CRESP (USA) Scaling for Performance Assessments (Paul Black, Katie Catlett, Doug Anderson, Paul Duffy, Tom Stockton, Sam Van Sickle, John Carson); Interagency Community of Practice in Rick and Performance Assessment (Horst Monken Fernandes); Institutional Controls as a Risk Management Tool (David Esh); Superfund: Explanation of Screening and PRG's for Risk and Dose Assessment (Stuart Walker)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Monitoring Plan (Revision 6)

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

54 ENVIRONMENTAL SCIENCES↗

Model for Correlating Real-Time Survey Results to Contaminant Concentrations - 12183

The U.S. Environmental Protection Agency (EPA) Superfund program is developing a new Counts Per Minute (CPM) calculator to correlate real-time survey results, which are often expressed as counts per minute, to contaminant concentrations that are more typically provided in risk assessments or for cleanup levels, usually expressed in pCi/g or pCi/m{sup 2}. Currently there is no EPA guidance for Superfund sites on correlating count per minute field survey readings back to risk, dose, or other ARAR based concentrations. The CPM calculator is a web-based model that estimates a gamma detector response for a given level of contamination. The intent of the CPM calculator is to facilitate more real-time measurements within a Superfund response framework. The draft of the CPM calculator is still undergoing internal EPA review. This will be followed by external peer review. It is expected that the CPM calculator will at least be in peer review by the time of WM2012 and possibly finalized at that time. The CPM calculator should facilitate greater use of real-time measurement at Superfund sites. The CPM calculator may also standardize the process of converting lab data to real time measurements. It will thus lessen the amount of lab sampling that is needed for site characterization and confirmation surveys, but it will not remove the need for sampling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

This letter corrects factual errors and omissions in Ellen K. Silbergeld's commentary on ''Managing hazards in place: The risks of residual risk''

Highlights: • The Bunker Hill Superfund Site has a long history of managing lead wastes on site. • We rely on comprehensive Institutional Controls Program to:• educate and train the community to limit their exposure. • monitor and maintain infrastructure and physical barriers to exposure. • monitor pediatric blood lead levels. • monitor interior house dust lead levels. • We share information widely via the:• internet • scientific journals • books • newsletters • reports • facebook • youtube.

54 ENVIRONMENTAL SCIENCES↗

Improved hydrogeophysical characterization and monitoring through parallel modeling and inversion of time-domain resistivity and induced-polarization data

Electrical geophysical methods have found wide use in the growing discipline of hydrogeophysics, both for characterizing the electrical properties of the subsurface, and for monitoring subsurface processes in terms of the spatiotemporal changes in subsurface conductivity, chargeability, and source currents they govern. Current multichannel and multielectrode data collections systems are able to collect large amounts of data in relatively short periods of time. However, practitioners are often unable to fully utilize these large data sets and the information they contain due to the processing limitations of standard desktop computers. This limitation can be addressed by utilizing the storage and processing capabilities of high-performance parallel computing environments. We present a parallel distributed-memory forward and inverse modeling algorithm for analyzing resistivity and time-domain induced polarization data. The primary components of the parallel computations include distributed computation of the pole solutions in forward mode, distributed storage and computation of the Jacobian matrix in inverse mode, and parallel execution of the inverse equation solver. We demonstrate the corresponding parallel code for three efforts: (1) resistivity characterization of the Hanford 300 Area Integrated Field Research Challenge site in Hanford, WA; (2) resistivity characterization of a volcanic island in the southern Tyrrhenian Sea in Italy; and (3) resistivity and IP monitoring of biostimulation at a superfund site in Brandywine, MD. Inverse analysis of each of these data sets would be limited (or impossible) in a standard serial computing environment which underscores the need for high-performance computing to fully utilize the potential of electrical geophysical methods in hydrogeophysical applications.

58 GEOSCIENCES↗

Environmental Monitoring Plan, Revision 5

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

54 ENVIRONMENTAL SCIENCES↗

DOE Climate Change Vulnerability and Adaptation Planning: Three Relevant Case Studies - 16056

Executive Order 13653, Preparing the United States for the Impacts of Climate Change, was issued in 2013. The President emphasized the importance for federal agencies to take action to enhance climate preparedness and resilience. The U.S. Department of Energy released the DOE Climate Change Adaptation Plan in 2014 to build resilience and mitigation across the Department, and to assure inclusion of climate change adaptation as part of its planning and operations. DOE's Office of Environmental Management has an important mission to manage safe cleanup of environmental legacy contamination brought about from five decades of nuclear weapons development and government sponsored nuclear energy research. Specifically, Environmental Management is responsible for remediation of soil and groundwater, deactivation and decommissioning of facilities, and disposal of hazardous and radioactive waste. Three case studies are discussed in this paper that demonstrate the cost benefit and importance for Environmental Management to assess climate change vulnerability and implement planning procedures: 1. Los Alamos National Laboratory in New Mexico has experienced $0.5 billion in unanticipated costs as a result of climate-related events including: extreme drought, wildfires, deluge rains, and historic flooding over the past 15 years. 2. The U.S. Environmental Protection Agency American Cyanamid Superfund Site, situated on the New Jersey coast was hit by Hurricane Irene in 2011. Three major contaminated, solvent impoundment berms were breached within the 100-year flood plain, causing major damage to the facility. 3. For radioactive waste disposal facilities in low-lying areas in proximity to groundwater, climate change vulnerability and assessment is prudent for operational management. One such Superfund hazardous and radioactive waste disposal facility, the Environmental Management Waste Management Facility located at the DOE Oak Ridge Reservation in Tennessee, has documented surface and ground water management challenges since construction began in 2001, driven by changing regional weather patterns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spatial and temporal variation of freely dissolved polycyclic aromatic hydrocarbons in an urban river undergoing Superfund remediation

Urban rivers with a history of industrial use can exhibit spatial and temporal variations in contaminant concentrations that may significantly affect risk evaluations and even the assessment of remediation efforts. Concentrations of 15 biologically available priority pollutant polycyclic aromatic hydrocarbons (PAHs) were measured over five years along 18.5 miles of the lower Willamette River using passive sampling devices and HPLC. The study area includes the Portland Harbor Superfund megasite with several PAH sources including remediation operations for coal tar at RM 6.3 west and an additional Superfund site, McCormick and Baxter, at RM 7 east consisting largely of creosote contamination. Study results show that organoclay capping at the McCormick and Baxter Superfund Site reduced PAHs from a precap average of 440 {+-} 422 ng/L to 8 {+-} 3 ng/L postcapping. Results also reveal that dredging of submerged coal tar nearly tripled nearby freely dissolved PAH concentrations. For apportioning sources, fluoranthene/pyrene and phenanthrene/anthracene diagnostic ratios from passive sampling devices were established for creosote and coal tar contamination and compared to published sediment values. 29 refs., 3 figs., 3 tabs.

01 COAL, LIGNITE, AND PEAT↗

Radon Considerations at Environmental Remediation Sites - 19469

Radon and how it is regulated poses many challenges to the U.S. Army Corps of Engineers (USACE) in executing the Formerly Utilized Sites Remedial Action Program (FUSRAP). These challenges include:, terminology; radon measurement methods and limitations; state certification and testing requirements; limited and potentially conflicting federal guidance; background considerations; and limited experience regarding application of guidance; among others. These challenges and others are discussed in detail. The FUSRAP Maywood Superfund Site (FMSS) is presented as a case study demonstrating these challenges and considerations to mitigate or address the challenges. The USACE, U.S. Environmental Protection Agency (USEPA), and the New Jersey Department of Environmental Protection (NJDEP) (NJDEP) have spent several years working on and continue to work through the radon issues at FMSS. The FMSS experience, information, and solutions presented in this paper will be helpful to other environmental sites with radium and thorium contamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Superfund Update: Revisions to Risk and Dose Assessment Tools - 17302

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in. A set of further revisions are expected to be finalized prior to December 2016 and will be discussed in this abstract. There are several additional revisions that may be finished prior to WM 2017 and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GROUNDWATER MONITORING REPORT GENERATION TOOLS - 12005

Compliance with National and State environmental regulations (e.g. Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) aka SuperFund) requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include maps, data tables, charts and statistics. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. These process improvements enhanced quality and consistency by centralizing the information, and have reduced manpower and production time through automated efficiencies.

54 ENVIRONMENTAL SCIENCES↗

Evolving Adjustments to External (Gamma) Slope Factors for CERCLA Risk and Dose Assessments: The MCNP Years - 16307

To model the external exposure pathway in risk and dose assessments of radioactive contamination at Superfund sites, the U.S. Environmental Protection Agency (EPA) uses slope factors (SFs), also known as risk coefficients, and dose conversion factors (DCFs). Without any adjustment these external radiation exposure pathways effectively assumes that an individual is exposed to a source geometry that is effectively an infinite slab. The concept of an 'infinite slab' means that the thickness of the contaminated zone and its aerial extent are so large that it behaves as if it were infinite in its physical dimensions. EPA has been making increasingly complex adjustments to account for the extent of the contamination and its corresponding radiation field to provide more accurate risk and dose assessment modeling when using its calculators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical Weathering Increases Lead Bioaccessibility in Semi-Arid Mine Tailings

Mine tailings can host elevated concentrations of toxic metal(loid)s that represent a significant hazard to surrounding communities and ecosystems. Eolian transport, capable of translocating small (micrometer-sized) particles, can be the dominant mechanism of toxic metal dispersion in arid or semiarid landscapes. Human exposure to metals can then occur via direct inhalation or ingestion of particulates. The fact that measured doses of total lead (Pb) in geomedia correlate poorly with blood Pb levels highlights a need to better resolve the precise distribution of molecularly speciated metal-bearing phases in the complex particle mixtures. Species distribution controls bioaccessibility, thereby directly impacting health risk. This study seeks to correlate Pb-containing particle size and mineral composition with lability and bioaccessibility in mine tailings subjected to weathering in a semiarid environment. We employed X-ray absorption spectroscopy (XAS) and X-ray fluorescence (XRF), coupled with sequential chemical extractions, to study Pb speciation in tailings from the semiarid Arizona Klondyke State Superfund Site. Representative samples ranging in pH from 2.6 to 5.4 were selected for in-depth study of Pb solid-phase speciation. The principle lead-bearing phase was plumbojarosite (PbFe{sub 6}(SO{sub 4}){sub 4}(OH){sub 12}), but anglesite (PbSO{sub 4}) and iron oxide-sorbed Pb were also observed. Anglesite, the most bioavailable mineral species of lead identified in this study, was enriched in surficial tailings samples, where Pb concentrations in the clay size fraction were 2-3 times higher by mass relative to bulk. A mobile and bioaccessible Pb phase accumulates in surficial tailings, with a corresponding increase in risk of human exposure to atmospheric particles.

54 ENVIRONMENTAL SCIENCES↗

Bunker Hill Sediment Characterization Study

The long history of mineral extraction in the Coeur d’Alene Basin has left a legacy of heavy metal laden mine tailings that have accumulated along the Coeur d’Alene River and its tributaries (U.S. Environmental Protection Agency, 2001; Barton, 2002). Silver, lead and zinc were the primary metals of economic interest in the area, but the ores contained other elements that have become environmental hazards including zinc, cadmium, lead, arsenic, nickel, and copper. The metals have contaminated the water and sediments of Lake Coeur d’Alene, and continue to be transported downstream to Spokane Washington via the Spokane River. In 1983, the EPA listed the Bunker Hill Mining and Metallurgical Complex on the National Priorities List. Since that time, many of the most contaminated areas have been stabilized or isolated, however metal contaminants continue to migrate through the basin. Designation as a Superfund site causes significant problems for the economically depressed communities in the area. Identification of primary sources of contamination can help set priorities for cleanup and cleanup options, which can include source removal, water treatment or no action depending on knowledge about the mobility of contaminants relative to water flow. The mobility of contaminant mobility under natural or engineered conditions depends on multiple factors including the physical and chemical state (or speciation) of metals and the range of processes, some of which can be seasonal, that cause mobilization of metals. As a result, it is particularly important to understand metal speciation (National Research Council, 2005) and the link between speciation and the rates of metal migration and the impact of natural or engineered variations in flow, biological activity or water chemistry.

54 ENVIRONMENTAL SCIENCES↗

Naval Station Newport Wind Resource Assessment

The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy (RE) on potentially contaminated land and mine sites. EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island where multiple contaminated areas pose a threat to human health and the environment. Designated a superfund site on the National Priorities List in 1989, the base is committed to working toward reducing the its dependency on fossil fuels, decreasing its carbon footprint, and implementing RE projects where feasible. The Naval Facilities Engineering Service Center (NFESC) partnered with NREL in February 2009 to investigate the potential for wind energy generation at a number of Naval and Marine bases on the East Coast. NAVSTA Newport was one of several bases chosen for a detailed, site-specific wind resource investigation. NAVSTA Newport, in conjunction with NREL and NFESC, has been actively engaged in assessing the wind resource through several ongoing efforts. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and a survey of potential wind turbine options based upon the site-specific wind resource.

14 SOLAR ENERGY↗