Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UNDERGROUND DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Panel Session 62: Progress on Deep Repository Programs Around the World

This panel session focused on the progress of deep repository programs, worldwide. While efforts on a deep geological repository for SNF/UNF and HLW in the USA were terminated in 2010, several other repository programs continue to make considerable progress and deserve to be recognized. Panelists were invited from national, multi-national, and international repository programs and organizations to report upon the status and future as well as the perceived reasons underlying the success and the failure of components of their respective repository program. This panel provided a forum for interested parties to present, exchange, and take advantage of, as appropriate, repository progress, challenges, concepts/designs and other lessons learned around the world, including site characterization, site selection, research and development, licensing, construction, operation, and public acceptance and participation. Presentations proposed include: 1 - Cigeo (French Deep Geological Repository Project) update 2018 (Daniel Delort, Andra (France)); 2 - Progress on Deep Geological Repository Programs Around the World (Bruce McKirdy, Radioactive Waste Management (United Kingdom)); 3 - Geological disposal facility in Belgium (Didier Leonard, ONDRAF/NIRAS (Belgium))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study of a Monitoring Program for Intermediate Depth Disposal of Low- Level Radioactive Waste - 20167

This study investigated a monitoring program for intermediate depth disposal of low-level radioactive waste. At first, it extracted monitoring targets, such as the status of cracks in the low diffusion layer after closure of the facility. Secondly, it focused on distributed optical fiber sensors which can minimize the amount of cable, and measurement positions and methods were specifically determined to propose the monitoring method. Finally, conformity to regulatory requirements was verified to clarify key points and issues to be addressed in performing monitoring. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scoping Thermal Response Calculations of RNS Waste During Transport to and Disposal at the WIPP

Sandia National Laboratories (SNL) was contracted by the United States Department of Energy Environmental Management (DOE-EM), Los Alamos Field Office to perform mechanical and thermal scoping calculations as part of a study seeking to understand the ignitability risk of the Remediated Nitrate Salts (RNS) waste drums during transportation from the Waste Control Specialists (WCS) facility to Waste Isolation Pilot Plant (WIPP) and permanent disposal of the waste at WIPP. The scoping thermal simulations described in this report pertain to thermal calculations performed with a packaging system consisting of one Standard Waste Box (SWB) loaded with drums placed inside a Standard Large Box 2 (SLB2). During transportation, the SLB2 is inside Transuranic Package Transporter Model III (TRUPACT-III), which provides the third layer of the packaging. Once at the WIPP, it is assumed the SLB2 is extracted from the TRUPACT-III and maintained above ground, and then subsequently placed underground for permanent disposal. In these proposed configurations, the space between the SLB2 and the SWB is always filled by a layer of insulation consisting of air-filled glass microbubbles except for the bottom which rests directly on the SLB2. The thermal scoping calculations described in this report specifically address whether the introduction of external heat inputs, combined with the contributions from the internally generated radiolytic decay heat and chemical reactions, lead to an unstable thermal state during the time of its movement and placement in the permanent disposal location. The external heat inputs are of two forms: 1) ambient thermal irradiation (e.g., solar and ambient storage/disposal temperatures) and 2) accident-induced fire. Three scoping calculation scenarios were derived as representative, conservative scenarios: 1A) TRUPACT-III transient transportation, 1B) SLB2 48-hour outdoor storage with solar radiation, and 2) fully-engulfing fire during SLB2 handling or emplacement following a steady-state analysis in a 38 °C environment. All the simulated scenarios are conservative relative to the operational conditions expected for handling the waste package during transportation and placement in the WIPP underground disposal unit. The predictions obtained from simulating the three exposure scenarios revealed that adding the SLB2 and the air-filled glass microbubbles to the transport and storage/disposal configurations provides additional thermal protection of the drums beyond what the SWB provides alone, both during long-term above ground insolation and underground during a fire accident. Under the current transportation/storage/disposal concepts, the degree of protection provided by the packaging concept is sufficient to prevent the waste from being ignitable. The simulation results demonstrate that there is adequate margin to safely transport and place the RNS waste from WCS to the WIPP under the current operational concept.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Waste Inventory for Probabilistic Performance Assessment Modeling - 19361

Estimation of radioactive waste inventory is a key initial step in the development of an environmental fate and transport model for performance assessment (PA) of radioactive waste sites. PA model output is often sensitive to parameters that represent inventory as a source term, yet estimation is a difficult problem. Inventory estimation for a probabilistic performance assessment (PPA) is related to, but distinct from, that performed for waste excavation, characterization, and offsite disposal. The latter appropriately focuses on obtaining the most detailed information possible on specific hazards and locations; however, these questions cannot be fully answered without intrusive site characterization efforts. This type of characterization is often not feasible when assembling information regarding a source term in a PPA model. Development of waste inventory for a PPA is one piece of a larger hierarchical model. The physical process model represented by Goldsim computer code represents one level of the hierarchy, and the second level of the hierarchy involves estimation of inputs such as inventory, transport, and risk parameters. The estimation of inputs is not a straightforward problem. The parameters of a computer model often do not have an equivalence to the physical quantities they describe, and estimation of the physical quantities themselves can be difficult due to limitations of available information. Inventory information for the West Valley Site in upstate New York is based on data from historical shipping and disposal forms. In the 1990's, the West Valley Demonstration Project (WVDP) compiled information from existing databases and historical waste records into one complete modern database. A conceptual model was then applied and used with recorded information to characterize the waste mass and radionuclide composition for each waste burial. Information was ultimately aggregated over all waste records to estimate the mass of each radionuclide within each trench, hole, or caisson. Three decades later, we revisit the master database, make updates with newly-identified information, and incorporate the conceptual model previously used for inventory estimation in the hierarchical modeling framework. We characterize uncertainty using probability distributions for waste mass and radionuclide composition at the individual shipment or individual burial level. Uncertainty incorporated at the lowest level of the hierarchy is ultimately carried through to uncertainty in PPA model endpoints. Sensitivity analysis of early model results is then applied to identify influential inputs and guide subsequent efforts towards parameters that drive risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design of the Belgian Geological Disposal Facility for Category B and C Wastes - 19341

For more than 40 years, ONDRAF/NIRAS (the federal agency responsible for managing radioactive waste and enriched fissile materials in Belgium) has been studying the concept of a geological disposal facility (GDF), within poorly indurated clays, as an option for the long-term management of both category B waste (low-level and intermediate-level long-lived waste - LILW-LL) and category C waste (high-level waste - HLW and spent fuel). The proposed Belgian reference option for disposal of such waste is a GDF within poorly indurated clays, located at a depth of between 200 m and 600 m. Within the framework of the first Safety and Feasibility Case (SFC-1) undertaken by ONDRAF/NIRAS, the former GDF layout, which dates back from 2003 has been updated. The first part of the paper describes the main drivers behind the evolution of the former 2003 GDF design towards the current reference SFC-1 design. It also details how these drivers, related to operational and constructional constraints, have affected the GDF layout, such as the disposal gallery length, the crossing shapes of the GDF galleries and the layout of access and waste shafts. The second part of the paper focuses on the engineering and construction challenges generated by GDF development within poorly indurated clays. This includes discussion of the impact of the specific mechanical characteristics such poorly indurated clays have on the construction methods used for the shafts, the rock support (concrete lining), the drift connections, the crossings and the global GDF design. These construction methods have been selected based on research conducted at the underground research laboratory HADES in Mol (Belgium). Finally, the main axes for further development of the GDF design within the SFC-1 framework is presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Injection Modeling (AIM) Toolbox User Guide

The Aquifer Injection Modeling Toolbox (“AIM Toolbox”) software was developed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Environmental Protection Agency’s (EPA) to provide a collection of analytical solutions suitable for evaluating the potential extent of the area impacted by subsurface injection operations. Subsurface injection operations are regulated under the EPA’s Underground Injection Control (UIC) program and are typically related to oil/gas development, waste disposal, or subsurface mining or storage. The analytical algorithms provided in the AIM Toolbox each have different approaches/assumptions/focus with respect to the nature and processes in subsurface and the nature of the injection operations. Collectively the set of analysis algorithms provides a broader evaluation of the area that can potentially be impacted by an injection operation. By providing estimates for the injectate plume extent, the software supports technical aspects of planning, evaluation, and overseeing injection activities. That is, the results help assess when further regulatory controls (e.g., monitoring, reporting) may be required and, in the case of disposal into an underground source of drinking water, the extent of the impacted area would require exemption from protection under the Safe Drinking Water Act. The AIM Toolbox software is available as a single-page web application, providing an interface to provide the necessary inputs, and both chart and map panes for visualizing the results. This User Guide describes the AIM Toolbox software, information required, user interactions, and the underlying basis of the calculations.

54 ENVIRONMENTAL SCIENCES↗

Aquifer Injection Modeling (AIM) Toolbox User Guide

The Aquifer Injection Modeling Toolbox (“AIM Toolbox”) software was developed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Environmental Protection Agency’s (EPA) to provide a collection of analytical solutions suitable for evaluating the potential extent of the area impacted by subsurface injection operations. Subsurface injection operations are regulated under the EPA’s Underground Injection Control (UIC) program and are typically related to oil/gas development, waste disposal, or subsurface mining or storage. The analytical algorithms provided in the AIM Toolbox each have different approaches/assumptions/focus with respect to the nature and processes in subsurface and the nature of the injection operations. Collectively the set of analysis algorithms provides a broader evaluation of the area that can potentially be impacted by an injection operation. By providing estimates for the injectate plume extent, the software supports technical aspects of planning, evaluation, and overseeing injection activities. That is, the results help assess when further regulatory controls (e.g., monitoring, reporting) may be required and, in the case of disposal into an underground source of drinking water, the extent of the impacted area would require exemption from protection under the Safe Drinking Water Act. The AIM Toolbox software is available as a single-page web application, providing an interface to provide the necessary inputs, and both chart and map panes for visualizing the results. This User Guide describes the AIM Toolbox software, information required, user interactions, and the underlying basis of the calculations.

58 GEOSCIENCES↗

Waste Shielded Casks Transfer by Funicular from the Surface to Disposal Level in Cigeo - 20007

Andra is completing the detailed engineering phase of Cigeo - the French HLW and ILW-LL DGR. A funicular system is dedicated to the transfer of the waste disposal containers from the surface to the underground infrastructures down the nuclear access ramp. This paper explains the rationale having led to the choice of a funicular and presents the advantages of this system. Main technical components and mechanical performance of the funicular system are then detailed. Lastly, the ongoing two stages qualification testing program managed by Andra (in order to reach a level 6 on the international Technology Readiness Level scale) is discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

White Paper on Lithium-Ion Battery Safety for use in Safety Planning at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is an underground facility designed to safely dispose of radioactive waste. The WIPP uses many heavy vehicles to transport materials and equipment underground. Most of these vehicles are powered by traditional internal combustion engines (ICE) with diesel fuel. Recently, electric vehicles (EVs) powered with batteries have been used at the WIPP. EVs have very low operational and maintenance costs, not considering battery replacements, and they have zero emissions during operation. This absence of emissions makes them ideal for underground facilities with limited ventilation. Even if a facility has robust ventilation normally, ventilation systems can break down leading to restrictions in ICE powered operations. Figure 1 shows a rendering of the WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FCC-ee: The Lepton Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. On the other hand, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the domination of matter over antimatter, the evidence for dark matter and the non-zero neutrino masses. Theoretical issues that need to be addressed include the hierarchy problem, the neutrality of the Universe, the stability of the Higgs boson mass upon quantum corrections and the strong CP problem. This report contains the description of a novel research infrastructure based on a highest-luminosity energy frontier electron-positron collider (FCC-ee) to address the open questions of modern physics. It will be a general precision instrument for the continued in-depth exploration of nature at the smallest scales, optimised to measure precisely the properties of the Higgs boson at the per-cent level, the Z and W bosons, the top quark and the Higgs coupling to the Z at the per-mil level. FCC-ee will provide unprecedented sensitivity to signs of new physics appearing either in the form of small deviations from the Standard Model or as rare decay processes. This collider will be implemented in stages, successively spanning the entire energy range from the Z pole over the WW threshold and H production peak to the t"t" ̅ threshold. Most of the infrastructure (e.g. underground structures, surface sites, electrical distribution, cooling & ventilation, RF systems) can be directly re-used for a subsequent highest-energy hadron collider (described in the FCC conceptual design report volume 3), serving the world-wide particle-physics community in a highly synergetic and cost-effective manner throughout the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular lepton collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy, highest-luminosity circular lepton collider exists today. The FCC-ee concept comprises a power-saving twin-aperture magnet system, a continuous top-up injection scheme for stable operation and maximum integrated luminosity. Combined with an energy staging scheme, the FCC-ee represents the most efficient and most sustainable route for executing the research required to discover signs of new physics beyond the Standard Model. The step-wise energy increase of the FCC-ee does not require any additional civil engineering activities. Strategic R&D for FCC-ee aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate residual technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, building the international machine and experiment consortia, developing a territorial implementation plan in agreement with the host-states’ requirements, optimising the disposal of land and underground volumes and preparing the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

FCC-hh: The Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a highest-energy hadron collider with a centre-of-mass collision energy of 100 TeV and an integrated luminosity of at least a factor of 5 larger than the HL-LHC. It will extend the current energy frontier by almost an order of magnitude. The mass reach for direct discovery will reach several tens of TeV, and allow, for example, to produce new particles whose existence could be indirectly exposed by precision measurements during the earlier preceding e+e– collider phase. This collider will also precisely measure the Higgs self-coupling and thoroughly explore the dynamics of electroweak symmetry breaking at the TeV scale, to elucidate the nature of the electroweak phase transition. WIMPs as thermal dark matter candidates will be discovered, or ruled out. As a single project, this particle collider infrastructure will serve the world-wide physics community for about 25 years and, in combination with a lepton collider (see FCC conceptual design report volume 2), will provide a research tool until the end of the 21st century. Collision energies beyond 100 TeV can be considered when using high-temperature superconductors. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular energy frontier collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy circular hadron collider can be brought to the technology readiness level required for constructing within the coming ten years through a focused R&D programme. The FCC-hh concept comprises in the baseline scenario a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. On a longer timescale, high-temperature superconductors can be developed together with industrial partners to achieve an even more energy efficient particle collider or to reach even higher collision energies.The re-use of the LHC and its injector chain, which also serve for a concurrently running physics programme, is an essential lever to come to an overall sustainable research infrastructure at the energy frontier. Strategic R&D for FCC-hh aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate technology-related risks and ensure that industry can benefit from an acceptable utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan in agreement with the host-states’ requirements, to optimise the disposal of land and underground volumes, and to prepare the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Pore-Scale Analysis of the Permeability Damage and Recovery during Cyclic Freshwater and Brine Injection in Porous Media Containing Non-Swelling Clays

Permeability damage in subsurface porous media caused by clay mobilization is encountered in many engineering applications, such as geothermal energy, water disposal, oil recovery, and underground CO2 storage. During the freshwater injection into rocks containing brine, the sudden decrease in salinity causes native clay fines to detach and clog pore throats, leading to a significant decline in permeability. The clay fines detach due to weakened net-attractive forces binding them to each other and the grain. Past experiments link this permeability damage on the immediate history of the salinity and the direction of flow. To better understand this phenomenon, we conducted pore-scale simulations of cyclic injection of freshwater and brine into sandstone containing Kaolinite clay. Our simulations establish a link between the clay-fine trajectory and the permeability trend observed by Khilar and Fogler (1983). For a uniform clay size of 3 microns, we observe a permeability decline by two orders of magnitude during freshwater injection with respect to brine injection. Increasing salinity and simultaneously reversing flow direction restores the permeability. The permeability restoration upon reversing the brine flow direction is attributed to the unblocking of pore throats in the reverse direction by the movement of the clay particles along the grain surfaces by the hydrodynamic force and the strong net-attractive force under high salinity.

Bhuvankar, Pramod (ORCID:000000027739973X)↗

Determination of permeability for hydrocarbon release due to excavation-induced stress redistribution in rock salt

Due to a stress redistribution after the excavation of an underground tunnel for radioactive waste disposal, an Ed/DZ (excavation disturbed/damaged zone) will be generated in the near field of the opening, resulting in significant changes in the hydraulic and mechanical properties of the rock mass in the zone. Initially more or less randomly distributed hydrocarbons at grain boundaries in rock salt, which sometimes can only be observed with ultraviolet light, can then be mobilised and migrate at a potentially significant rate towards the excavation. Within the international cooperative project DECOVALEX 2019, the migration mechanism of such fluid inclusions in rock salt is being studied intensively. Specifically, a multi-scale modelling strategy has been developed. A macroscale coupled hydro-mechanical modelling of an underground excavation was performed to determine hydraulic and time-dependent deviatoric stress conditions, by taking into account the rock salt creep behaviour. Under the obtained macro-scale constraints, micro-scale modelling of a pathway dilation along halite grain boundaries was performed using different model strategies: a) coupled hydromechanical modelling with a consideration of hydraulic pressure-induced dilatant deformation, b) nonlinear dynamic model taking account of fluid migration, stress-dependent grain boundary wetting and shear-induced dilatancy of salt, and c) phase-field modelling of flow pathway propagation. The permeability increase resulting from the pathway dilation is estimated to be as high as two orders of magnitude. Based on the permeability determined, a series of pressure buildups measured from a borehole with a high hydrocarbon release rate, a total of 430 build-ups within a monitoring time of 938 days, can be simulated with a macro-scale compressible flow model accounting for different zones around the opening.

58 GEOSCIENCES↗

Environmental Projects. Volume 8: Modifications of wastewater evaporation ponds

The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 45 miles north of Barstow, California, and about 160 miles northeast of Pasadena, is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards: use of hazardous chemicals, asbestos, and underground storage tanks as well as the generation of hazardous wastes and the disposal of wastewater. Federal, state, and local laws governing the management of hazardous substances, asbestos, underground storage tanks and wastewater disposal have become so complex there is a need to devise specific programs to comply with the many regulations that implement these laws. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL, and the GDSCC have adopted a position that their operating installations shall maintain a high level of compliance with these laws. One of the environmental problems at the GDSCC involved four active, operational, wastewater evaporation ponds designed to receive and evaporate sewage effluent from upstream septic tank systems. One pair of active wastewater evaporation ponds is located at Echo Site, while another operational pair is at Mars Site.

Source record↗

An Overview of R and D on Retrievability and Retrieval Technology in Germany - 20462

Retrievability is a term that is included in most radioactive waste management programs around the world. Although national definitions vary, the overall understanding of retrievability concerns the ability to recover waste packages from the repository mine after their emplacement. Different countries may implement retrievability in very different ways, ranging from a built-in reversibility into the emplacement process to the stipulation that retrievability may in no way impede passive safety in the post-closure phase. Germany takes a middle course such that retrievability in a HLW repository (repository for high level radioactive waste) may have no significant detrimental effect on passive safety. In Germany, the current siting process considers rock salt, clay rock, and crystalline rock as potential host rocks. Therefore, Research and Development (R and D) has been investigating repository concepts and retrievability in all host rocks. After introduction of retrievability in 2010, existing repository concepts were modified to facilitate retrieval. The changes made comprised, for example, equipping boreholes with steel liners, developing new technologies, and modifying existing emplacement devices. Apart from retrieval of HLW, retrieval of other wastes from underground repositories that were designed and operated without retrievability in mind, poses major technical and scientific challenges. Currently, studies are under way to investigate the feasibility and costs of partial retrieval of waste from an underground repository for hazardous and highly toxic waste in France, Stocamine. With regard to retrieval, the rock-mechanical conditions are deteriorating rapidly, so time is of the essence. In the Asse II mine in Germany, about 126,500 waste casks with low and intermediate level waste await retrieval. The repository mine suffers from difficult rock-mechanical conditions and inflow of brine, locally into emplacement areas. The Federal Company for Radioactive Waste Disposal (BGE) is legally required to retrieve all wastes from the Asse. Due to the specific challenges, R and D is needed to develop technical solutions for the safe retrieval from each of the emplacement chambers. R and D on retrievability and retrieval technology does not only address challenges in radioactive or toxic waste retrieval but may also help to germinate innovation to better master complex underground situations in general, e.g. in deep mining, tunneling, or repository construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model Development for Thermal-Hydrology Simulations of a Full-Scale Heater Experiment in Opalinus Clay

Disposal of commercial spent nuclear fuel in a geologic repository is studied. In situ heater experiments in underground research laboratories provide a realistic representation of subsurface behavior under disposal conditions. Here, this study describes process model development and modeling analysis for a full-scale heater experiment in opalinus clay host rock. The results of thermal-hydrology simulation, solving coupled nonisothermal multiphase flow, and comparison with experimental data are presented. The modeling results closely match the experimental data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗