Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UESCs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guidance and Recommendations for Streamlining Reporting for Federal Energy and Water Efficiency Projects

Federal agencies are required to report on their progress in meeting various energy and water management requirements. These reporting requirements encompass energy and water projects at federal facilities, including projects that are alternatively financed, e.g., conducted through energy savings performance contracts (ESPCs) or utility energy service contracts (UESCs). The purpose of this guidance is to provide recommendations to streamline federal agency reporting. The guidance recommends the use of eProject Builder (ePB), a project development and archiving tool for energy projects. ePB carries additional value in its simplification of federal agency reporting by dovetailing with the Federal Energy Management Program’s (FEMP’s) EISA 432 Compliance Tracking System (CTS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Procurement Options for Low Temperature Geothermal Technologies at Federal Facilities

Federal agencies are moving towards more efficient and resilient facilities by increasingly implementing energy projects in an effort to meet federally mandated goals, agency needs, and administration priorities. Low temperature geothermal technologies, which include geothermal heat pumps (GHP) and district heating systems, can contribute to meeting these goals. These technologies provide facilities with heating and cooling while reducing facility energy use and improving resilience. However, in order to implement these solutions, federal facilities must identify and execute a strategy for the procurement of these technologies. Federal facilities have successfully completed energy efficiency projects using a variety of procurement options. The purpose of this document is to provide federal agencies with a comprehensive overview of the procurement options available for low temperature geothermal technologies and other energy efficiency projects. The procurement options discussed include third-party financing mechanisms such as energy saving performance contracts (ESPCs), ESPC energy sales agreements (ESPC ESAs), and utility energy service contracts (UESCs), as well as dedicated funds in the form of federal grants and appropriated funds.

15 GEOTHERMAL ENERGY↗

Case Studies in Leveraging Performance Contracts for Resilience Projects

The resilience of federal facilities has become increasingly important among lawmakers, agency leadership, and the American public as high impact natural hazards occur more frequently over time. Resilience is broadly defined as the ability of a federal facility to withstand, respond to, and recover rapidly from disruptions to maintain critical functions. The Department of Energy (DOE) Federal Energy Management Program (FEMP) was codified to facilitate the strengthening of federal energy and water efficiency and resilience. Performance contracting is one of the mechanisms through which federal agencies can finance projects at their facilities, but resilience improvement measures do not always result in utility cost savings, which are the primary driver behind performance contracts. This report provides example cases where performance contracts, specifically energy savings performance contracts (ESPC) or utility energy service contracts (UESCs), were used to implement a resilience measure at a federal facility.

99 GENERAL AND MISCELLANEOUS↗

Performance contracting centers of expertise: a framework for federal implementation

This report examines the establishment and operation of Energy Performance Contracting (EPC) Centers of Expertise (COEs) within the federal government. EPCs, including Energy Savings Performance Contracts (ESPCs) and Utility Energy Service Contracts (UESCs), are critical mechanisms for advancing energy efficiency, resilience, and infrastructure modernization without the need for significant upfront appropriations. However, EPCs require specialized knowledge in project development, contracting, financing, legal parameters and technical project oversight. Currently federal agencies have varying levels of expertise and institutionalized policy to effectively and consistently use congressionally authorized EPCs which have decades of proven and impactful use. To address these challenges, several federal agencies have created COEs to centralize expertise, standardize practices, and streamline implementation. This report reviews statutory and policy drivers, highlights the benefits and challenges and presents case studies from the General Services Administration (GSA), the Department of Veterans Affairs (VA) and the U.S. Army Engineering and Support Center Huntsville (HNC). Recommendations are also provided for agencies considering the establishment of EPC COEs, which will bring much needed structure, consistency and lead to implementation of these energy and infrastructure building projects to save costs for U.S. taxpayers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Army Reserve Comprehensive Water Efficiency Assessments

The Army Reserve has partnered with the Pacific Northwest National Laboratory (PNNL) to develop comprehensive water assessments for numerous Army Reserve Centers in all five regions including the Pacific islands and Puerto Rico, and at Fort Buchanan and Fort Hunter Liggett. The objective of these assessments is to quantify water use at the site, and identify innovative water efficiency projects that can be implemented to help reduce water demand and increase efficiency. Several of these assessments have focused on a strategic plan for achieving net zero water to help meet the Army’s Net Zero Directive . The Army Reserve has also leveraged this approach as part of the energy conservation investment program (ECIP), energy savings performance contracts (ESPCs), and utility energy service contracts (UESCs). This article documents the process involved.

McMordie Stoughton, Kate↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Commissioning Guidance for Energy Savings Performance Contracts (ESPCs)

This Commissioning Guidance for Energy Savings Performance Contracts (ESPCs) is DOE’s official guidance for ordering agencies under the current DOE ESPC IDIQ contract. This guidance document explains how commissioning of energy conservation measures (ECMs) and water conservation measures (WCMs) is incorporated into the ESPC process, roles and responsibilities in project commissioning, and key elements of commissioning. This document updates the previous version, released in 2015. This guidance can also be used as applicable in the development of ESPC ENABLE and UESC performance assurance plans.

Walker, Christine↗

Determining Price Reasonableness in Energy Performance Contracts

Report provides recommendations and best practices concerning fair and reasonable price determination in federal energy performance contracts (EPCs), which include energy savings performance contracts (ESPCs) and utility energy service contracts (UESCs). It reflects the experiences, lessons learned, and best practices of agencies implementing EPCs, and is consistent with FEMP’s training on this subject. This is an update to the 2015 revision.

Dominy, Russ [Boston Government Services (BGS)]↗

Utility Energy Service Contract Guide

This guide serves as a key resource for acquisition teams developing utility energy service contracts (UESC) with an emphasis on using a task order to acquire energy management services under a General Services Administration areawide contract. The guide features a compilation of templates to assist your efforts from acquisition planning through awarding a task order for design and installation.

Cali, Peter [National Renewable Energy Laboratory ↗

Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FEMP Renewable Energy Program Overview

Fact sheet describing how the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) provides Federal agencies with information, guidance, and assistance in using renewable energy.

Department of Energy↗