Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trajectory Correction Maneuver”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Mars Exploration Rover Cruise Orbit Determination

The Mars Exploration Rover project consisted of two missions (MER-A: spirit rover and MER-B: opportunity rover) that launched spacecraft on June 10, 2003, and July 8, 2003, respectively. The spacecraft arrived at Mars approximately seven months later on January 4, 2004, and January 24, 2004. These spacecraft needed to be precisely navigated to a Mars atmospheric entry flight path angle of -11.5 deg +/-0.12 deg (3(sigma)) for MER-A and +/-0.14 deg (3(sigma)) for MER-B in order to satisfy the landing site delivery requirements. The orbit determination task of the navigation team needed to accurately determine the trajectory of the spacecraft, predict the trajectory to Mars atmospheric entry, and account for all possible errors sources so that the each spacecraft could be correctly targeted using five trajectory corrections along the way. This paper describes the orbit determination analysis which allowed MER-A to be targeted using only four trajectory correction maneuvers to an entry flight path angle of -11.49 deg +/-O.010 deg (3(sigma)) and MER-B to be targeted using only three trajectory correction maneuvers to an entry flight path angle of -11.47 +/-0.021 deg(3(sigma)).

navigation↗

Maneuver Design for the Juno Mission: Inner Cruise

The Juno spacecraft launched in August 2011 and, following a successful Earth flyby in October 2013, is on course for a nominal orbit insertion at Jupiter in July 2016. This paper examines the design and execution of deterministic and statistical trajectory correction maneuvers during the first approximately 27 months of post-launch operations that defined the "Inner Cruise" phase of the Juno mission. Topics of emphasis include the two deep space maneuvers, Earth flyby altitude biasing strategy, and the sequence of trajectory correction maneuvers executed in the weeks prior to the successful Earth gravity assist.

Pavlak, Thomas A.↗

Mars Science Laboratory Navigation Results

The Mars Science Laboratory (MSL), carrying the Curiosity rover to Mars, was launched on November 26, 2011, from Cape Canaveral, Florida. The target for MSL was selected to be Gale Crater, near the equator of Mars, with an arrival date in early August 2012. The two main interplanetary navigation tasks for the mission were to deliver the spacecraft to an entry interface point that would allow the rover to safely reach the landing area, and to tell the spacecraft where it entered the atmosphere of Mars, so it could guide itself accurately to close proximity of the landing target. MSL used entry guidance as it slowed down from the entry speed to a speed low enough to allow for a successful parachute deployment, and this guidance allowed shrinking the landing ellipse to a 99% conservative estimate of 7 by 20 kilometers. Since there is no global positioning system in Mars, achieving this accuracy was predicated on flying a trajectory that closely matched the reference trajectory used to design the guidance algorithm, and on initializing the guidance system with an accurate Mars-relative entry state that could be used as the starting point to integrate the inertial measurement unit data during entry and descent. The pre-launch entry flight path angle (EFPA) delivery requirement was +/- 0.20 deg, but after launch a smaller threshold of +/- 0.05 deg was used as the criteria for late trajectory correction maneuver (TCM) decisions. The pre-launch requirement for entry state knowledge was 2.8 kilometers in position error and 2 meters per second in velocity error, but also smaller thresholds were defined after launch to evaluate entry state update opportunities. The biggest challenge for the navigation team was to accurately predict the trajectory of the spacecraft, so the estimates of the entry conditions could be stable, and late trajectory correction maneuvers or entry parameter updates could be waved off. As a matter of fact, the prediction accuracy was such that the last TCM performed was a small burn executed eight days before landing, and the entry state that was calculated just 36 hours after that TCM, and that was uploaded to the spacecraft the same day, did not need to be updated. The final EFPA was 0.013 deg shallower than the -15.5 deg target, and the on-board entry state was just 200 meters in position and 0.11 meters per second in velocity from the post-landing reconstructed entry state. Overall the entry delivery and knowledge requirements were fulfilled with a margin of more than 90% with respect to the pre-launch thresholds. This excellent accuracy contributed to a very successful and accurate entry, descent, and landing, and surface mission.

navigation↗

Halo Orbit Mission Correction Maneuvers Using Optimal Control

This paper addresses the computation of the required trajectory correction maneuvers (TCM) for a halo orbit space mission to compensate for the launch velocity errors introduced by inaccuracies of the launch vehicle.

Halo Orbit trajectory error correction optimal con↗

Early Navigation Performance of the OSIRIS-REx Approach to Bennu

The New Frontiers-class OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer) mission is the first American endeavor to return a sample from an asteroid. In preparation for retrieving the sample, OSIRIS-REx is conducting a campaign of challenging proximity-operations maneuvers and scientific observations, bringing the spacecraft closer and closer to the surface of near-Earth asteroid (101955) Bennu. Ultimately, the spacecraft will enter a 900-meter-radius orbit about Bennu and conduct a series of reconnaissance flybys of candidate sample sites before being guided into contact with the surface for the Touch and Go sample collection event. Between August and December 2018, the OSIRIS-REx team acquired the first optical observations of Bennu and used them for navigation. We conducted a series of maneuvers with the main engine, Trajectory Correction Maneuver, and Attitude Control System thruster sets to slow the OSIRIS-REx approach to Bennu and achieve rendezvous on December 3, 2018. This paper describes the trajectory design, navigation conops, and key navigation results from the Approach phase of the OSIRIS-REx mission.

Antreasian, Peter G.↗

Mars Exploration Rovers Launch Performance and TCM-1 Maneuver Design

The Mars Exploration Rover (MER) project successfully landed two identical rovers on Mars in order to remotely conduct geologic investigations, including characterization of rocks and soils that may hold clues to past water activity. Two landing sites, Gusev crater and Meridiani Planum, were selected out of nearly 200 candidate sites after balancing science returns and flight system engineering and safety. Precise trajectory targeting and control was necessary to achieve the atmospheric entry requirements for the selected landing sites within the flight system constraints. This paper discusses the expected and achieved launch vehicle performance and the impacts of that performance on the first Trajectory Correction Maneuver (TCM-1) while maintaining targeting flexibility in accommodating additional project concerns about landing site safety and possible in-flight retargeting to alternate landing sites.

Trajectory Correction Maneuvers (TCMs)↗

Maneuver design overview of the 2018 InSight Mars lander mission

Launched on May 5, 2018, the Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) spacecraft landed safely on Mars on November 26, 2018. To deliver the lander accurately to the landing site, six trajectory correction maneuvers (TCMs) were planned along the reference trajectory from Earth launch to Mars entry. For the last two TCMs, there were two corresponding contingency TCMs planned that could be executed in the event that the corresponding nominal one failed. There were also twenty pre-designed menu TCMs available for execution at the time of the last contingency TCM, about 8 hours before the Mars entry, descent, and landing. This navigation paper overviews the maneuver design of each TCM, as well as how each one actually performed during operations.

Wallace, Mark↗

Flight Path Control Analysis for Parker Solar Probe

An unprecedented NASA mission to study the Sun, known as Parker Solar Probe (PSP), is under development. The primary objective of the PSP mission is to gather new data within 10 solar radii of the Sun’s center. The purpose of this paper is to review the statistical analysis of trajectory correction maneuvers (TCMs) for PSP’s baseline trajectory. The baseline mission includes a total of 42 TCMs that will be accomplished with a monopropellant propulsion system that consists of twelve 4.4 N thrusters. Assuming current navigation models, statistical analyses for each reference trajectory during the 20-day launch period result in a total V99 of less than 100 m/s.

Mottinger, Neil↗

Lunar Prospector Orbit Determination Results

The orbit support for Lunar Prospector (LP) consists of three main areas: (1) cislunar orbit determination, (2) rapid maneuver assessment using Doppler residuals, and (3) routine mapping orbit determination. The cislunar phase consisted of two trajectory correction maneuvers during the translunar cruise followed by three lunar orbit insertion burns. This paper will detail the cislunar orbit determination accuracy and the real-time assessment of the cislunar trajectory correction and lunar orbit insertion maneuvers. The non-spherical gravity model of the Moon is the primary influence on the mapping orbit determination accuracy. During the first two months of the mission, the GLGM-2 lunar potential model was used. After one month in the mapping orbit, a new potential model was developed that incorporated LP Doppler data. This paper will compare and contrast the mapping orbit determination accuracy using these two models. LP orbit support also includes a new enhancement - a web page to disseminate all definitive and predictive trajectory and mission planning information. The web site provides definitive mapping orbit ephemerides including moon latitude and longitude, and four week predictive products including: ephemeris, moon latitude/longitude, earth shadow, moon shadow, and ground station view periods. This paper will discuss the specifics of this web site.

Beckman, Mark↗

The application of lissajous orbits for the SIRTF mission

A lissajous orbit about L2 provides an ideal observation geometry for the SIRTF mission. To avoid contamination, the baseline SIRTF spacecraft uses a low thrust helium cold gas propulsion system. Three types of maneuvers are required for the L2 mission: trajectory correction maneuvers (TCM), lissajous orbit insertion maneuver (LOI), and orbit maintenance maneuvers (OMM). Analysis shows a total thrust level of 0.1 N is sufficient to achieve LOI and the smaller OMMs. Rough estimates indicate thrst level greater than 1N is needed to perform the TCMs. A hybrid hydrazine/cold gas propulsion system provides a possible solution.

Lo, Martin↗

2011 Mars Science Laboratory Trajectory Reconstruction and Performance from Launch Through Landing

The Mars Science Laboratory (MSL) mission successfully launched on an Atlas V 541 Expendable Evolved Launch Vehicle (EELV) from the Eastern Test Range (ETR) at Cape Canaveral Air Force Station (CCAFS) in Florida at 15:02:00 UTC on November 26th, 2011. At 15:52:06 UTC, six minutes after the MSL spacecraft separated from the Centaur upper stage, the spacecraft transmitter was turned on and in less than 20 s spacecraft carrier lock was achieved at the Universal Space Network (USN) Dongara tracking station located in Western Australia. MSL, carrying the most sophisticated rover ever sent to Mars, entered the Martian atmosphere at 05:10:46 SpaceCraft Event Time (SCET) UTC, and landed inside Gale Crater at 05:17:57 SCET UTC on August 6th, 2012. Confirmation of nominal landing was received at the Deep Space Network (DSN) Canberra tracking station via the Mars Odyssey relay spacecraft at 05:31:45 Earth Received Time (ERT) UTC. This paper summarizes in detail the actual vs. predicted trajectory performance in terms of launch vehicle events, launch vehicle injection performance, actual DSN/USN spacecraft lockup, trajectory correction maneuver performance, Entry, Descent, and Landing events, and overall trajectory and geometry characteristics.

trajectory↗

Mars 2020 Perseverance trajectory reconstruction and performance from launch through landing

The Mars 2020 (M2020) Mission carrying Perseverance, the most advanced rover ever sent to Mars, successfully launched on an Atlas V 541 (AV-088) launch vehicle from the Eastern Test Range (ETR) at Cape Canaveral Air Force Station (CCAFS) in Florida at 11:50:00 UTC (T-Zero time) on July 30, 2020. After some station reconfiguration, carrier/telemetry were locked at both Deep Space Network (DSN) Canberra and Goldstone stations. Perseverance entered the Martian atmosphere at 20:36:50 Spacecraft Event Time (SCET) UTC, and landed inside Jezero Crater at 20:43:49 SCET UTC on February 18, 2021. Confirmation of nominal landing was received at the DSN Goldstone and Madrid tracking stations via the Mars Reconnaissance Orbiter at 20:55:11 Earth Received Time (ERT) UTC. This paper summarizes in detail the actual vs. predicted performance in terms of launch vehicle events, launch vehicle injection performance, actual DSN spacecraft lockup, trajectory correction maneuver performance, Entry, Descent, and Landing events, and overall trajectory and geometric characteristics.

Abilleira, Fernando↗

Mars 2020 Perseverance Trajectory Reconstruction and Performance from Launch through Landing

The Mars 2020 (M2020) Mission carrying Perseverance, the most advanced rover ever sent to Mars, successfully launched on an Atlas V 541 (AV-088) launch vehicle from the Eastern Test Range (ETR) at Cape Canaveral Air Force Station (CCAFS) in Florida at 11:50:00 UTC (T-Zero time) on July 30, 2020. After some station reconfiguration, carrier/telemetry were locked at both Deep Space Network (DSN) Canberra and Goldstone stations. Perseverance entered the Martian atmosphere at 20:36:50 Spacecraft Event Time (SCET) UTC, and landed inside Jezero Crater at 20:43:49 SCET UTC on February 18, 2021. Confirmation of nominal landing was received at the DSN Goldstone and Madrid tracking stations via the Mars Reconnaissance Orbiter at 20:55:11 Earth Received Time (ERT) UTC. This paper summarizes in detail the actual vs. predicted performance in terms of launch vehicle events, launch vehicle injection performance, actual DSN spacecraft lockup, trajectory correction maneuver performance, Entry, Descent, and Landing events, and overall trajectory and geometric characteristics.

Wong, Mau↗

Robust Trajectory Optimization for NRHO Rendezvous Using SPICE Kernel Relative Motion

In this paper, robust optimization is performed on trajectory correction maneuvers during the lunar lander return phase of an Artemis mission, treating the trajectory from one hour after low lunar orbit departure to arrival in the vicinity of the lunar Gateway as a relative motion problem. To enable rapid stochastic optimization techniques requiring many candidate trajectories, SPICE kernel relative motion as implemented by the Quadratic Interpolated State Transition (QIST) system is used as the underlying dynamics propagation. The optimization is performed with a genetic optimizer using linear covariance (LinCov) software in a simplified operational context, taking into account the availability of navigation sensors with varying measurement models, ranges, and accuracies. No numerical integration is used, since the relative motion around Gateway is fully characterized with the a priori computation of the QIST coefficients. Maneuver placements are computed to optimize the minimum 3σ delta-v of the trajectory, the position dispersion at a target point, and a convex combination of these two metrics. An order of magnitude runtime improvement is provided over legacy methods with less than 10% error introduced. All QIST results are shown to be in-family with legacy methods. The tradespace for optimal delta-v design is found to range from 77.0 to 93.9 m/s, while the range of optimal dispersion is between 1.4 and 11.7 km.

Relative Motion↗

Sensitivity of Optimal Midcourse Correction Scheduling for Robust Cislunar Trajectory Design

A new approach to optimal trajectory design is the determination of optimal trajectories that are robust to initial trajectory dispersions, navigation errors, maneuver execution errors, and environment modeling errors. This paper investigates the sensitivity of cislunar robust optimal trajectory design to launch date, duration of navigation measurement passes, and navigation measurement frequency. For a given cislunar trajectory from translunar injection (TLI) to lunar orbit insertion (LOI), the optimal locations of midcourse corrections, also known as trajectory correction maneuvers (TCM) are determined by minimizing the final 3-σ ∆v subject to a final 3-σ position dispersion constraint for a given launch date, specified measurement pass duration prior to each maneuver, and measurement frequency. Optical navigation (OpNav) is assumed, and OpNav field-of-view (FOV) and lighting constraints are employed. These constraints turn out to be important elements of the problem. The sensitivity of the optimal TCM locations are then investigated by varying the launch date, duration of OpNav measurement passes, and the OpNav measurement frequency, and then re-optimizing the locations of the TCMs. Given the problem parameters provided herein, results show that while the optimal TCM locations with respect to TLI vary greatly from one launch date to another, their locations with respect to LOI are nearly invariant over a 2-month launch window. Results also show that in all cases the optimal location of the last TCM is found to be at the point where the OpNav lunar FOV constraint is first violated. For all other TCMs, OpNav measurement pass duration and measurement frequency can have a moderate to large affect on the optimal TCM locations.

Linear Covariance Analysis↗

Wild2 approach maneuver strategy used for Stardust spacecraft (extended abstract)

Stardust, NASA's first dedicated sample return mission to a comet, successfully flew through the comet dust around Wold2 on January 2, 2004. The spacecraft flew within 236 km of the comet, meeting the mission requirement of 250+/- 50 km on flyby distance. Stardust collected dust particles and took several images of the comet while flying close to Wild2. The spacecraft will return to earth with the comet samples on January 15, 2006. To accomplish the above objective, a large Deep Space Maneuver (DSM#) was implemented during June 17 and 18, 2003 and a series of Trajectory Correction Maneuvers (TCMs) were also implemented during the 30 days prior to encounter. Both maneuver design and executions were influenced by number of factors including the small body ephemeris uncertainty, predictability of small forces arising from 3-axis attitude limit cycling and spacecraft slews. Maneuver design processes, including contingency plans, and maneuver performance characteristics, are discussed in this paper.

dust↗

Solar Torque Management for the Near Earth Asteroid Scout CubeSat Using Center of Mass Position Control

A novel mechanism, the Active Mass Translator (AMT), has been developed for the NASA Near Earth Asteroid (NEA) Scout mission to autonomously manage the spacecraft momentum. The NEA Scout CubeSat will launch as a secondary payload onboard Exploration Mission 1 of the Space Launch System. To accomplish its mission, the CubeSat will be propelled by an 86 square-meter solar sail during its two-year journey to reach asteroid 1991VG. NEA Scout's primary attitude control system uses reaction wheels for holding attitude and performing slew maneuvers, while a cold gas reaction control system performs the initial detumble and early trajectory correction maneuvers. The AMT control system requirements, feedback architecture, and control performance will be presented. The AMT reduces the amount of reaction control propellant needed for momentum management and allows for smaller capacity reaction wheels suitable for the limited 6U spacecraft volume. The reduced spacecraft mass allows higher in-space solar sail acceleration, thus reducing time-of-flight. The reduced time-of-flight opens the range of possible missions, which is limited by the lifetime of typical non-radiation tolerant CubeSat avionics exposed to the deep-space environment.

Orphee, Juan↗